Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.1 LAccepted-AOC RAILWAY COLONY PO DHANPURI DISTT SHAHDOL M P 484114 | DHANPURI | SHAHDOL | MADHYA PRADESH | 484114 | ₹44.1 L Quoted ₹37.4 L | L1 | Accepted-AOC After competent approval, LOA is being issued to techno-commercially eligible L1 bidder |
| 2 | L2₹45.7 LRejected-Finance BHAGWAN NIWAS WARD NO 30 DADARKHURD NEAR DADARNALA DISTT KORBA C G PIN 495682 | KORBA | CHHATTISGARH | 495682 | ₹45.7 L | L2 | Rejected-Finance Rejected being L2 bidder |
| Sl No | Description | Qty | Unit | m/s bhagwan saran and associates L2 | KEDAR SINGH L1 |
|---|---|---|---|---|---|
| 1.00Description of Work | |||||
| 1.01 | Dismantling, Transportation and Facing of MS pipeline of different sizes 8"/10" all complete including
(A) Shifting of dismantled pipes from site to loading point,
(B) Loading, unloading of pipes in departmental trucks,
(C) Transportation and placement of pipes at prescribed location along with,
(D) Proper facing of dismantled old 8”/10” dia M.S. pipes at both ends at Workshop or any other working sites as per the instruction of Work Incharge or Engineer Incharge
NOTE:
1) Vehicle will be provided by department.
2) All tools and tackles, welding cutter, cutting gases (DA cylinder, Oxygen Cylinder) to be provided by the Contractor. | 6,800 | mtr | 49 ₹3.3 L | 15 ₹1.0 L |
| 1.02 | Transportation, Laying, Welding and proper Matching of old or new 8"/10" dia M.S Pipes as per the instruction of Work incharge or Engineer Incharge which includes
(A) Transportation of pipes 8"/10" from the workshop or any working sites as per the instruction of work incharge or Engineer incharge.
(B) Laying and welding of pipes in proper position with earth work as per the ground profile at the working place.
(C) Welding of pipes at the safe location as per the instruction of work incharge or Engineer Incharge for laying at high wall and across the road.
(D) Laying, jointing and matching of welded pipes across the road and in high wall with the existing pipeline.
(E) Matching of new pipelines with the existing pipelines as per the instruction of work incharge or Engineer incharge.
NOTE: All tool and tackles , welding electrodes of required sizes, welding cutter, welding plant (minimum 20 KVA capacity DG set along with welding machine), cutting gases (DA Cylinder, Oxygen Cylinder), fuel and lubricating oil for welding plant etc. to be provided by the Contractor. | 17,000 | mtr | 249 ₹42.3 L | 214 ₹36.4 L |
| 1.03NOTE: (1) As per the requirement of mine site may be changed without any change in quantity and rate of job. (2) Actual measurement will be consider irrespective of ground profile. | |||||
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - |
Updated dates
Tender Value
₹1.2 Cr
EMD Value
₹1.5 L
Closing Date
24 Feb 2026, 5:00 pmClosed
STAFF OFFICER (EandM),SECL KUSMUNDA AREA
OFFICE OF THE STAFF OFFICER (EandM),SECL KUSMUNDA AREA P.O.KUSMUNDA COLLIERY 495454 DISTT. KORBA (CG) CONTACT No 9425533002
Dismantling, transporting, laying and jointing of 8/10 inch dia MS Pipe at RVR-West of Kusmunda Open Cast mines
2026_SECL_352317_1
SECL/GM/KSM /EnM/eTender/25-26/122
Open Tender
Miscellaneous Works
90 days
KUSMUNDA OCP
Please refer Tender documents.
5 documents required · 5 mandatory
₹1.5 L
7 Apr 2026
3 Feb 2026
25 Feb 2026
3 Feb 2026
24 Feb 2026
4 Feb 2026
3 Feb 2026 - 13 Feb 2026
Description of Work
Dismantling, Transportation and Facing of MS pipeline of different sizes 8"/10" all complete including (A) Shifting of dismantled pipes from site to loading point, (B) Loading, unloading of pipes in departmental trucks, (C) Transportation and placement of pipes at prescribed location along with, (D) Proper facing of dismantled old 8”/10” dia M.S. pipes at both ends at Workshop or any other working sites as per the instruction of Work Incharge or Engineer Incharge NOTE: 1) Vehicle will be provided by department. 2) All tools and tackles, welding cutter, cutting gases (DA cylinder, Oxygen Cylinder) to be provided by the Contractor.
Transportation, Laying, Welding and proper Matching of old or new 8"/10" dia M.S Pipes as per the instruction of Work incharge or Engineer Incharge which includes (A) Transportation of pipes 8"/10" from the workshop or any working sites as per the instruction of work incharge or Engineer incharge. (B) Laying and welding of pipes in proper position with earth work as per the ground profile at the working place. (C) Welding of pipes at the safe location as per the instruction of work incharge or Engineer Incharge for laying at high wall and across the road. (D) Laying, jointing and matching of welded pipes across the road and in high wall with the existing pipeline. (E) Matching of new pipelines with the existing pipelines as per the instruction of work incharge or Engineer incharge. NOTE: All tool and tackles , welding electrodes of required sizes, welding cutter, welding plant (minimum 20 KVA capacity DG set along with welding machine), cutting gases (DA Cylinder, Oxygen Cylinder), fuel and lubricating oil for welding plant etc. to be provided by the Contractor.
NOTE: (1) As per the requirement of mine site may be changed without any change in quantity and rate of job. (2) Actual measurement will be consider irrespective of ground profile.
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_365105.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.33 MB
Tendernotice_2.pdf
PDF • 0.59 MB
BOQ_365105.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid