| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹59.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹63.4 L+₹3.8 L (6.31%)Rejected-Finance C 1001 NOIDA ONE SECTOR 62 NOIDA GAUTAM BUDDHA NAGAR UTTAR PRADESH 201309 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201309 | L2 | Rejected-Finance L2 | |
| 3 | L3₹66.8 L+₹7.2 L (12.1%)Rejected-Finance 121 GOLDEN PLAZA TAGORE ROAD RAJKOT RAJKOT GUJARAT 360002 | RAJKOT | GUJARAT | 360002 | L3 | Rejected-Finance L3 | |
| 4 | L4₹69.6 L+₹10.0 L (16.7%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹79.8 L+₹20.2 L (33.8%)Rejected-Finance E 51 INDUSTRIAL FOCAL POINT CHANALON MOHALI 140103 | MOHALI | MOHALI | PUNJAB | 140103 | L5 | Rejected-Finance L5 |
Tender Value
₹85.5 L
EMD Value
₹96,004
Closing Date
28 Dec 2022, 6:00 pmClosed
AGM (E-E), Gaya Airport, Gaya
AGM (E-E), AAI, Gaya Airport, Gaya
SITC of 50 KLD FRP Underground Packaged Sewage Treatment Plant including Annual Operation and Comprehensive Maintenance for 05 Years at Gaya Airport, Gaya Bihar
2022_AAI_137455_1
AAI/GY/AGM (E)/ STP /eNIT-08/22-23/
Open Tender
Electrical Works
Works
90 days
Gaya Airport
Please refer Tender documents.
14 documents required · 14 mandatory
₹1,120
₹96,004
2 Apr 2024
7 Dec 2022
30 Dec 2022
8 Dec 2022
28 Dec 2022
8 Dec 2022
8 Dec 2022 - 13 Dec 2022
Amount
Design , supply, Installation, Testing & Commissioning of underground FRP tank based Package type prefabricated Moving Bed Bio Reactor Based Sewage Treatment Plant of 50 KLD capacity System. The FRP Tank should be suitable for installation below ground . Semi treated water from settling / Sedimentation zone shall be tertiary treated using a pressure sand filter, Activated Carbon Filter (ACF). System must be designed to meet the outlet parameters given below. The system must be provided with UV based disinfection at the final outlet. INLET EFFLUENT CHARACTERSTICS pH - 6.5 –8.5 BOD - 300-350Mg/L S. Solids - 400-500 Mg/L COD - 500-600 Mg/L Oil & Grease - 40-50 Mg / L DISCHARGE EFFLUENT CHARACTERSTICS AFTER TREATMENT pH - 6.0 – 9.0 BOD - Less than 10 Mg/L S. Solids - Less than 20 Mg/L COD - Less than 250 Mg/L Oil & Grease - Less than 10 Mg/L FRP Package type Sewage treatment plant shall include the following items: RCC Chamber with S.S Bar screen (Size shall be as per OEM) RCC Chamber with S.S Bar screen (Size shall be as per OEM) Oil & Grease Trap including RCC Chamber (Size shall be as per OEM) FRP underground Tank with different zone as below. (Complying Relevant IS/ International standard if any). Solid separation Zone Aeration zone with MBBR Reactors Sedimentation zone Raw sewage Pumps (1 working and 1 standby)- Capacity shall be as per OEM & Make shall be as per list of approved make. HDPE pipeline of suitable diameter as per OEM for raw sewage from septic tank to inlet of STP- 150m (approx) Air Blowers (1 working and 1 standby) - Capacity shall be as per OEM & Make shall be as per list of approved make. Filter feed Pumps (1 working and 1 standby)- Capacity shall be as per OEM & Make shall be as per list of approved make. Piping, valves etc. Tertiary treatment plant with MGF filter and Activated carbon filter with FRP Tank. Irrigation/ Final treated Water tank (FRP Tank capacity 10KL). Dedicated Irrigation / Final treated Water Transfer Pumps (Capacity 3 cum per hour with 30 mtr. Head). Electrical Panel as per OEM, Cabling and 2 Nos. GI Plate Earthing. i) Electrical cable from STP electrical panel to all STP equipments including making their connnection, termination etc shall also be included in quoted price. Note: ii) Total capacity of FRP underground tank shall be minimum 30KL (which shall include solid separation zone+ aeration zone + Sedimentation zone) and thickness of FRP underground tank shall be 20mm minimum. Semi treated water zone may be constructed in main FRP Tank or separate FRP Tank of capacity 5KL can be provided. iii) Contractor shall ensure submission of detailed GA drawings (Plan & Section), P&I diagram, schematic diagram for the above system including additional component if so required for the complete working of the STP before procurement of material for approval from Engineer-In-charge. Associated Civil works : A) EXCAVATION of soil, Construction of PCC, RCC, Brick work for mounting FRP Package type STP above & below ground, Foundation for Panel, HDPE tank, Air Blower, pumps etc. Complete as required. B)Construction of Bar screen chamber, Oil Grease trap etc complete as required already mentioned in Item No.01.
Construction of Plant/Control Room of minimum size of 6 x 4 x 4 Mtr with good engineering practice and as per CPWD / IS specifications using Brick work, Cement Concrete for walls & Concrete Cement floor, suitable size reinforcement with galvanized iron profile roofing of minimim 0.5 mm thickness, complete with plastering , painting etc. as required. Providing 1 no. Aluminium Door & 2 nos Windows also in scope of contractor. Electrical works inside the control room i/c providing & fixing 4 Nos of LED type 20 W tube light fixture complete with all accesories & drivers etc including wiring, supply & installation i/c wiring of 02 number of 1200 mm sweep ceiling fans with regulators, supply, installation i/c wiring of 1 No. of 450 mm sweep exhaust fan including making holes to suit the size (all items should be as per approved makes) & providing point wiring & switch and sockets as per site requirement etc complete as directed by the Engineer-in-charge are also in scope of Contractor.
Providing and fixing HDPE pipes, HDPE & brass threaded fittings for treated water reuse. This includes jointing of pipes & fittings, trenching, refilling & testing of joints complete as per direction of Engineer in Charge.
63 mm dia
25 mm dia
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge.
Annual Operation and Comprehensive Maintainance Contract for five (5) Years Annual operation and all- inclusive comprehensive maintenance of 50 KLD STP inclusive of all spares & material & carrying out breakdown & the preventive maintenance complete as per direction of AAI. (After testing, commissioning and handing over to AAI)
First year ( during Defect Liabilty Period) (17.28% of item no. 1)
Second year (after Defect Liabilty Period ) (19.01% of item no. 1)
Third Year (after Defect Liabilty Period ) (20.91% of item no. 1)
Fourth Year (after Defect Liabilty Period ) (22.05% of item no. 1)
Fifth Year (after Defect Liabilty Period ) (22.65% of item no. 1)
BLUEWATERTECH SERVICES PRIVATE LIMITED
Unicare Technologies Pvt Ltd
greenagersenviro solutions and services pvt. ltd.
PALEO CRYSTAL ENVIRO TECHNOLOGIES PVT LTD
chemeco Engineers
CLEAR ION EXPERTS PVT LTD
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .