Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹16 L
EMD Value
₹16,000
Closing Date
25 Jul 2025, 3:00 pmClosed
bdo bp kallikudi
bdo bp kallikudi
Madurai District (Package-5) Repairs to Pt. Union Primary School Building (Mangalore tiled Roof),(RCC 3CR) in Karisalkalampatti village at Karisalkalampatti Panchayat.in Kallikudi block
2025_RDTN_582877_1
5/Kalli/ SIUS /2025-26
Open Tender
Civil Works - Buildings
Works
120 days
Kallikudi
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹16,000
29 Jul 2025
18 Jul 2025
25 Jul 2025
18 Jul 2025
25 Jul 2025
18 Jul 2025
Amount
Madurai District Repairs to Pt. Union Middle School Building (Mangalore tiled Roof) in Karisalkalampatti village @ Karisalkalampatti Pt. Pt. in Kallikudi Panchayat Union.
Dismantling of damaged wall Plaster and removed away from the site including all labour charges etc complete.
Removing of Pantile or mangalor tileld roof without roof timbers
Cost and Supply of Steel Door including all cost and conveyance of materials and all labour charges etc complete.size (0.90x2.10)
Cost and Supply of Steel Window including all cost and conveyance of materials and all labour charges etc complete.size (0.90 x1.20m )
Plastering 1:5 (one cement and five sand) to 12 mm thick including mixing mortar, working in all heights curing watering with good water etc., complete complying with standard specification.
Labour charges for fixing of Steel doors including all charges etc., complete complying with standard specification.
Labour charges for fixing of Steel windows including all charges etc., complete complying with standard specification.
Supply and fixing of PUF roof panels made up of minimum 0.5mm thick PPGI corrugated Sheet at the top and a plain sheet at the bottom with a layer of rigid CFC free polyurethane foam (PUF) of density 40kg + 2 Kg/cum as insulation in between .The polyurethane foam shall confirm to latest IS 12436. The minimum thickness of PU foam layer shall be 29mm for having 30mm (min) thick PUF panel. The PPGI Sheets shall be of minimum 240 MPA Steel Grade & shall have a Zinc coating of minimum 120 GSM as per IS 277/1992, 5-7 microns of epoxy primer on both sides of the sheet & polyester top coat of 18-20 microns on one side / outer side. The PPGI Sheets / PUF Panels shall have a protective guard film of minimum 20-25 microns to avoid scratches to finished panel during transportation. Providing ridges or hips ,encasing the ends of Panel with plain G.S. sheet fixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limpet and bitumen washers etc complete excluding the cost of trusses, purlins and inclusive of cutting to size and shape wherever required. (W-0373)
Provision for Bala Painting Arrangement's Charges including cost and conveyance of all materials and labour charges
Distempering two coats over a coat of primer including preparation of surface by removing loose particles and other materials and applying lips wherever required to make the surface smooth including cost and conveyance of all materials and labour charges
Plastic Emulsion painting with two coats over a coat of primer including preparation of surface by removing loose particles and other materials including cost and conveyance of all materials and labour charges etc. complete.
Painting two coats over New iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc complete complying with stand
Block board Painting including all cost and conveyance of all materials and all labour charges etc., complete.
CONSTRUCTION OF CUP BOARD WITH SHUTTER
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Providing cuddapah slab 25 mm for shelfs etc., all complete
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work. (SOR - 2022 -23 Page No-43 SI No-124)
CONSTRUCTION OF CHAPPAL RACK OUTSIDE THE CLASS
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Providing cuddapah slab for shelfs etc., all complete
CONSTRUCTION OF PEDASTAL FOR KEEPING THE DRINKING WATER TANK
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
CC 1:4:8 Mix using 40mm metal including all charges etc complete
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Plastic Emulsion painting with two coats over a coat of primer including preparation of surface by removing loose particles and other materials including cost and conveyance of all materials and labour charges etc. complete.
Provision for 500 ltr Water Tank (M-0540)
Provision for Name Board and Photo charges
Repairs to Pt. Union Middle School Building (RCC - 3CR) in Karisalkalampatti village @ Karisalkalampatti Panchayat.
Dismantling of damaged wall Plaster and removed away from the site including all labour charges etc complete.
Dismantling the existing damaged Chipping of concrete & roughening the surface and removed away from the site including all labour charges etc complete.
Plastering 1:5 (one cement and five sand) to 12 mm thick including mixing mortar, working in all heights curing watering with good water etc., complete complying with standard specification.
Paving the floor with best approved quality fine polished Kota stone slabs of size 600 x 600 of 18 / 20mm with machine cut edges and matching marble slab not less than 100mm width other than Adanga Marbles as border laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three M.Sand) fixing the slabs in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments and polishing with floor polisher to a high degree of finish etc., The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification.
Granaolithic floor finish of 25mm thick in PCC 1:2:4 using 10-12 mmHBGS Jelly inculding curing ete.complete.,
White washing two coat using best freshly burnt white shell lime in all the floors, including cost of lime, fevical type gum, brushes,scaffolding charges etc.
Provision for Bala Painting Arrangement's Charges including cost and conveyance of all materials and labour charges
Distempering two coats over a coat of primer including preparation of surface by removing loose particles and other materials and applying lips wherever required to make the surface smooth including cost and conveyance of all materials and labour charges
Plastic Emulsion painting with two coats over a coat of primer including preparation of surface by removing loose particles and other materials including cost and conveyance of all materials and labour charges etc. complete.
Painting two coats over Old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc complete complying with stand
Block board Painting including all cost and conveyance of all materials and all labour charges etc., complete.
CONSTRUCTION OF CUP BOARD WITH SHUTTER
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Providing cuddapah slab 25 mm for shelfs etc., all complete
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work. (SOR - 2022 -23 Page No-43 SI No-124)
CONSTRUCTION OF CHAPPAL RACK OUTSIDE THE CLASS
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Providing cuddapah slab for shelfs etc., all complete
RAIN WATER HARVESTING STRUCTURE
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Collection and supply of M.sand filling into the basement including cost and conveyance to the site and all labour charges.
40 mm metal Collection and supply of filling the stones in soakpit including cost and conveyance of materials to the work site and all labour charges.
20 mm metal Collection and supply of filling the stones in soakpit including cost and conveyance of materials to the work site and all labour charges.
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Supplying and fixing in position best approved of BIS quality PVC rain water down fall pipes 110mm having a pressure of 4 kg. / sq.cm including cost of necessry PVC shoe, PVC bend, cast iron gratings of required diameter and special clamps, brass screws, nails, etc., and fixing of cast iron gratings at junction of parapet and the RCC roof slab including finishing neatly etc., complete. The rate shall be inclusive of cast of removable cast iron grating. The PVC pipe shall be fixed in wall with special type of "U" clamp at the centre of the pipe line in addition to those for more than 3.0 metre pipe length, etc., complete complying with standard specification.
Provision for Name Board and Photo charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
K KARPAGAM CONTRACTOR (BID ID -1411841)
V KARUPPIAH (BID ID -1412034)
Muthumari Sundram (BID ID -1410678)
SARAVANAN T (BID ID -1411958)
KANTHASAMY PERIYASAMY (BID ID -1412124)
RAMAMOORTHY K S (BID ID -1411950)
M.VISHAGAN (BID ID -1411261)
V SAKTHIVEL (BID ID -1412393)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .