Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.6 LAccepted-Finance P 45 KHIRODE VIDYA BINOD AVENUE KOLKATA 700003 | KOLKATA | WEST BENGAL | 700003 | L1 | Accepted-Finance Being a lowest bidder and reasonable | |
| 2 | L2₹32.9 L+₹4.3 L (14.9%)Rejected-Finance 197 PATHAK PARA ROAD KOLKATA 700060 | KOLKATA | KOLKATA | WEST BENGAL | 700060 | L2 | Rejected-Finance Other than lowest | |
| 3 | L3₹34.6 L+₹6.0 L (21.0%)Rejected-Finance 52A 1A NAZIR LANE KIDDERPORE KOLKATA 700023 | KOLKATA | KOLKATA | WEST BENGAL | 700023 | L3 | Rejected-Finance Other than lowest | |
| 4 | L4₹36.2 L+₹7.6 L (26.6%)Rejected-Finance PO CHANDL PS BISHNUPUR DIST SOUTH 24 PGS PIN 743503 | 24 PARAGANAS SOUTH | WEST BENGAL | 743503 | L4 | Rejected-Finance Other than lowest | |
| 5 | L5₹38.0 L+₹9.4 L (32.9%)Rejected-Finance 01 PATHWALIYA GONDA GONDA GONDA UTTAR PRADESH 271001 | GONDA | UTTAR PRADESH | 271001 | L5 | Rejected-Finance Other than lowest |
| Sl No | Description | Qty | Unit | MAZUMDER ENTERPRISE L7 | JOY RAM ENTERPRISE L8 | JAGATMATA ENTERPRISE L2 | S.K. TRADERS L5 | UNITED ENGINEERS L4 | M/S S. K. SARKAR L3 | UNIVERSAL TRADING CENTRE L1 | SK CONSTRUCTION SYNDICATE & ENGG CO L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches in any type of soil not exceeding 1.5 meter wide and not exceeding 1.5M in depth for laying of Cables, poles, stay and getting out of excavated material complete all as specified and directed by Engineer-in-Charge | 127 | CUM | 152 ₹19,304 | 160 ₹20,320 | 110 ₹13,970 | 140 ₹17,780 | 128 ₹16,256 | 120 ₹15,240 | 90 ₹11,430 Lowest | 146 ₹18,542 |
| 2.00 | Excavation in Trenches exc. for each additional 1.5m or part thereof in depth beyond the first 1.5 m for laying of steel tubular pole/Stays, etc., getting out including forming bottom surface to required level and gradient in Soft/ Loose Soil and getting out, complete all as specified and as directed. | 3 | CUM | 162 ₹486 | 168 ₹504 | 125 ₹375 | 148 ₹444 | 140 ₹420 | 132 ₹396 | 110 ₹330 Lowest | 154 ₹462 |
| 3.00 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25cm thick each, excavated soil in trenches after the cables have been laid and tested complete all as specified and directed by Engineer-in-Charge | 114.3 | CUM | 120 ₹13,716 | 127 ₹14,516.1 | 84 ₹9,601.2 | 105 ₹12,001.5 | 96 ₹10,972.8 | 90 ₹10,287 | 70 ₹8,001 Lowest | 114 ₹13,030.2 |
| 4.00 | Removal of surplus soil to a distance not exc. 50m and deposited where directed at a level not exc. 1.5 m above the starting point all as specified and as directed. | 12.7 | Cum | 118 ₹1,498.6 | 125 ₹1,587.5 | 75 ₹952.5 Lowest | 110 ₹1,397 | 92 ₹1,168.4 | 78 ₹990.6 | 80 ₹1,016 | 106 ₹1,346.2 |
| 5.00 | M&L for sand cushioning as per para 19.75 of SSR Part-I(2009) in trenches for underground cable protection and consolidated and compacted with clean dry sand complete all as specified and directed by engineer-in-charge.
NOTE: Punned thickness only shall be measured for payment. | 115 | CUM | 2,700 ₹3,10,500 | 2,850 ₹3,27,750 | 2,400 ₹2,76,000 | 2,600 ₹2,99,000 | 2,500 ₹2,87,500 | 2,450 ₹2,81,750 | 2,000 ₹2,30,000 Lowest | 2,800 ₹3,22,000 |
| 6.00 | M&L for Brick protection with subclass ‘B’ bricks old size, laid dry, flat over cable perpendicular across the cable in trenches complete all as specified. | 4,500 | Each | 16 ₹72,000 | 18 ₹81,000 | 13 ₹58,500 | 15 ₹67,500 | 14.5 ₹65,250 | 14 ₹63,000 | 12 ₹54,000 Lowest | 17 ₹76,500 |
| 7.00 | Laying Only Serviceable Bricks after cleaning by wire brush obtained from taking out unserviceable LT cable in connected items here-in-after. | 4,000 | Each | 1 ₹4,000 | 2 ₹8,000 | 0.1 ₹400 Lowest | 0.75 ₹3,000 | 0.4 ₹1,600 | 0.5 ₹2,000 | 0.25 ₹1,000 | 0.6 ₹2,400 |
| 8.00 | Taking out of interlocking paver block, any shape or size and Re-laying the same after removing all vegetation, algae, grass etc, laid to proper slope & gradient over sand cushioning complete all as specified and directed.
(NOTE: Sand, if required for correction of cushioning level will be measured and paid separately. Replacement of broken paver block shall be paid separately as "Supply only") | 50 | Sqm | 60 ₹3,000 | 66 ₹3,300 | 18 ₹900 | 42 ₹2,100 | 35 ₹1,750 | 15 ₹750 Lowest | 20 ₹1,000 | 56 ₹2,800 |
| 9.00 | Material and labour for machine pressed precast concrete interlocking paver block with grey cement and pigment of any shape and size as approved by GE conforming to IS 15658-2006 of 60 mm thickness, M-35 grade complete all as specified and directed. | 50 | Sqm | 765 ₹38,250 | 772 ₹38,600 | 680 ₹34,000 | 730 ₹36,500 | 715 ₹35,750 | 700 ₹35,000 | 550 ₹27,500 Lowest | 750 ₹37,500 |
| 10.00Taking down unserviceable LT cable for repair/ replacement etc (from cable duct/underground trench / pole), stacking properly (cable, pipe and bricks) complete all as directed by the Engr-in-Charge of the following cross - sections :- (Note :- Necessary earth work to be measured and paid separately. | |||||||||||
Tender Value
₹29.5 L
EMD Value
₹59,000
Closing Date
14 Aug 2026, 6:00 pmClosed
GARRISON ENGINEER(FW) KOLKATA
D9, Commissariat Road, Hastings, Kol-22
REPAIR/MAINT OF AREA LIGHTING/ BUILDING SECURITY LIGHT/DECORATIVE LIGHT AND HIGH MAST LIGHT INSIDE VIJAY DURG UNDER GE(FW) KOLKATA
2026_MES_780491_1
8610/E8
Open Tender
Civil Works - Others
Item Rate
270 days
GARRISON ENGINEER(FW) KOLKATA
AS PER NIT
7 documents required · 7 mandatory
₹500
GARRISON ENGINEER(FW) KOLKATA
₹59,000
26 Sept 2026
24 Jul 2026
15 Aug 2026
24 Jul 2026
14 Aug 2026
7 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in trenches in any type of soil not exceeding 1.5 meter wide and not exceeding 1.5M in depth for laying of Cables, poles, stay and getting out of excavated material complete all as specified and directed by Engineer-in-Charge | 127 | CUM | - | - |
| 2 | Excavation in Trenches exc. for each additional 1.5m or part thereof in depth beyond the first 1.5 m for laying of steel tubular pole/Stays, etc., getting out including forming bottom surface to required level and gradient in Soft/ Loose Soil and getting out, complete all as specified and as directed. | 3 | CUM | - | - |
| 3 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25cm thick each, excavated soil in trenches after the cables have been laid and tested complete all as specified and directed by Engineer-in-Charge | 114.3 | CUM | - | - |
| 4 | Removal of surplus soil to a distance not exc. 50m and deposited where directed at a level not exc. 1.5 m above the starting point all as specified and as directed. | 12.7 | Cum | - | - |
| 5 | M&L for sand cushioning as per para 19.75 of SSR Part-I(2009) in trenches for underground cable protection and consolidated and compacted with clean dry sand complete all as specified and directed by engineer-in-charge.
NOTE: Punned thickness only shall be measured for payment. | 115 | CUM | - | - |
| 6 | M&L for Brick protection with subclass ‘B’ bricks old size, laid dry, flat over cable perpendicular across the cable in trenches complete all as specified. | 4,500 | Each | - | - |
| 7 | Laying Only Serviceable Bricks after cleaning by wire brush obtained from taking out unserviceable LT cable in connected items here-in-after. | 4,000 | Each | - | - |
| 8 | Taking out of interlocking paver block, any shape or size and Re-laying the same after removing all vegetation, algae, grass etc, laid to proper slope & gradient over sand cushioning complete all as specified and directed.
(NOTE: Sand, if required for correction of cushioning level will be measured and paid separately. Replacement of broken paver block shall be paid separately as "Supply only") | 50 | Sqm | - | - |
| 9 | Material and labour for machine pressed precast concrete interlocking paver block with grey cement and pigment of any shape and size as approved by GE conforming to IS 15658-2006 of 60 mm thickness, M-35 grade complete all as specified and directed. | 50 | Sqm | - | - |
| 10Taking down unserviceable LT cable for repair/ replacement etc (from cable duct/underground trench / pole), stacking properly (cable, pipe and bricks) complete all as directed by the Engr-in-Charge of the following cross - sections :- (Note :- Necessary earth work to be measured and paid separately. | |||||
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
BOQ_874284.xls
BOQ • 1.50 MB
pdfjoiner.pdf
Tender Documents • 1.82 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .