Loading…
Loading…
Tender Value
₹31.0 Cr
EMD Value
₹41.0 L
Closing Date
20 Jun 2026, 10:30 am6d left
Executive Engineer
Executive Engineer HPPWD Division Hamirpur
Part ll Electrical Work SH- SITC of EI LAN system Access Control System CCTV Surveillance system fire Alarm System fire fighting and Sprinkler system power Backup and Elevator system therein
2026_PWD_136511_2
EE2490-2529DATED02-06-2026
Open Tender
Civil Works
270 days
Hamirpur
Please refer Tender documents.
14 documents required · 14 mandatory
₹40,000
Yes
EEHamirpur
₹41.0 L
13 Jun 2026
13 Jun 2026
20 Jun 2026
13 Jun 2026
20 Jun 2026
13 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Demolishing cement concrete nominal concrete 1:5:10 (One cement : five sand : ten graded stone aggregate) or richer mix (including equivalent design mix) manually/ by mechanical means including disposal and transportation of the unuseful material for disposing at dumping site( to be arranged by the contractor) including entire carriage of material with in all leads and lifts and as per the direction of Engineer-in-Charge including other incidentals. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | - | Per cubic metre | 1,000.75 | - | BI01010001010000000000000515BI0100001113 |
| 2 | Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains for all kinds of soil and ordinary rocks including dressing of sides and ramming of bottoms upto all lifts including getting out the excavated soil and disposal and transportation of surplus excavated soil / unuseful material for disposing at dumping site( to be arranged by the contractor) within all leads and lifts including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | - | Per Cubic Metre | 420.8 | - | BI01010001010000000000000515BI0100001114 |
| 3 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | - | Per Cubic Metre | 1,525.25 | - | BI01010001010000000000000515BI0100001115 |
| 4 | Centering and shuttering including strutting, propping etcetera and removal of form work in Foundations, footings, bases for columns including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | - | Per square metre | 267.2 | - | BI01010001010000000000000515BI0100001116 |
| 5 | Centering and shuttering including strutting, propping etcetera and removal of form work in Suspended floors, roofs, landings, balconies and access platform including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | - | Per square metre | 650.1 | - | BI01010001010000000000000515BI0100001117 |
| 6 | Centering and shuttering including strutting, propping etcetera and removal of form work in Lintels, beams, plinth beams, girders, bressumers and cantilevers including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 1 | Per square metre | 533.4 | ₹532.87 | BI01010001010000000000000515BI0100001118 |
| 7 | Centering and shuttering including strutting, propping etcetera and removal of form work in Stairs, (excluding landings) except spiral stair cases including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 1 | Per square metre | 532.9 | ₹532.37 | BI01010001010000000000000515BI0100001119 |
| 8 | Centering and shuttering including strutting, propping etcetera and removal of form work in Columns, piers, abutments, pillars, posts and struts including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 1 | Per square metre | 568.4 | ₹567.83 | BI01010001010000000000000515BI0100001120 |
| 9 | Centering and shuttering including strutting, propping etcetera and removal of form work in Circular Columns including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | - | Per square metre | 682.08 | - | BI01010001010000000000000515BI0100001121 |
| 10 | Centering and shuttering including strutting, propping etcetera and removal of form work in edges of slabs and breaks in floors & walls under 20 cm (twenty centimetre wide including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 1 | Per Running metre | 185 | ₹184.82 | BI01010001010000000000000515BI0100001122 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.15 MB
CBTsbdpdf.pdf
Tender Documents • 8.11 MB
BOQ_202165.xls
BOQ • 0.93 MB
Download all tender documents and submit your bid