Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.0 LAdmitted-Finance 189 ANAND VIHAR SAPROON DISTT SOLAN H P | SAPROON | SOLAN | HIMACHAL PRADESH | ₹13.0 L | L1 | Admitted-Finance |
| 2 | L2₹13.6 LAdmitted-Finance | ₹13.6 L | L2 | Admitted-Finance |
| 3 | L3₹14.6 LAdmitted-Finance | ₹14.6 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHASHANK KUMAR L1 | Nitin Bhasin L2 | Vikrant Sharma L3 |
|---|---|---|---|---|---|---|
| 1.00 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.Nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix) | 4.56 | cum | 800 ₹3,648 | 850 ₹3,876 | 90 ₹410.4 Lowest |
| 2.00 | Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 7.5 | sqm | 350 ₹2,625 | 400 ₹3,000 | 333 ₹2,497.5 Lowest |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand) : 6 graded stone aggregate 20 mm nominal size) | 3 | cum | 6,300 ₹18,900 | 6,500 ₹19,500 | 5,400 ₹16,200 Lowest |
| 4.00 | 40 mm thick rubbed stone flooring over 20 mm
(average) thick base of cement mortar 1:5 (1 cement : 5 coarse sand) with joints 3 mm thick, side buttered with cement mortar 1:2 (1 cement : 2 stone dust) admixed with pigment to match the shade of stone and pointing with same mortar. | 1,066.2 | sqm | 1,200 ₹12,79,440 Lowest | 1,250 ₹13,32,750 | 1,350 ₹14,39,370 |
Tender Value
₹9.7 L
EMD Value
₹24,200
Closing Date
1 Jun 2026, 5:00 pmClosed
Joint Commissioner
Joint Commissioner MC Solan
Repair and maintenance of Thodo ground Stadium.
2026_UDDHP_135376_1
7034 dt. 24.03.2026
Open Tender
Civil Works
Item Rate
30 days
MC Solan
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,000
MC Solan
₹24,200
3 Jun 2026
26 May 2026
2 Jun 2026
26 May 2026
1 Jun 2026
26 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.Nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix) | 4.56 | cum | - | - |
| 2 | Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 7.5 | sqm | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand) : 6 graded stone aggregate 20 mm nominal size) | 3 | cum | - | - |
| 4 | 40 mm thick rubbed stone flooring over 20 mm
(average) thick base of cement mortar 1:5 (1 cement : 5 coarse sand) with joints 3 mm thick, side buttered with cement mortar 1:2 (1 cement : 2 stone dust) admixed with pigment to match the shade of stone and pointing with same mortar. | 1,066.2 | sqm | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
BOQ_200541.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].