Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹135.6 CrAccepted-AOC AHEMDABAD B WING 15TH FLOOR PRIVILON BUILDING VIKRAM NAGAR AMBALI BOPAL ROAD BEHIND ISCONTAMPLE AHEMDABAD 380058 GUJRAT INDIA | AHMADABAD | GUJARAT | 380058 | L1 | Accepted-AOC L1 | |
| 2 | L2₹143.1 Cr+₹7.5 Cr (5.55%)Rejected-Finance 142 | L2 | Rejected-Finance L2 | |
| 3 | L3₹150.4 Cr+₹14.8 Cr (10.9%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹170.1 Cr+₹34.5 Cr (25.5%)Rejected-Finance 27 RAMANUJAM NAGAR NEYVELI VILLAGE TOWN NEYVELI CITY NEYVELI CUDDALORE TAMIL NADU 607802 INDIA | CUDDALORE | TAMIL NADU | 607802 | L4 | Rejected-Finance L4 | |
| 5 | L5₹176.0 Cr+₹40.4 Cr (29.8%)Rejected-Finance PLOT NO 11 SURVEY NO 09 THE WATER MARK BUILDING 9TH FLOOR WING B KONDAPUR HYDERABAD TELANGANA 50008 | 50008 | L5 | Rejected-Finance L5 |
Tender Value
₹188.5 Cr
EMD Value
₹3.8 Cr
Closing Date
13 Feb 2025, 2:00 pmClosed
SE KEN-BETWA LINK CANAL CONSTRUCTION CIRCLE BANDA
SUPERINTENDING ENGINEER KEN-BETWA LINK CANAL CONSTRUCTION CIRCLE BANDA IRRIGATION AND WATER RESOURCES DEPARTMENT UTTAR PRADESH
Restoration of Ken Main Canal from km. 0.000 to 31.600 in restoration of Ken Canal System under Ken-Betwa Link Project
2025_UPIDC_989952_1
03/SE/2024-25
Open Tender
Civil Works - Canal
Item Rate
1095 days
BANDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,354
₹3.8 Cr
ACEO Ken-Betwa Link Canal Construction Jhansi
25 Mar 2025
4 Jan 2025
13 Feb 2025
4 Jan 2025
13 Feb 2025
4 Jan 2025
15 Jan 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in cutting for making Canal section in all types of soil including lead upto 30.00 m, lift upto 1.50 m and disposal of surplus earth to spoil banks with manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc. | 2,77,781 | M3 | - | - |
| 2 | Earth Work in filling for making Canal Section from earth borrowed private Land with lead upto 1.00 km by Power Transport and lift up to 1.50 m with manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc. | 1,25,566 | M3 | - | - |
| 3 | Earth Work in filling for making Canal Section from earth borrowed private Land with lead upto 3.00 km by Power Transport and lift up to 1.50 m with manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc. | 2,92,988 | M3 | - | - |
| 4 | Earth Work in excavation of foundation in all types of soil including lead upto 30.00 m and lift up to 1.50 m including filling, watering, ramming, of excavated earth into the trenches or upto the space and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge upto a distance of 30.00 m from the foundation trenches including cost of all labour, T&P etc. | 66,510 | M3 | - | - |
| 5 | Earth Work in excavation of foundation in hard rock by blasting including cost of drilling and explosive, its removal and proper stacking beyond lead 1.00 km. | 21,118 | M3 | - | - |
| 6 | E/w in excavation of rock without blasting including all cost of labour T&P ete required to complete work. | 21,118 | M3 | - | - |
| 7 | Earth Work in filling for making Diversion/Approach Road/Ramp with carriage upto 1.00 km by power transport and lift up to 1.50 m manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc. | 9,548 | M3 | - | - |
| 8 | Centering & shuttering for C.C. work in different parts of structures with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T&P etc. | 45,878 | M2 | - | - |
| 9 | Centering & shuttering for R.C.C. slabs, lintels & simple beams work in different parts of structures with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T&P etc. | 1,23,749 | M2 | - | - |
| 10 | Centering & shuttering for special type of R.C.C. syphons and pump houses work in different parts of structures with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T&P etc. | 3,546 | M2 | - | - |
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BID-DOCUMENT-NIT03-LOT01.pdf
NIT • 2.37 MB
BOQ_1747729.xls
BOQ • 0.28 MB
160107386.pdf
Tender Documents • 1.45 MB
160107387.html
Tender Documents • 0.05 MB
163244327.pdf
Tender Documents • 0.11 MB
ProjectPurposeDrawingLOT-01.pdf
Tender Documents • 16.83 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .