Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 CrAccepted-AOC | ₹3.6 Cr | L1 | Accepted-AOC Accepted being L1 |
| 2 | L2₹3.7 Cr+₹7.8 L (2.17%)Rejected-Finance | ₹3.7 Cr+₹7.8 L (2.17%) | L2 | Rejected-Finance Rejected being L2 |
| 3 | L3₹4.5 Cr+₹92.1 L (25.8%)Rejected-Finance | ₹4.5 Cr+₹92.1 L (25.8%) | L3 | Rejected-Finance Rejected being L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically not Responsive |
| 5 | Rejected-Technical | - | - | Rejected-Technical Technically not Responsive |
Tender Value
₹4.1 Cr
EMD Value
₹4.9 L
Closing Date
27 Oct 2020, 12:00 pmClosed
Chief Engineer Project Sampark
HQ CE Project Sampark Near Peer Baba Kunjwani Jammu
RESURF WKS ON PART I BET KM 177.650 TO 183.900, KM 186.341 TO 186.487, KM 188.125 TO 190.550 AND KM 192.165 TO 194.700 ON AOR 58 RCC AND FOR PART II BET KM OLD LOCATION KM 207.345 TO 210.970 AND KM 213.175 TO KM 215.175 (NEW LOC KM 207.345 TO 212.970
2020_BRO_588336_1
CE (P) SPK/15/2020-21
Open Tender
Civil Works - Highways
Lump-sum
120 days
BET KM 177.650 TO KM 215.175 ON ROAD RAJOURI BG SU
As per tender documents
16 documents required · 16 mandatory
₹0
₹4.9 L
Yes
HQ CE (P) Sampark
15 Jan 2021
5 Oct 2020
28 Oct 2020
5 Oct 2020
27 Oct 2020
15 Oct 2020
6 Oct 2020 - 12 Oct 2020
13 Oct 2020
Amount
(PART-I BETWEEN KM 177.650 TO KM 183.900, KM 186.341 TO KM 186.487, KM 188.125 TO KM 190.550 AND KM 192.165 TO KM 194.700 ON ROAD RAJOURI-BG-SURANKOT-POONCH (NH 144A) UNDER 58 RCC/31BRTF
Providing, laying and compaction of 30 mm thick BC including tack coat as per clause 507 of MORT&H specification (Vth Revision) and as specified at particular specification.
Correction work with BM 50mm thick including tack coat as per clause 504 of MORT&H specification (Vth Revision) and as specified at particular specification.
Road marking with thermoplastic paint (2.5 mm thick) confirming to clause 803.4 of MORT&H specification (Vth Revision) and as specified at particular specification.
PART-II BETWEEN OLD LOCATION KM 207.345 TO 210.9700 AND KM 213.175 TO KM 215.175(NEW LOCATION KM 207.345 TO KM 212.970) ON ROAD RAJOURI-BG-SURANKOT-POONCH (NH-144A) UNDER 79 RCC/31 BRTF
Providing, laying and compaction of 30 mm thick BC including tack coat as per clause 507 of MORT&H specification (Vth Revision) and as specified at particular specification.
Correction work with BM 50mm thick including tack coat as per clause 504 of MORT&H specification (Vth Revision) and as specified at particular specification.
Road marking with thermoplastic paint (2.5 mm thick) confirming to clause 803.4 of MORT&H specification (Vth Revision) and as specified at particular specification.
M/S Masood Ahmed Contractor
SHAM ARMY STORES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .