Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 LAccepted-Finance ASSOLNA SOUTH GOA | SOUTH GOA | GOA | 403802 | ₹9.7 L | L1 | Accepted-Finance being 1st lowest |
| 2 | L2₹11.5 L+₹1.8 L (18.7%)Rejected-Finance GOA | SOUTH GOA | GOA | 403712 | ₹11.5 L+₹1.8 L (18.7%) | L2 | Rejected-Finance being 2nd lowest |
| 3 | L3₹12.3 L+₹2.7 L (27.5%)Rejected-Finance H NO G 675 2 GAULEBHAT CHIMBEL TISWADI GOA | ₹12.3 L+₹2.7 L (27.5%) | L3 | Rejected-Finance being 3rd lowest |
Tender Value
₹12.1 L
EMD Value
₹24,204
Closing Date
21 Aug 2026, 5:00 pmClosed
EXECUTIVE ENGINEER
DIVISION XVI (BLDGS), P.W.D. PONDA GOA
Urgent land development works infront of Main Entrance of Centre of Excellence ITI at Farmagudi Ponda Goa.
2026_PWD_31096_1
PWD/DIVISION XVI (BC)/TS/10/2026-2027 Line 03
Open Tender
Civil Works - Buildings
Percentage
8 days
ITI at Farmagudi Ponda Goa.
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹24,204
1 Sept 2026
15 Aug 2026
24 Aug 2026
15 Aug 2026
21 Aug 2026
15 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 11.18 | cu.m | 2,211 | ₹24,718.98 |
| 2 | Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing : a) All works upto plinth level | 22.36 | cu.m | 6,635 | ₹1,48,358.6 |
| 3 | Providing and laying in position ready mixed concrete (RMC) with usage of Ordinary Portland Cement manufactured in fully automatic batching plant and transported to site of work in transit mixer for a lead upto 10kms having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C., from the transit mixer to the site of laying, excluding the cost of centering, shuttering, finishing and reinforcement including the cost of admixtures in recommended porportions as per IS : 9103 to accelerate/retard setting of concrete, improve workability without imparing strength and durability as per the directions of the engineer-in-charge. All works upto floor V level v) M-30grade of concrete | 51.62 | cu.m | 8,874 | ₹4,58,075.88 |
| 4 | Providing TMT steel reinforcement bars of (SAIL, TATA. VIZAG, JSW Steel Ltd.) ) (Confirming to IS 1786 of 1986) for RCC work (conforming to I.S. 1786 of 1986) including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member. | 5,420.1 | kg | 105 | ₹5,69,110.5 |
| 5 | Supplying and filling in plinth under floors, trenches including watering ramming consolidating, dressing, complete. B)Moorum | 15 | cu.m | 662 | ₹9,930 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_31495.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .