Loading…
Loading…
| # | Company | Amount |
|---|---|---|
| 1 | ₹4.0 Cr |
Tender Value
₹5.0 Cr
EMD Value
₹10.1 L
Closing Date
27 May 2026, 4:00 pmClosed
PRABHAT KUMAR
Executive Engineer
P.H Division Gopalganj Near Minz Stadium Pani Tanki
DAYASHANKAR PRASAD
CHIEF ENGINEER (DESIGN)
Design, Construction, Supply, Testing, commissioning of Water Supply Schemes with Electric Driven Pumps for Non Quality Affected Areas of Block- Fulawariya in 20 Habitation of Gopalganj District of Bihar on turn-key basis with Three months Trial Run Period Under P.H. Division, Gopalganj.
131732
NIT- 15R3/2026-27/PRD-LoT/Gop/Fulawariya/GR_01
Open Tender
CIVIL
Gopalganj
• Bid Validity
Bids shall remain valid for a period not less than 180 days afte r the deadline date. A Bid valid for a shorter period shall be re jected by the Employer as non-responsive
• Bid Security-Unconditional bank guarantee from any scheduled Indian ban k issued within the state in the format given (If issued from an y bank outside state will be converted to any bank within the s tate before executing the agreement, duly pledged in favour of the Executive Engineer, PHED Division, Gopalganj
• Legal Status of Bidder
• Place of Registration
• Principal place of Business
• Power of attorney of signatory Bid
• Total value of civil engineering construction work performed in last five years
• Work Experience of Similar nature-Satisfactorily completed as a prime contractor (or as a nomina ted sub contractor, where the sub contract involved execution of all main items of work described in the bid document, prov ided further that all other qualification criterion are satisfied) at least one similar work of value not less than the amount ind icated in the appendix (Not less than 10% (Ten percent) estim ated value of contract). Or Satisfactorily completed water supply scheme (Piped water su pply or lift irrigation or water supply in building) at least one work of value not less than 10% (ten percent) of the estimated cost of the works for which bid has been invited.
• Bidding Capacity:-Should be more than Available Bid capacity = (A x N x 3 - B) = Rs. _____, Where A= Maximum Value of work executed in any one year during last 5 yrs. , N = Number of years prescrib ed for completion of the works for which bids are invited. (Fo r contracts involving operation and maintenance; the period of completion shall be the sum of entire DB duration and half th e duration of the O&M period), B= Value (updated to the pric e level of the year indicated in Appendix) of existing commit ments and on-going works to be completed during the next 12 months
• Existing commitments and ongoing works
• Work for which Bid already submitted
• Availability of key items of Contractor's Equipment-Type of Equipment/Maximum age No. Required Nos.M ax. Age Concrete Mixer 2 5 Vibrator 4 5 Rotary Drilling / Reverse Rotary / DTH Rig Machine 1 5 Compressor 1 5 Truck/Tractor with trailer 1 5 Hydraulic Excavator 1 5
• Key Personnel
• Evidence of access to or availability of credit facilities (10% of estimated cost), certified by bankers (Not more than 3 mont hs old). (Rs in Lakhs).
• Justifying their capability of execution and completion of the work as per technical specifications within the stipulated perio d of completion as per milestones. (Attached or not
• Information regarding any litigation, current or during the last five years, in which the Bidder is involved, the parties concer ned, and disputed amount. (Attached or not)
• affadavit-Regarding statements made in the required attachments are tru e and correct.
• Undertaking-Able to invest a minimum of cost upto 25% of contract value of work. During implementation of contract
• Valid character certificate
• PAN No
• GST
• Time of Completion 6 month
CIVIL
ITEM RATE
L1
1
25 documents required · 25 mandatory
₹10,000
Processing Fee: 5900
₹10.1 L
P.H Division Gopalganj Near Minz Stadium Pani tanki
14 Sept 2026
18 May 2026
27 May 2026
18 May 2026
27 May 2026
18 May 2026
20 May 2026
TECHNICAL BID SHEET OF GROUP No.- 01, TENDER NIT No– 15R3/2026-27/PRD-LoT/Gop
Name of Work Design, Construction, Supply, Testing, commissioning of Water Supply Schemes with Electric Driven Pumps for Non Quality Affected Areas of Block- Fulawariya in 20 Habitation of Gopalganj District of Bihar on turn-key basis with Three months Trial Run Period Under P.H. Division, Gopalganj. Cost of Work as per BOQ(Rs in Lakhs) 504.14 Time of Completion in months 6 ALL COLOURED CELL TO BE FILLED ACCORDINGLY
Sanctioned Amount As per Technical Approval Date of Tender 08.05.2026
Sl No. Items Requirement Requirement Cl. No.
Name of the Contractor
Address of the Contractor
1 Bid Validity Bids shall remain valid for a period not less than 180days after the deadline date. A Bid valid for a shorter period shall be rejected by the Employer as non-responsive 180 Days 15.1 Page/17 Bid validity periods In days
2 Bid Security a)Unconditional bank gurntee from any scheduled Indian bank issued within the state in the format given (If issued from any bank outside state will be converted to any bank within the state before executing the agreement, duly pledged in favour of the Executive Engineer, PHED Division, Gopalganj 16.1 Page-17 Amount To be entered (Rs in Lakhs)
Bid Security Amount - (Rs. In Lakhs) Bid Security Amount - Rs.
3 (i) Legal Status of Bidder. 4.3(a) Page-12
(ii) Place of Registration.
(iii) Principal place of Business
(iv) Power of attorney of signatory Bid Attached or Not 4.2(iv) Page-11
4 Total value of civil engineering construction work performed in last five years. Achieved in any one year during the last five years, a minimum annual financial turnover (in all classes of civil engineering construction works only) volume of construction work of at least the amount equal to the 50% (fifty percent) of the estimated cost of the works for which bid has been invited. The turnover will be indexed at the rate of 8% for a year. The certificates attached in support of turnover attached shall have valid Unique Document Identification Number (UDIN). 4.5A (a) Page-12
2019-20 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.47
2020-21 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.36
2021-22 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.26
2022-23 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.17
2023-24 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.08
5A Work Experience of Similar nature Satisfactorily completed as a prime contractor (or as a nominated sub contractor, where the sub contract involved the executiion of all main items of the work described in the bid document, provided further that all other qualifications criteria are satisdied) at least one similar work of value not less than the amount specified in the Appendix (not less than 10% (Ten Percent) of the estimated value of Contract. Or Satisfactory completed water supply schemes (Piped water supply schemes) at least one work of value not less than 10% (Ten percent) 0f the estimated cost of works for which the bid has beem invited. 4.5A (b) Page -12-13 Amount To be entered (Rs in Lakhs)
7 Bidding Capacity: More than the total Bid value of present work = A*N*3-B=Rs. ____.Where A = Maxm. Value of work executed in any one yr during last 5 yrs. N= Nos of years for completion of works. B=Value of existing commitments & ongoing works to be completed in period. Necessity of bid capacity for bidders who meet the minimum qualifying criteria is not mandatory for ward wise schemes up to Rs. 2.00 crore in Har Ghar Nal Ka Jal Nishchay Yojna. Clause- 4.7(a) above is not applicable for this category of schemes 4.7 Page- 13
6 Bidding Capacity: Should be more than Available Bid capacity = (A x N x 3 - B)= Rs. _____, Where A= Maximum Value of work executed in any one year during last 5 yrs. , N = Number of years prescribed for completion of the works for which bids are invited. (For contracts involving operation and maintenance; the period of completion shall be the sum of entire DB duration and half the duration of the O&M period), B= Value (updated to the price level of the year indicated in Appendix) of existing commitments and on-going works to be completed during the next 12 months 4.7 Page-20 Amount To be entered (Rs in Lakhs)
7 (a) Existing commitments and ongoing works Page - 20 Amount To be entered (Rs in Lakhs)
(b) Work for which Bid already submitted Page - 20 Amount To be entered (Rs in Lakhs)
8 Availability of key items of Contractor's Equipment Type of Equipment/Maximum age No. Required Nos. Max. Age 4.5(B) (b) Page-26 Annexure-I Nos./ Max. Age
Concrete Mixer 2 5
Rotary Drilling / Reverse Rotary / DTH Rig Machine 1 5
Truck/Tractor with trailer 1 5
Hydraulic Excavator 1 5
9 Key Personnel 5-30 Crores 4.5(B) (b) Page-34 Annexure-II Name of the Personnel and Experience in years
Project Manager B.E. Civil + 10Years Exp. (5 years as Manager in PHED works) or retired E.E. & above of PHED 1
Site Engineer B.E. Civil + 07Years Exp. (3 years as Manager in PHED works) or retired A.E. & above of PHED 1
Site Supervisor B.E. Mech./Civil + 05 Years Exp. Or Dip. Mech./Civil + 07 years Exp. Or or retired J.E. & above of PHED 5
Burveyor .B E. Civil + 03 Years Exp. orDip. Civil + 05 years Exp. 1
10 Evidence of accesses to Financial Resources Evidence of access to or availability of credit facilities (10% of estimated cost), certified by bankers (Not more than 3 months old). (Rs in Lakhs). Page 15 4.3 (g) Amount To be entered (Rs in Lakhs)
11 Proposed methodology and programme of construction. Justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion as per milestones. (Attached or not) Page 15 4.3 (l)
12 Litigation History Information regarding any litigation, current or during the last five years, in which the Bidder is involved, the parties concerned, and disputed amount. (Attached or not) Page 15 4.3 (j)
13 Affidavit Regarding statements made in the required attachments are true and correct. Page 23 12.1 (iv)
14 Undertaking Able to invest a minimum of cost upto 25% of contract value of work. During implementation of contract. 25 % of B.O.Q.Amount Page 12 4.3 (h)
17 ChGopalganjcter Certificate
18 Time of Completion 6 Months To be entered in months
Executive Engineer
P.H. Division Gopalganj
QUALIFICATION INFORMATION
The information to be filled in by the Bidder in the following pages will be used for purposes of post qualification as provided for in Clause 4 of the Instructions to Bidders. This information will not be incorporated in the Contract.
NAME OF THE CONTRACTOR
1 For Individual Bidders
1.1 Constitution or legal status of Bidder (Attach copy)
Place of registration :
Principal place of business :
Power of attorney of signatory of Bid (Attach)
1.2 Total value of Civil Engineering construction work performed in the last five years** (in Rs. Million)
1.3.1 Work performed as prime contractor, work performed in the past as a nominated sub- contractor will also be considered provided the sub-contract involved execution of all main items of work described in the bid document, provided further that all oth
NAME OF THE CONTRACTOR
Project Name Name of the Employer* Description of work Contract No. Value of Contract (Rs. In Crore) Date of issue of work order Stipulated period of completion Actual date of completion* Remarks explaining reasons for delay & work completed)
* Attach certificate(s) from the Engineer(s)-in-Charge
** Immediately preceding the financial year in which bids are received.
Attach certificate from Chartered Accountant.
1.3.2 Quantities of work executed as prime contractor, work performed in the past as a nominated sub-contractor will also be considered provided the sub-contract involved execution of all main items of work described in the bid document, provided further that all other qualification criteria are satisfied (in the same name and style) in the last five years.
NAME OF THE CONTRACTOR
Year Name of the work Name of the Employer* Quantity of work performed
Remarks* (indicate contract Ref)
1.4 Information on Bid Capacity (works for which bids have been submitted and works which are yet to be completed) as on the date of this bid.
(A) Existing commitments and on-going works:
NAME OF THE CONTRACTOR
Description of works Place & State Contract No. Name & Address of Employer Value of Contract (Rs Cr) Stipulated Period of Completion Value of works* remaining to be completed (Rs Cr) Anticipated date of completion
* Attach certificate(s) from the Engineer(s)-in-Charge
The item of work for which data is requested should tally with that specified in ITB clause 4.5A ©
** Immediately preceding the financial year in which bids are received.
# Delete, if prequalification has been carried out.
(B) Works for which bids already submitted :
Description of works Place & State Name & Address of Employer Estimated value of works (Rs Cr) Stipulated period of completion Date when decision is expected Remarks, if any
1.5 Availability of key items of Contractor’s Equipment essential for carrying out the Works [Ref. Clause 4.5(B)(a)]. The Bidder should list all the information requested below. Refer also to Sub Clause 4.3 (d) of the Instruction to Bidders.
NAME OF THE CONTRACTOR
Description of works Requirement Availability proposals Remarks (from whom to be purchased)
No. Capacity Owned/Leased to be procured Nos./Capacity Age/ Condition
1.6 Qualifications and experience of key personnel required for administration and execution of the Contract [Ref. Clause 4.5(B)(b)]. Attach biographical data. Refer also to Sub Clause 4.3 (e) of instructions to Bidders and Sub Clause 9.1 of the Condition
NAME OF THE CONTRACTOR
Position Name Qualification Year of Experience (General) Years of experience in the proposed position
1.7 Proposed sub-contracts and firms involved. [Refer ITB Clause 4.3(k)]
NAME OF THE CONTRACTOR
Sanction of the works Value of Sub-contract Sub-contractor (Name & Address) Experience in similar work
Attach copies of certificates on possession of valid license for executing water supply/ sanitary work/ building electrification works [Reference Clause 4.5(d) & Clause 4.5(e)]
*1.8 Financial reports for the last five years: balance sheets, profit and loss statements, auditors' reports (in case of companies/corporation), etc. List them below and attach copies.
1.9 Evidence of access to financial resources to meet the qualification requirements: cash in hand, lines of credit, etc. List them below and attach copies of support documents.
1.10 Name, address and telephone, telex and fax numbers of the Bidders' bankers who may provide references if contacted by the Employer.
1.11Information on litigation history in which the Bidder is involved.
NAME OF THE CONTRACTOR
Other Party(ies) Employer Cause of Dispute Amount involved Remarks showing Present Status
1.12 Statement of compliance under the requirements of Sub Clause 3.2 of the instructions to Bidders. (Name of Consultant engaged for project preparation is ** ........................ …………….............................)
Proposed work method and schedule. The Bidder should attach descriptions, drawings and charts as necessary to comply with the requirements of the Bidding documents. [Refer ITB Clause 4.1 & 4.3(1)]
1.15 Quality Assurance Programme
2 Additional Requirements
2.1 Bidders should provide any additional information required to fulfill the requirements of Clause 4 of the Instructions to the Bidders, if applicable.
(ii) Undertaking
*** (iii) Update of original prequalification application
*** (iv) Copy of original prequalification application
*** (v) Copy of prequalification letter
* Delete, if prequalification has been carried out.
** Fill the Name of Consultant.
*** Delete, if prequalification has not been carried out.
Check List for Submission Of Tender
Evaluation will be done as per the information provided in the document attached with tender. Bidder may disqualified, if documents are not attached properly.
Name of the Bidder
Sl. No. Checklist Items (Attach Documents in Edit Attachment Folder) Document attached
1 BIDSECURITY PHOTO COPY
2 LAST 5 YEARS ANNUAL TURN OVER
3 EXPERIENCE Of SIMILAR NATURE Of W0RKS
4 QUANTITY OF WORK OF SIMILAR NATURE EXECUTED DURING LAST 5 YEARS)
5 BALANCE VALUE OF ON GOING WORKS
6 EXISTING COMMITMENTS
7 BANKER'S CERTIFICATE FOR ACCESS OF FINACIAL RESOURCES
10 LITIGATION HISTORY
11 PLANT and MACHINARIES
12 KEY PERSONNEL
13 Registration
14 Power of Attoney
15 Legal Status Of Bidder
16 PROGRAMME Of CONSTRUCTION
17 NOC FOR DEBAR
18 LABOUR LICENCE
20 GST CERTIFICATE
21 Character Certificate
22 Any other Documens required as per NIT/ Standard Bidding Documents Required
IF YOU HAVE NOT BEEN DEBARED WRITE "NOT APPLICABLE" IN YOUR LETTER HEAD SCAN AND UPLOAD IN THE IN NOC FOR DEBAR LINK
Note:-Attachment should be self attested and should be attached as per above instruction, otherwise it may be rejected.
I, the undersigned, do hereby certify that all the statements made in the required attachments are true and correct.
Signature & Seal of the Bidder
SHORT TENDER NIT No – 15R3/2026-27/PRD-LoT/Gop
BoQ for Design, Construction, Supply, Testing, commissioning of Water Supply Schemes with Electric Driven Pumps for Non Quality Affected Areas of Block- Fulawariya in 20 Habitation of Gopalganj District of Bihar on turn-key basis with Three months Trial Run Period Under P.H. Division, Gopalganj.
Date of Tender :- 08.05.2025
Estimated Cost:- Rs.50,414,939.51
Earnest Money :- Rs.1,009,000.00
Time of Completion :- 6 MONTHS
Cost of BSEDC Bid processing fee:- As Per Online
Cost of BOQ :- Rs 10,000.00 (to be paid online)
Name and Address of the Bidder
Sl. No Particulars Qty. Unit Rate Amount in Rs
ITEM WISE COST BREAKUP
SECTION – A : EXECUTION PART
1 Surveying and levelling using Total Station/DGPS or auto level instruments of the project area including transfer of relevant bench mark to establish the levels of strategic points at the selected position of the T/Well, pumping station & attach the surveying data sheet with design & drawing of pipe line, map of location of HYDT & Steel/RCC structure etc. all complete work. 34.129 P/KM Rs.0.00
2 Construction of HYTW etc. all complete and as per direction of E/I.
Size- 150mmX 100mmX 125M Deep 20 Each Rs.0.00
3 Constructing masonry Chamber 100x100x75 cm inside, in brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for Tube Well, and RCC top slab 1:1.5:3 mix (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size ) , necessary excavation, foundation concrete 1:2:4(1 cement : 2 fine sand : 4 graded stone aggregate 20 mm nominal size) and inside plastering with cement mortar 1:3 (1 cement : 3coarse sand) 12 mm thick with 5% cico fnished with a floating coat of neat cement, out side plastering with cement mortar 1:4 (1 cement : 4coarse sand) 12 mm thick complete as per standard specifications & direction of E/I. 20 Each Rs.0.00
4 Supplying all materials and Laying of distribution network including placing of 10000 litres PVC tank at each scheme as per the directions of Engineer in Charge including Earthwork in 30m wide and 1.1m deep trenches, Including crossing of ditches Road cutting and restoration and backfilling the trenches after laying of line, providing and laying HDPE pipe of 75 mm dia and 63 mm dia of (PE-PN10 rating) as per IS 4984/1995 and 50 mm and 40mm dia pipe (PE100-PN8 rating) as required including supplying all jointing materials etc. including all taxes, duties etc.-and incidental charges providing necessary thrust block where as required, construction of brick masonry chamber (60cm x 60cm x 75cm) for valves with cost of certification mark and fixing in trenches including the cost of fullway valves, earth work in back filling the trenches after laying of different types and sizes of pipe, fittings and valves with earth removed during excavation within initial lead and lift etc. including providing night guard, barrier and red light to safe guard against accident, testing of laid pipes etc. all complete job as per specification and direction of E/I.
G.I PIPE INCLUDING G.I FITTING
80 mm dia nominal bore from PVC tank to Distribution main 240 PM Rs.0.00
65 mm dia nominal bore used for washout and overflow from PVC Tank 80 PM Rs.0.00
50mm dia Pipe from T/well to PVC Tank 300 PM Rs.0.00
HDPE PIPE AND FITTING
110mm PE 100-PN10 0 PM Rs.0.00
90mm PE 100-PN10 1987 PM Rs.0.00
75mm PE 100-PN10 6167 PM Rs.0.00
63mm PE 100-PN10 8180 PM Rs.0.00
50mm PE 100-PN8 7530 PM Rs.0.00
40mm PE 100-PN8 10265 PM Rs.0.00
5 Supplying and installation, commissioning and testing of 2 HP/3 HP Single phase Submersible pump and motor of KSB/Kirloskar or equivalent make having discharge of 2.5 to 3.35 lps against a total head of 35 m including doing power and light wiring SUPPLYING & FITTING service wire extension of L T line (0.3Km) & 65 mm dia G I medium class column pipe, 65mm dia Riser pipe (L), 65 mm dia N/R Valve, 65 mm dia flange and Supplying and installation of 7.5 KVA Stabilizer, taking single phase connection, Meter Board, Starter including power wiring all complete job etc all complete as per direction of E/I.
3Hp submersible pump 20 Each Rs.0.00
6 Providing house connection with Retrofitting for each house hold including supplying all materials, labours, tools and making ferrule connection with 20 mm dia MDPE and 15mm CPVC Pipes with all fittings etc all complete 2450 Each Rs.0.00
7 Providing and erecting 8M high staging with ladder of ISA65x65x6 and 16mm dia MS bar as trade @ 400mm c/c and GI enclosure to house electric switch panel & treatment unit (where required) of suitably designed MS section of angle, channel, etc. as per drawing attached. /Construction of RCC Staging 4.0M x 3.0M x 8.0M High for 10000 liter water tank. 20 Each Rs.0.00
8 Installation of Electronically Regulated Doser type chlorinator using Sodium Hypo Chlorite (Hypo NaOCl) 20 Each Rs.0.00
9 Cost of Applying for Taking Electricity connection including installation of Electric Meter on the scheme. 20 Nos. Rs.0.00
10 For 2 PPM & 30% Chlorine solution of {Total population served *81*2/1000000)*(100/30)* 3months*30* No.of schemes. 119.07 P/Ltr. Rs.0.00
11 Cost for Electricity charges for a period of 3 months (Trial Run Period ) (As per sub Estimate no.-8) @ Rs.2.45/unit 20 Nos. Rs.0.00
Total:- Rs.0.00
Bidders are required make the entries in the coloured cells only.
Any existing work such as t/w / pipe line or others is in workable condition then that component will be used and new construction (duplicacy of any component) will not be allowed for that work.
GOVERNMENT OF BIHAR
Public Health Engineering Department
ABSTRACT OF COST
S.No. Description Quantity Unit Rate Total Amount
1 CONSTRUCTION OF TUBE WELL OF DIFFERENT SIZE 150MM X 100MM DIA & 125M deep T/W etc. all complete and as per direction of E/I. (As per sub est 1) 20 Nos. Rs.256,875.00 Rs.5,137,500.00
2 Constructing masonry Chamber 100x100x75 cm inside, in brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for Tube Well, and RCC top slab 1:1.5:3 mix (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size ) , necessary excavation, foundation concrete 1:2:4(1 cement : 2 fine sand : 4 graded stone aggregate 20 mm nominal size) and inside plastering with cement mortar 1:3 (1 cement : 3coarse sand) 12 mm thick with 5% cico fnished with a floating coat of neat cement, out side plastering with cement mortar 1:4 (1 cement : 4coarse sand) 12 mm thick complete as per standard specifications & direction of E/I. (As per sub Estimate no.- 2) 20 Nos. Rs.16,256.00 Rs.325,120.00
3 Providing and Laying Distrbution network of High Density Polyethyene pipe (HDPE pipe) including 10000 liter PVC tank installed at 8M high MS staging etc all complete as per direction of E/I. (As per sub Estimate no.- 3) 1 Job Rs.19,729,146.86 Rs.19,729,146.86
4 Supply Installation, commissioning and testing of single phase submersible pump set of 3 H.P. submersible pump set having discharging capacity 3.35 lps at a total head of 35 meter(approx) of KSB/Kirloskar or equivalent make with all accessories & fittings etc including loading unloading and transportation of the pump set to the work site with all required labour, materials, tools and tackles installation, testing & commissioning as per standards specifications and direction of E/I. (As per sub Estimate no.-4) 20 Nos. Rs.105,000.00 Rs.2,100,000.00
5 Providing house connection for each house hold including supplying all materials, labours, tools and making ferrule connection with 20 mm dia with all fittings etc all complete. (As per sub Estimate no.-5) 2450 Nos. Rs.2,490.00 Rs.6,100,500.00
6 Providing and erecting 8M high staging with ladder of ISA65x65x6 and 16mm dia MS bar as trade @ 400mm c/c and GI enclosure to house electric switch panel & treatment unit (where required) of suitably designed MS section of angle, channel, etc. as per drawing attached. (As per sub Estimate no.- 6) 20 Nos. Rs.685,200.00 Rs.13,704,000.00
7 Installation of Electronically Regulated Doser type chlorinator using Sodium Hypo Chlorite (Hypo NaOCl) (As per sub Estimate no.- 8) 20 Nos. Rs.23,515.00 Rs.470,300.00
8 Surveying and levelling using Total station/DGPS or Auto level instruments of the project area including transfer of relevent bench mark to establish the levels of strategic points at the selected position of the T/Well, pumping station & attach the surveying data sheet with design & drawing of pipe line , map of location of HYDT & Steel structure etc. all complete work. 34.12 KM Rs.5,000.00 Rs.170,600.00 10860.00
SUB TOTAL AMOUNT Rs.47,737,166.86
Multiplying by Factor 1.0536 for Taking GST@18% in Place of existing 12% GST Rs.50,295,879.01
SUB TOTAL - PART-A Rs.50,295,879.01
9 Cost of Applying for Taking Electricity connection including installation of Electric Meter on the scheme. 20 Nos. 200 Rs.4,000.00
10 For 2 PPM & 30% Chlorine solution of { Total population served *81*2/1000000)*(100/30)*3months*30* No.of schemes. 119.07 P/Ltr. 150 Rs.17,860.50
11 Cost for Electricity charges for a period of 3 months ( Trial Run Period ) (As per sub Estimate no.-8) @ Rs.2.45/unit 20 Nos. 4860 Rs.97,200.00
SUB TOTAL - PART-B Rs.119,060.50
Grand total ( Part A + Part B) Rs.50,414,939.51
Total Rs.50,414,939.51
Executive Engineer
P.H.Division, Gopalganj
Sl No. PRDTransferID Division Block Panchyat Ward No Details Distrubution System
छुटे हुए टोला का नाम छुटे हुए हाउस कनेक्शन की संख्या 90mm 75mm 63mm 50mm 40mm Total length
1 2385 GOPALGANJ PHULWARIA PAKAULI BADO 2 Paikoli Bado 105 Estimated cost (In Lakh) 80 330 365 370 520 1665
2 28892 GOPALGANJ MANJHA GOSAI 5 Manjha 105 Estimated cost (In Lakh) 105 340 450 460 530 1885
3 28905 GOPALGANJ MANJHA GOSAI 4 Purab Tola 150 Estimated cost (In Lakh) 110 310 420 400 495 1735
4 53233 GOPALGANJ KOILA DEVA 12 Madharwali 100 Estimated cost (In Lakh) 90 300 415 365 490 1660
5 53218 GOPALGANJ KOILA DEVA 6 Siyarah 100 Estimated cost (In Lakh) 100 250 430 380 530 1690
6 53401 GOPALGANJ KOILA DEVA 11 Koyela Deva 200 Estimated cost (In Lakh) 105 310 390 385 495 1685
7 53222 GOPALGANJ KOILA DEVA 5 Pakariya Dalit Basti 120 Estimated cost (In Lakh) 93 315 410 390 530 1738
8 43273 GOPALGANJ KAMLAKANT KARARIYA 5 Harijan Tola 110 Estimated cost (In Lakh) 100 330 395 365 515 1705
9 43295 GOPALGANJ KAMLAKANT KARARIYA 4 Chaudhari Tola 110 Estimated cost (In Lakh) 95 330 400 320 510 1655
10 14423 GOPALGANJ GIDHA 3 Rakaba 120 Estimated cost (In Lakh) 80 330 365 370 520 1665
11 27942 GOPALGANJ GIDHA 13 Bhagwanpur 150 Estimated cost (In Lakh) 95 295 380 355 535 1660
12 52825 GOPALGANJ GANESH DUMMAR 8 Dudhwaliya 100 Estimated cost (In Lakh) 97 316 420 380 495 1708
13 286 GOPALGANJ FULWARIYA 2 Kalyani 100 Estimated cost (In Lakh) 130 310 420 400 550 1810
14 293 GOPALGANJ FULWARIYA 4 Sahab Chapra 110 Estimated cost (In Lakh) 90 300 415 365 490 1660
15 278 GOPALGANJ FULWARIYA 3 Bhagwat Parsa Patti 130 Estimated cost (In Lakh) 97 316 420 380 495 1708
16 298 GOPALGANJ FULWARIYA 5 Madipur Dalit Tola 110 Estimated cost (In Lakh) 130 310 420 400 550 1810
17 3756 GOPALGANJ CHURAMAN CHAK 14 Harijan Tola 120 Estimated cost (In Lakh) 90 300 415 365 490 1660
18 14052 GOPALGANJ BAIRAGI TOLA 8 Bairagi Tola 120 Estimated cost (In Lakh) 100 250 430 380 530 1690
19 14418 GOPALGANJ BAIRAGI TOLA 13 Brichha Bathua 180 Estimated cost (In Lakh) 90 295 415 340 515 1655
20 13394 GOPALGANJ BAIRAGI TOLA 2 Lakshan Tola khap 110 Estimated cost (In Lakh) 110 330 405 360 480 1685
J.E A.E Executive Engineer
P.H. Division Gopalganj
SHORT TENDER NIT No – 15R3/2026-27/PRD-LoT/Gop
BoQ for Design, Construction, Supply, Testing, commissioning of Water Supply Schemes with Electric Driven Pumps for Non Quality Affected Areas of Block- Fulawariya in 20 Habitation of Gopalganj District of Bihar on turn-key basis with Three months Trial Run Period Under P.H. Division, Gopalganj.
Date of Tender :- 08.05.2025
Estimated Cost:- Rs.50,414,939.51
Earnest Money :- Rs.1,009,000.00
Time of Completion :- 6 MONTHS
Cost of BSEDC Bid processing fee:- As Per Online
Cost of BOQ :- Rs 10,000.00 (to be paid online)
Name and Address of the Bidder
Sl. No Particulars Qty. Unit Rate Amount in Rs
ITEM WISE COST BREAKUP
SECTION – A : EXECUTION PART
1 Surveying and levelling using Total Station/DGPS or auto level instruments of the project area including transfer of relevant bench mark to establish the levels of strategic points at the selected position of the T/Well, pumping station & attach the surveying data sheet with design & drawing of pipe line, map of location of HYDT & Steel/RCC structure etc. all complete work. 34.129 P/KM Rs.0.00
2 Construction of HYTW etc. all complete and as per direction of E/I.
Size- 150mmX 100mmX 125M Deep 20 Each Rs.0.00
3 Constructing masonry Chamber 100x100x75 cm inside, in brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for Tube Well, and RCC top slab 1:1.5:3 mix (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size ) , necessary excavation, foundation concrete 1:2:4(1 cement : 2 fine sand : 4 graded stone aggregate 20 mm nominal size) and inside plastering with cement mortar 1:3 (1 cement : 3coarse sand) 12 mm thick with 5% cico fnished with a floating coat of neat cement, out side plastering with cement mortar 1:4 (1 cement : 4coarse sand) 12 mm thick complete as per standard specifications & direction of E/I. 20 Each Rs.0.00
4 Supplying all materials and Laying of distribution network including placing of 10000 litres PVC tank at each scheme as per the directions of Engineer in Charge including Earthwork in 30m wide and 1.1m deep trenches, Including crossing of ditches Road cutting and restoration and backfilling the trenches after laying of line, providing and laying HDPE pipe of 75 mm dia and 63 mm dia of (PE-PN10 rating) as per IS 4984/1995 and 50 mm and 40mm dia pipe (PE100-PN8 rating) as required including supplying all jointing materials etc. including all taxes, duties etc.-and incidental charges providing necessary thrust block where as required, construction of brick masonry chamber (60cm x 60cm x 75cm) for valves with cost of certification mark and fixing in trenches including the cost of fullway valves, earth work in back filling the trenches after laying of different types and sizes of pipe, fittings and valves with earth removed during excavation within initial lead and lift etc. including providing night guard, barrier and red light to safe guard against accident, testing of laid pipes etc. all complete job as per specification and direction of E/I.
G.I PIPE INCLUDING G.I FITTING
80 mm dia nominal bore from PVC tank to Distribution main 240 PM Rs.0.00
65 mm dia nominal bore used for washout and overflow from PVC Tank 80 PM Rs.0.00
50mm dia Pipe from T/well to PVC Tank 300 PM Rs.0.00
HDPE PIPE AND FITTING
110mm PE 100-PN10 0 PM Rs.0.00
90mm PE 100-PN10 1987 PM Rs.0.00
75mm PE 100-PN10 6167 PM Rs.0.00
63mm PE 100-PN10 8180 PM Rs.0.00
50mm PE 100-PN8 7530 PM Rs.0.00
40mm PE 100-PN8 10265 PM Rs.0.00
5 Supplying and installation, commissioning and testing of 2 HP/3 HP Single phase Submersible pump and motor of KSB/Kirloskar or equivalent make having discharge of 2.5 to 3.35 lps against a total head of 35 m including doing power and light wiring SUPPLYING & FITTING service wire extension of L T line (0.3Km) & 65 mm dia G I medium class column pipe, 65mm dia Riser pipe (L), 65 mm dia N/R Valve, 65 mm dia flange and Supplying and installation of 7.5 KVA Stabilizer, taking single phase connection, Meter Board, Starter including power wiring all complete job etc all complete as per direction of E/I.
3Hp submersible pump 20 Each Rs.0.00
6 Providing house connection with Retrofitting for each house hold including supplying all materials, labours, tools and making ferrule connection with 20 mm dia MDPE and 15mm CPVC Pipes with all fittings etc all complete 2450 Each Rs.0.00
7 Providing and erecting 8M high staging with ladder of ISA65x65x6 and 16mm dia MS bar as trade @ 400mm c/c and GI enclosure to house electric switch panel & treatment unit (where required) of suitably designed MS section of angle, channel, etc. as per drawing attached. /Construction of RCC Staging 4.0M x 3.0M x 8.0M High for 10000 liter water tank. 20 Each Rs.0.00
8 Installation of Electronically Regulated Doser type chlorinator using Sodium Hypo Chlorite (Hypo NaOCl) 20 Each Rs.0.00
9 Cost of Applying for Taking Electricity connection including installation of Electric Meter on the scheme. 20 Nos. Rs.0.00
10 For 2 PPM & 30% Chlorine solution of {Total population served *81*2/1000000)*(100/30)* 3months*30* No.of schemes. 119.07 P/Ltr. Rs.0.00
11 Cost for Electricity charges for a period of 3 months (Trial Run Period ) (As per sub Estimate no.-8) @ Rs.2.45/unit 20 Nos. Rs.0.00
Total:- Rs.0.00
Bidders are required make the entries in the coloured cells only.
Any existing work such as t/w / pipe line or others is in workable condition then that component will be used and new construction (duplicacy of any component) will not be allowed for that work.
GOVERNMENT OF BIHAR
Public Health Engineering Department
ABSTRACT OF COST
S.No. Description Quantity Unit Rate Total Amount
1 CONSTRUCTION OF TUBE WELL OF DIFFERENT SIZE 150MM X 100MM DIA & 125M deep T/W etc. all complete and as per direction of E/I. (As per sub est 1) 20 Nos. Rs.256,875.00 Rs.5,137,500.00
2 Constructing masonry Chamber 100x100x75 cm inside, in brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for Tube Well, and RCC top slab 1:1.5:3 mix (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size ) , necessary excavation, foundation concrete 1:2:4(1 cement : 2 fine sand : 4 graded stone aggregate 20 mm nominal size) and inside plastering with cement mortar 1:3 (1 cement : 3coarse sand) 12 mm thick with 5% cico fnished with a floating coat of neat cement, out side plastering with cement mortar 1:4 (1 cement : 4coarse sand) 12 mm thick complete as per standard specifications & direction of E/I. (As per sub Estimate no.- 2) 20 Nos. Rs.16,256.00 Rs.325,120.00
3 Providing and Laying Distrbution network of High Density Polyethyene pipe (HDPE pipe) including 10000 liter PVC tank installed at 8M high MS staging etc all complete as per direction of E/I. (As per sub Estimate no.- 3) 1 Job Rs.19,729,146.86 Rs.19,729,146.86
4 Supply Installation, commissioning and testing of single phase submersible pump set of 3 H.P. submersible pump set having discharging capacity 3.35 lps at a total head of 35 meter(approx) of KSB/Kirloskar or equivalent make with all accessories & fittings etc including loading unloading and transportation of the pump set to the work site with all required labour, materials, tools and tackles installation, testing & commissioning as per standards specifications and direction of E/I. (As per sub Estimate no.-4) 20 Nos. Rs.105,000.00 Rs.2,100,000.00
5 Providing house connection for each house hold including supplying all materials, labours, tools and making ferrule connection with 20 mm dia with all fittings etc all complete. (As per sub Estimate no.-5) 2450 Nos. Rs.2,490.00 Rs.6,100,500.00
6 Providing and erecting 8M high staging with ladder of ISA65x65x6 and 16mm dia MS bar as trade @ 400mm c/c and GI enclosure to house electric switch panel & treatment unit (where required) of suitably designed MS section of angle, channel, etc. as per drawing attached. (As per sub Estimate no.- 6) 20 Nos. Rs.685,200.00 Rs.13,704,000.00
7 Installation of Electronically Regulated Doser type chlorinator using Sodium Hypo Chlorite (Hypo NaOCl) (As per sub Estimate no.- 8) 20 Nos. Rs.23,515.00 Rs.470,300.00
8 Surveying and levelling using Total station/DGPS or Auto level instruments of the project area including transfer of relevent bench mark to establish the levels of strategic points at the selected position of the T/Well, pumping station & attach the surveying data sheet with design & drawing of pipe line , map of location of HYDT & Steel structure etc. all complete work. 34.12 KM Rs.5,000.00 Rs.170,600.00 10860.00
SUB TOTAL AMOUNT Rs.47,737,166.86
Multiplying by Factor 1.0536 for Taking GST@18% in Place of existing 12% GST Rs.50,295,879.01
SUB TOTAL - PART-A Rs.50,295,879.01
9 Cost of Applying for Taking Electricity connection including installation of Electric Meter on the scheme. 20 Nos. 200 Rs.4,000.00
10 For 2 PPM & 30% Chlorine solution of { Total population served *81*2/1000000)*(100/30)*3months*30* No.of schemes. 119.07 P/Ltr. 150 Rs.17,860.50
11 Cost for Electricity charges for a period of 3 months ( Trial Run Period ) (As per sub Estimate no.-8) @ Rs.2.45/unit 20 Nos. 4860 Rs.97,200.00
SUB TOTAL - PART-B Rs.119,060.50
Grand total ( Part A + Part B) Rs.50,414,939.51
Total Rs.50,414,939.51
Executive Engineer
P.H.Division, Gopalganj
Sl No. PRDTransferID Division Block Panchyat Ward No Details Distrubution System
छुटे हुए टोला का नाम छुटे हुए हाउस कनेक्शन की संख्या 90mm 75mm 63mm 50mm 40mm Total length
1 2385 GOPALGANJ PHULWARIA PAKAULI BADO 2 Paikoli Bado 105 Estimated cost (In Lakh) 80 330 365 370 520 1665
2 28892 GOPALGANJ MANJHA GOSAI 5 Manjha 105 Estimated cost (In Lakh) 105 340 450 460 530 1885
3 28905 GOPALGANJ MANJHA GOSAI 4 Purab Tola 150 Estimated cost (In Lakh) 110 310 420 400 495 1735
4 53233 GOPALGANJ KOILA DEVA 12 Madharwali 100 Estimated cost (In Lakh) 90 300 415 365 490 1660
5 53218 GOPALGANJ KOILA DEVA 6 Siyarah 100 Estimated cost (In Lakh) 100 250 430 380 530 1690
6 53401 GOPALGANJ KOILA DEVA 11 Koyela Deva 200 Estimated cost (In Lakh) 105 310 390 385 495 1685
7 53222 GOPALGANJ KOILA DEVA 5 Pakariya Dalit Basti 120 Estimated cost (In Lakh) 93 315 410 390 530 1738
8 43273 GOPALGANJ KAMLAKANT KARARIYA 5 Harijan Tola 110 Estimated cost (In Lakh) 100 330 395 365 515 1705
9 43295 GOPALGANJ KAMLAKANT KARARIYA 4 Chaudhari Tola 110 Estimated cost (In Lakh) 95 330 400 320 510 1655
10 14423 GOPALGANJ GIDHA 3 Rakaba 120 Estimated cost (In Lakh) 80 330 365 370 520 1665
11 27942 GOPALGANJ GIDHA 13 Bhagwanpur 150 Estimated cost (In Lakh) 95 295 380 355 535 1660
12 52825 GOPALGANJ GANESH DUMMAR 8 Dudhwaliya 100 Estimated cost (In Lakh) 97 316 420 380 495 1708
13 286 GOPALGANJ FULWARIYA 2 Kalyani 100 Estimated cost (In Lakh) 130 310 420 400 550 1810
14 293 GOPALGANJ FULWARIYA 4 Sahab Chapra 110 Estimated cost (In Lakh) 90 300 415 365 490 1660
15 278 GOPALGANJ FULWARIYA 3 Bhagwat Parsa Patti 130 Estimated cost (In Lakh) 97 316 420 380 495 1708
16 298 GOPALGANJ FULWARIYA 5 Madipur Dalit Tola 110 Estimated cost (In Lakh) 130 310 420 400 550 1810
17 3756 GOPALGANJ CHURAMAN CHAK 14 Harijan Tola 120 Estimated cost (In Lakh) 90 300 415 365 490 1660
18 14052 GOPALGANJ BAIRAGI TOLA 8 Bairagi Tola 120 Estimated cost (In Lakh) 100 250 430 380 530 1690
19 14418 GOPALGANJ BAIRAGI TOLA 13 Brichha Bathua 180 Estimated cost (In Lakh) 90 295 415 340 515 1655
20 13394 GOPALGANJ BAIRAGI TOLA 2 Lakshan Tola khap 110 Estimated cost (In Lakh) 110 330 405 360 480 1685
J.E A.E Executive Engineer
P.H. Division Gopalganj
aoc.json
Purchase Order
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Nit_15_R3_2026-27.pdf
NIT • 1.50 MB
Work _Qty_Details_15R3_Gr_01.pdf
NIT • 0.22 MB
Notes_To_Tender_15R3_2025-26 Group- 1.doc
NIT • 0.98 MB
Nit_15_R3_2026-27.pdf
NIT • 1.50 MB
Nit_15_R3_Paper_Cutting.pdf
NIT • 1.05 MB
Nit_15R3_Technical_GR_01.xls
NIT • 0.26 MB
Nit_15R3_Financial_Gr_01.xlsx
NIT • 0.35 MB
Nit_15R3_Financial_Gr_01.xlsx
NIT • 0.35 MB
C2 Corrigendum NIT-15R3-206-27.pdf
Corrigendum • 0.38 MB
C1 Nit_15R3_2026-27.pdf
Corrigendum • 1.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .