Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹5.6 L+₹2,286.53 (0.41%)Accepted-AOC M S ASHAPURI INFRACON PVT LTD VILLAGE AND PO HURLA TEHSIL BHUNTER DISTT KULLU H P | L2 | Accepted-AOC L1 bidder | |
| 2 | L1₹5.5 LRejected-Finance GOVT CONT V P O LEDA TEHSIL BALH DISTT MANDI | MANDI | HIMACHAL PRADESH | 175001 | L1 | Rejected-Finance Absurd rate quoted by the bidder. | |
| 3 | L2₹5.6 L+₹2,286.53 (0.41%)Rejected-Finance | L2 | Rejected-Finance The bidder has given written undertaking to this office that she has no objection if the tender will be awarded to Sh. Vikas Sharma. | |
| 4 | L2₹5.6 L+₹2,286.53 (0.41%)Rejected-Finance | L2 | Rejected-Finance The bidder has given written undertaking to this office that he has no objection if the tender will be awarded to Sh. Vikas Sharma. | |
| 5 | L3₹5.6 L+₹2,360.28 (0.43%)Rejected-Finance | L3 | Rejected-Finance L3 Bidder |
Tender Value
₹7.9 L
EMD Value
₹15,900
Closing Date
15 Mar 2022, 9:00 amClosed
Executive Engineer
Shimla Rural Division HPPWD Dhami
SH- Cutting in KM 0/525 to 1/00.
2022_PWD_57709_5
PW-SRDD-CB-CTR-2021-22- 21516-564 dated 08-03-2022
Open Tender
Civil Works - Roads
Item Rate
60 days
Dhami
as per tender documents
12 documents required · 12 mandatory
₹500
₹15,900
6 Aug 2022
8 Mar 2022
15 Mar 2022
8 Mar 2022
15 Mar 2022
8 Mar 2022
Amount
Excavation in earthwork in hilly area all hights and depth, in all kind of soil including saturated soil comprising of mixed soil , ordinaryrock and hard rock with rock breaker including breaking rock. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side,water pollution , etc. and to protect stabality of hill side . Rock shall be excavated with chiseling and wedging out rock (where blasting is prohibited). All earth work in cutting / excavation , including rock excavation shall be carried out true to lines grades , side slopes, width, chamber, super elevation and level as shown on the drawings or as directed by the Engineer-in - Charges, in conformity with the requirement of techanical specification for Rural Road, August 2004 and clause 16.2 of General Conditions for Contract to achieve designed formation wodth including hauling and stacking of material useful for construction at suitable sites and safe disposal of unsuitable cut matereial inspecified manner,tremming, filling of unevenness, blindage and finishing of the road to specified dimensions or as dirrected by the Engineer-in -Charge for smooth riding. The recovery of useful stone that is 110.64 cubic meter in all cases falling which recovery @ Rupees 300/- only (Rupees three hundereed only) per cubic metre shall be effected on prorata basis. Any loss to the public and private property during the course of execution shall be the absolute responsibility of the contractor, which shall have to be duly compensated by him in all cases.
vikas sharma
Dushyant Sharma
Champa sharma
BESAR DASS
Chander Shekhar Sharma
Vidya Dutt Sharma
NOKH RAM SHARMA
JAI PRAKASH SHARMA
Pankaj Sharma
MOTI LAL SHARMA
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .