Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.8 CrAccepted-AOC BARNALI TOWER MIRZA KAMRUP ASSAM PIN 781125 | KAMRUP | ASSAM | 781125 | L1 | Accepted-AOC Work Order Issued | |
| 2 | L2₹17.8 Cr+₹7.3 L (0.41%)Rejected-AOC BHASKAR NAGAR BYE LANE NO 2 GUWAHATI 21 | SOUTH SALMARA MANCACHAR | ASSAM | 783127 | L2 | Rejected-AOC L2 |
Tender Value
₹17.8 Cr
EMD Value
₹35.5 L
Closing Date
31 Oct 2023, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE PWD(Bldg), Assam, Chandmari, Ghy-3
O/O The CE PWD(Bldg), Assam, Chandmari, Ghy-3
Construction of (G Plus 1) storied Duplex type Residential Quarter M-20, M-21 and M-22 at Minister Colony, Dispur, Ghy-06
2023_PWBNH_32973_1
CE/TB-IV/40/2023/02 Dated Guwahati 30th Sept 2023
Open Tender
Civil Works - Building
Item Rate
545 days
Dispur
Please refer Tender documents.
5 documents required · 5 mandatory
₹20,000
₹35.5 L
Yes
4 Jan 2024
11 Oct 2023
2 Nov 2023
11 Oct 2023
31 Oct 2023
11 Oct 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing, driving with hydraulic piling rigs with power units and
installing driven cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of shoe and the length of pile to be embedded in the pile cap etc. all complete. (Length of pile for payment shall be measured from top of shoe to the bottom of pile cap) :
400 mm dia piles | 2,691 | rm | - | - |
| 2 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.5.22A.6 Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1,70,994.04 | kg | - | - |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural
sources : 3 graded stone aggregate 20 mm nominal size de
rived from natural sources) | 717.9 | cum | - | - |
| 4 | Earth work in rough excavation, banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or
filling up ground depressions, lead upto 50 m and lift upto 1.5 m :
All kinds of soil | 1,098.26 | cum | - | - |
| 5 | Close timbering in trenches including strutting, shoring and packing
cavities (wherever required) complete. (Measurements to be taken of the face area timbered).
Depth not exceeding 1.5 m | 240 | sqm | - | - |
| 6 | Demolishing R.C.C. work manually/ by mechanical means including
stacking of steel bars and disposal of unserviceable material within
50 metres lead as per direction of Engineer - in- charge. | 65.78 | cum | - | - |
| 7 | Dry brick pitching half brick thick in drains including supply of bricks
and preparing the surface complete :
16.12.1 With common burnt clay F.P.S. (non modular) bricks of
class designation 7.5 | 3,060.87 | sqm | - | - |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 365.36 | cum | - | - |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 1,971.48 | sq m | - | - |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form forColumns, Pillars, Piers, Abutments, Posts and Struts | 1,371.2 | m2 | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_53038.xls
BOQ Document • 0.48 MB
131269429.pdf
Tender Document • 0.52 MB
131269430.pdf
Tender Document • 0.80 MB
SBD.pdf
Tender Document • 3.52 MB
FOB.pdf
Tender Document • 0.83 MB
131269432.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .