Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.4 CrAccepted-AOC NOT AVAILABLE | NA | NA | 121004 | ₹1.4 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹1.4 Cr+₹20,965.84 (0.15%)Rejected-AOC | ₹1.4 Cr+₹20,965.84 (0.15%) | 2 | Rejected-AOC L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-The contractor decided to withdraw their bid submission. before opening the bid |
| 4 | Not Admitted-Fee/PreQual/Technical 9 305 NACHIPUDUR KALAPPANAICKENPATTI SENDAMANGALAM NAMAKKAL 637 404 | NAMAKKAL | TAMIL NADU | 637404 | - | - | Not Admitted-Fee/PreQual/Technical Others-The contractor decided to withdraw their bid submission. before opening the bid |
| Sl No | Description | Qty | Unit | GNV Construction L2 | Ramamoorthy D L1 |
|---|---|---|---|---|---|
| 1.00Pallipatti to Narikkal Road (Muttukkal) Km 0/0 -2/795 H/o.Pallipatti (R-70) | |||||
| 2.00Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. | |||||
| 3.00 | Km 0/00-2/800 | 2,957.04 | Sqm | 8.5 ₹25,134.84 | 5 ₹14,785.2 Lowest |
| 4.00Picking BT Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4 | |||||
| 5.00 | Km 0/00-2/800 | 3,422.5 | Sqm | 25.45 ₹87,102.63 | 23.36 ₹79,949.6 Lowest |
| 6.00Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 | |||||
| 7.00 | Km 0/00-1/00 | 53.5 | Cum | 142 ₹7,597 | 140.45 ₹7,514.08 Lowest |
| 8.00 | Km 1/00-2/00 | 64.64 | Cum | 142 ₹9,178.88 | 140.45 ₹9,078.69 Lowest |
| 9.00 | Km 2/00-2/800 | 52.94 | Cum | 142 ₹7,517.48 | 140.45 ₹7,435.42 Lowest |
| 10.00Construction of embankment using tractor with grader with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Filling with Cut Earth) | |||||
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
26 Sept 2025, 3:00 pmClosed
The Project Director
DRDA Namakkal
Strengthening of 1 Road work at Senthamangalam Block of Namakkal District under MGSMT 2025-26 Phase-III Pkg.No.51/NKL/MGSMT Phase III 2025-26
2025_RDTN_605600_2
DIPR/5231/Tender/2025
Open Tender
Civil Works - Roads
Item Rate
180 days
Sendamangalam
Required Documents as per Schedule
4 documents required · 4 mandatory
₹0
₹1.5 L
DRDA Namakkal
9 Oct 2025
18 Sept 2025
26 Sept 2025
18 Sept 2025
26 Sept 2025
19 Sept 2025
19 Sept 2025
Amount
Pallipatti to Narikkal Road (Muttukkal) Km 0/0 -2/795 H/o.Pallipatti (R-70)
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Picking BT Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3
Construction of embankment using tractor with grader with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Filling with Cut Earth)
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher, vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Construction of Wearing coat ch 10 & 1117
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse an
Construction of Retaining Wall at
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. (Below Sill)
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. (Above Sill)
Centering for the sides and soffits CC items including all cost and conveyance and all labour charges etc., complete. (Below Sill)
Centering for the sides and soffits CC items including all cost and conveyance and all labour charges etc., complete. (Above Sill)
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
GNV Construction (BID ID -1468797)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .