Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.0 LAccepted-AOC MANDAL JI HOUSE TO KEDAR PRASHAD HOUSE ASHOK KUMAR GUPTA HOUSE | ₹10.0 L | 1 | Accepted-AOC Work Awantan |
| 2 | 2₹10.5 L+₹47,845.43 (4.79%)Rejected-Finance HASDIHA DUMKA | ₹10.5 L+₹47,845.43 (4.79%) | 2 | Rejected-Finance L2 |
| 3 | 3₹12.9 L+₹2.9 L (28.8%)Rejected-Finance | ₹12.9 L+₹2.9 L (28.8%) | 3 | Rejected-Finance L3 |
Tender Value
₹16.3 L
EMD Value
₹33,000
Closing Date
16 Apr 2026, 5:00 pmClosed
EXECUTIVE ENGINEER
RURAL DEVELOPMENT SPECIAL DIVISION DUMKA
Contruction and Repair of Boundary wall in Anusuchit Janjatiya Awasiya Balika Uchha Vidalaya Karharbil Block-Dumka, Distt-Dumka.
2026_RDSPL_112261_1
RDSD/DMK/UNTIED/33/25-26_Gr.05
Open Tender
Civil Works
Percentage
60 days
Dumka
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹33,000
18 Jul 2026
2 Apr 2026
18 Apr 2026
2 Apr 2026
16 Apr 2026
2 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentaling pucca brick or lime work including stacking serviceable materials in countable stacks eithin 15 M lead and disposal of unserviceable materials with all leads all complete as per direction of E/I | - | M3 | - | - |
| 2 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete | - | M2 | - | - |
| 3 | Dismentaling old plaster and pointingin cement or lime and racking out joints to 15mm depth watering and disposal ofunserviceable materials with all leads all complete as per direction of E/I | - | M2 | - | - |
| 4 | EARTH WORK IN EXCAVATION IN FOUNDATION Trenches in ordinary soil (vide classification of soil item -A) and disposal of excavated earth as obtained to a distance upto 50 M including all lift, leveling ramming the foundation trenches, removing roots of tree shrubs all complete as per approved design, building specification and direction of E/I. | - | M3 | - | - |
| 5 | Providing coarse clean local SAND IN FILLING in foundation trenches or in plinth including ramming and watering in layer not exceeding 150 mm thick with all leads and 1.5 M lifts including cost of all materials, labours, royalty and taxes all complete as per building specification and direction of Engineer Incharge (Mode of measurement compacted volume) | - | M3 | - | - |
| 6 | EARTH FILLING IN FOUNDATION TRENCHES AND PLINTH in layers not exceeding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation foundation trenches within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I. (mode of measurement compacted volume) | - | M3 | - | - |
| 7 | Providing designation 75-B BRICK FLAT SOLING joints filled with local sand including cost of watering,taxes and royalty all complete as per building specification and direction of Engineer Incharge. | - | M2 | - | - |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering -all work up to plinth level: (1:2:4) (1 cement : 3 coarse sand (zone III ) : 4 graded stone aggregate 20 mm nominal size ) | - | M3 | - | - |
| 9 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | - | M3 | - | - |
| 10 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : | - | M3 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_151540.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
five.pdf
Tender Documents • 0.68 MB
BOQ_151540.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .