Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹451.6 CrAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹462.2 Cr+₹10.7 Cr (2.36%)Admitted-Finance SECTOR 3 NEAR BJP HEAD OFFICE TRIKUTA NAGAR 180012 | JAMMU | JAMMU AND KASHMIR | 180012 | L2 | Admitted-Finance | |
| 3 | L3₹622.0 Cr+₹170.4 Cr (37.7%)Admitted-Finance GR HOUSE HIRAN MAGRI SECTOR 11 UDAIPUR 313001 RAJASTHAN | UDAIPUR | UDAIPUR | RAJASTHAN | 313001 | L3 | Admitted-Finance | |
| 4 | L4₹651 Cr+₹199.4 Cr (44.2%)Admitted-Finance 19 PARKDRIVE MALIBU TOWN SECTOR 47 SOHNA ROAD GURGAON HARYANA 122001 | GURGAON | GURGAON | HARYANA | 122001 | L4 | Admitted-Finance | |
| 5 | Rejected-Technical | - | Rejected-Technical Technically Non Responsive. |
| Sl No | Description | Qty | Unit | GR Infraprojects L3 | Gawar Construction Limited L4 | ABCI Infrastructures Pvt Ltd L1 | SRM CONTRACTORS LIMITED L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Construction to 2-Lane with Paved Shoulder of Tura Bypass starting from existing Km 57+500 of NH-127B (Design Chainage Km 0+000) and ending at existing Km 108+750 of NH-217 (Design Chainage Km 29+030) (Length =29.030 Km) on Hybrid Annuity Mode in the state of Meghalaya | 1 | Lump Sum | 6,21,97,00,000 ₹6,21,97,00,000 | 6,51,00,00,000 ₹6,51,00,00,000 | 4,51,55,00,000 ₹4,51,55,00,000 Lowest | 4,62,22,80,000 ₹4,62,22,80,000 |
Tender Value
₹520.4 Cr
EMD Value
₹5.2 Cr
Closing Date
24 Sept 2025, 3:00 pmClosed
Subodh Kumar
NHIDCL HQ New Delhi
Construction to 2-Lane with Paved Shoulder of Tura Bypass starting from existing Km 57.500 of NH-127B and ending at existing Km 108.750 of NH- 217 (Length-29.030 Km) on Hybrid Annuity Mode in the state of Meghalaya
2025_NHIDC_869769_1
NHIDCL/Meghalaya/NH-51 /Tura Bypass/2025
Open Tender
Civil Works
PPP-BoT-HAM
1095 days
Meghalaya
Please refer Tender documents.
5 documents required · 5 mandatory
₹70,800
MD NHIDCL
₹5.2 Cr
NHIDCL HQ New Delhi
16 Feb 2026
21 Jul 2025
25 Sept 2025
21 Jul 2025
24 Sept 2025
1 Sept 2025
21 Jul 2025 - 19 Aug 2025
19 Aug 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction to 2-Lane with Paved Shoulder of Tura Bypass starting from existing Km 57+500 of NH-127B (Design Chainage Km 0+000) and ending at existing Km 108+750 of NH-217 (Design Chainage Km 29+030) (Length =29.030 Km) on Hybrid Annuity Mode in the state of Meghalaya | - | Lump Sum | 2,80,96,22,642 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_914326.xls
BOQ • 0.31 MB
176225427.pdf
Tender Documents • 0.23 MB
176225429.html
Tender Documents • 0.07 MB
180393683.pdf
Tender Documents • 0.35 MB
DCA.pdf
Tender Documents • 1.79 MB
ExecutiveSummary.pdf
Tender Documents • 4.84 MB
HighwayDrawings.pdf
Tender Documents • 31.82 MB
RFP.pdf
Tender Documents • 1.42 MB
StructureDrawing.rar
Tender Documents • 28.38 MB
TechnicalSchedules.pdf
Tender Documents • 5.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .