Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 LAccepted-Finance | L1 | Accepted-Finance Lowest amount | |
| 2 | L2₹6.0 L+₹6,596.20 (1.10%)Rejected-Finance | L2 | Rejected-Finance High amount | |
| 3 | L3₹6.1 L+₹16,095.20 (2.69%)Rejected-Finance | L3 | Rejected-Finance High amount | |
| 4 | L4₹6.3 L+₹29,547.20 (4.94%)Rejected-Finance | L4 | Rejected-Finance High amount | |
| 5 | L5₹6.3 L+₹33,559.20 (5.61%)Rejected-Finance | L5 | Rejected-Finance High amount |
Tender Value
Refer Docs
Closing Date
14 Jun 2021, 6:00 pmClosed
Kashi Prasad GE
No 1 General Bhagat Marg, Pune - 40
Special repairs to Medical gas pipe line system at AICTS Pune under GE (South) Pune.
2021_MES_448925_1
3001/Eqtn/07/E3
Limited
Job Works
Works
60 days
GE (South) Pune
Please refer Tender documents.
1 document required · 1 mandatory
₹0
Exempted
19 Jun 2021
5 Jun 2021
15 Jun 2021
7 Jun 2021
14 Jun 2021
7 Jun 2021
Supply, installation, testing and commissioning of oxygen manifold suitable for connecting 20+20 cylinders along with centre frame NRV, tail pipes etc marked, conforms to BS EN ISO 7396 – 1:2007/NFPA 99 : 2005/Type 1, HTM 01-02 incl taking down old system all as specified and directed Make AKTIV/LMPL/QMS/MES = 01 Set.
Supply, installation, testing and commissioning of Fully automatic control panel for Oxygen. 1350 LPM capacity complies and meets with HTM02 – 01/NFPA99/ISO7396-1 Incl taking down old system all as specified and directed. Set - 01 Note for item 1 to 2 : The Oxygen manifold system and automatic Oxygen control panel shall be comprising of following :- (a) The system shall be digital 3.5”colourful disply. (b) Integrated and protected test points. (c) Central regulator panel with cylinder headers in each side. (d) Headers are complete with gas specific cylinder tail pipes for 2x20 cylinders. (e) Prewired for alarm connection. (f) All components degreased for Oxygen use. (g) Actual gas consumption indication. (h) Remaining gas volume indicator. (j) General maintenance indicator. (k) Service for use-Oxygen. (l) Mouting on powder coated backplate. (m) Max inlet pressure 230 bar. (n) Outlet pressure reduced upto 700 Kpa (7 Bar). (o) Header rack service. (p) Relief valve stings 4 bar manifold at 5.3 Bar.
Pipeling & Accessories :- M & L laying of Oxytgen gas pipe line on wall/wall brackets. Distribution copper pipe manufactured as per BS EN 13348:2001 standard alongwith third party inspection certificate from Lloyds’/SGS. (a) 28mm OD x 0.9mm thick = 4 RM. (b) Copper reducer socket 28mm x 15 = 01 No. Each - 01
RIYA ENTERPRISES
ZAITUN TRADERS
Star Traders
SHIVKRUPA TRADERS
Saraswati Enterprises
K.K.Enterprises
ALKA TRADERS
Anjali Enterprises
AABHA ENTRPRISES
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
finance_500604.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .