Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.3 LAccepted-AOC H NO 1566 2 SECTOR 30 B CHANDIGARH | NA | NA | 160001 | L1 | Accepted-AOC L1 QUOTED | |
| 2 | L2₹28.1 L+₹13,515 (0.48%)Rejected-AOC 5021 1 CAT III MODERN HOUSING COMPLEX MANIMAJRA CHANDIGARH | CHANDIGARH | CHANDIGARH | 160001 | L2 | Rejected-AOC L2 QUOTED | |
| 3 | L3₹28.1 L+₹17,448 (0.62%)Rejected-AOC | L3 | Rejected-AOC L3 QUOTED | |
| 4 | L4₹28.9 L+₹96,430 (3.45%)Rejected-AOC FLAT NO 203 GH 5 SECTOR 27 PANCHKULA 134116 HRY | PANCHKULA | HARYANA | 134116 | L4 | Rejected-AOC L4 QUOTED | |
| 5 | L5₹29.9 L+₹2.0 L (7.10%)Rejected-AOC | L5 | Rejected-AOC L5 QUOTED |
| Sl No | Description | Qty | Unit | MOHAMMAD RASHID L1 | Harbhajan Singh Sandhu and Sons L5 | B N FRIENDS AND CO L4 | P.G.INFRASTRUCTURE L3 | M/s APEX ENTERPRISES L2 | MS FUTEC ENGINEERS L6 |
|---|---|---|---|---|---|---|---|---|---|
| .01Note :The unit rate quoted by the tenderer under Col No (13) of Sch `A’ (BOQ) unless specifically mentioned otherwise such as labour only/fixing only, for all items of works shall be deemed to be including cost of all materials, labour, tools and plants, testing and commissioning of work in position complete as required for entire completion of work. | |||||||||
| 1.00 | Brick work with sub-class `B' bricks Fly ash bricks (bricks shall be burnt clay fly ash building bricks as per IS- 13757), straight or curved on plan exceeding 6 M mean radius built in cement sand mortar 1:4 complete in and including demolition of brickwork or stone boulder masonary built in cement mortar including all quoins, arches, pillars etc for the area where unservicable bricks retrived and removal of rubbish outside MoD land , complete all as specified and directed by Engineer-in-Charge.
Notes: (i) Servicable bricks retrived from demolition of this item shall be used after proper cleaning and washing of old bricks under item No.02 below.
(ii) Tile work to be executed in any position or in any patches or as per site requirement. | 12 | CUBIC METRE | 5,500 ₹66,000 | 4,000 ₹48,000 Lowest | 4,500 ₹54,000 | 4,400 ₹52,800 | 4,800 ₹57,600 | 4,500 ₹54,000 |
| 2.00 | Brick work with sub-class `B' bricks, straight or curved on plan exceeding 6 M mean radius (except bricks) built in cement sand mortar 1:4 complete in and including demolition of brickwork or stone boulder masonary built in cement mortar including all quoins, arches, pillars etc for area where servicable bricks retrived and removal of rubbish outside MoD land ,complete all as specified and as directed by Engineer -in-Charge.
Notes: (i) Servicable bricks retrived from demolition of item No.01 and this item shall be used under this item after proper cleaning and washing of old bricks.
(ii) Tile work to be executed in any position or in any patches or as per site requirement. | 5 | CUBIC METRE | 2,800 ₹14,000 | 1,600 ₹8,000 Lowest | 2,500 ₹12,500 | 2,000 ₹10,000 | 2,400 ₹12,000 | 2,200 ₹11,000 |
| 3.00 | First quality glazed ( digital glossy finish) ceramic coloured tiles of 350x450x8 mm thick fixed joint free laid on vertical surfaces such as skirting, dados and risers to steps etc laid over and including 10mm thick cement plaster in CM (1:4) set and jointed in neat cement paste of honey like consistancy and pointed in white or coloured cement to match the shade of tiles in and including dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) and removal of rubbish outside MoD land ,complete all as specified and as directed by Engineer -in-Charge.
Notes :- (i) Design, pattern and colour of tiles will be as approved by GE.
(ii) Tile work to be executed in any position or in any patches or as per site requirement. | 150 | SQUARE METRE | 700 ₹1,05,000 | 600 ₹90,000 Lowest | 700 ₹1,05,000 | 700 ₹1,05,000 | 730 ₹1,09,500 | 700 ₹1,05,000 |
| 4.00 | First quality, Non skid ceramic coloured tiles, 7 to 8 mm thick joint free (square/ rectangular) area of each tile exceeding 0.11 Sq.m but not exceeding 0.18 Sq.m, laid in floors with neat cement slurry @ 3.00 kg/Square Metre over and including 15 mm thick screed bed of cement mortar (1:4) including pointing in white or coloured cement to match the shade of tiles in and including dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) and removal of rubbish outside MoD land ,complete all as specified and as directed by Engineer -in-Charge.
Notes :- (i) Design, pattern and colour of tiles will be as approved by GE.
(ii) Tile work to be executed in any position or in any patches or as per site requirement. | 100 | SQUARE METRE | 700 ₹70,000 | 600 ₹60,000 Lowest | 700 ₹70,000 | 700 ₹70,000 | 710 ₹71,000 | 700 ₹70,000 |
| 5.00 | Rendering 15 mm thick on brick work or concrete surfaces in cement mortar 1:4 finished the surfaces fair and even without using extra cement , complete all as specified and directed by Engineer-in-Charge. | 119 | SQUARE METRE | 160 ₹19,040 | 150 ₹17,850 Lowest | 160 ₹19,040 | 150 ₹17,850 Lowest | 160 ₹19,040 | 150 ₹17,850 Lowest |
| 6.00 | Rendering 15 mm thick on brick work or concrete surfaces in cement mortar 1:4 finished the surfaces fair and even without using extra cement in and including taking down cement plaster on brick walls & concrete surfaces & the like including raking out joints, hacking for key, scrubbing down with water etc., any description, and removing of rubbish outside MoD land , complete all as specified and directed by Engineer-in-Charge. | 300 | SQUARE METRE | 180 ₹54,000 | 150 ₹45,000 Lowest | 160 ₹48,000 | 175 ₹52,500 | 160 ₹48,000 | 170 ₹51,000 |
| 7.00 | Rendering 15 mm thick on brick work or concrete surfaces in cement mortar 1:6 finished even and smooth without using extra cement , complete all as specified and directed by Engineer-in-Charge. | 10 | SQUARE METRE | 150 ₹1,500 | 170 ₹1,700 | 150 ₹1,500 | 140 ₹1,400 Lowest | 150 ₹1,500 | 160 ₹1,600 |
| 8.00 | Rendering 15 mm thick on brick work or concrete surfaces in cement mortar 1:6 finished even and smooth without using extra cement in and including taking down cement plaster on brick walls & concrete surfaces & the like including raking out joints, hacking for key, scrubbing down with water etc., any description, and removal of rubbish outside MoD land , complete all as specified and directed by Engineer-in-Charge. | 200 | SQUARE METRE | 180 ₹36,000 | 180 ₹36,000 | 150 ₹30,000 | 170 ₹34,000 | 140 ₹28,000 Lowest | 170 ₹34,000 |
| 9.00 | Rendering 10 mm thick in cement mortar (1:3), as on concrete surfaces (such as top & bottom of chajjas, beams, balcony ceiling ,roof slab ceiling etc.) finished the surfcae even and smooth without using extra cement in and including taking down cement plaster on brick walls & concrete surfaces & the like including raking out joints, hacking for key, scrubbing down with water etc., any description, and removing of rubbish outside MoD land , complete all as specified and directed by Engineer-in-Charge.
Notes for item No. 05 to 09: (i).Quoted rate shall be deemed to include for necessary scaffolding for building upto triple storey hight.
(ii) No extra payment made to contractor for work in small patches as required at site/as directed.
(iii) All safety measures for the safety of workers shall be ensured by contractor before execution of work. Insurance of workers shall be got done by contractor before execution of the work and the cost for the same shall be deemed to be included in rate quoted by contractor. | 30 | SQUARE METRE | 300 ₹9,000 | 250 ₹7,500 | 250 ₹7,500 | 200 ₹6,000 Lowest | 200 ₹6,000 Lowest | 270 ₹8,100 |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
17 Oct 2025, 6:00 pmClosed
GE (AF) Chandigarh
GE (AF) Chandigarh, Air Force Station Chandigarh-160003
REPAIR TO JOINERY, PLASTER WORK, TILING, PLUMBING, FLOORING, PLINTH PROTECTION WORKS AT SECTOR 28 AND 47 CHANDIGARH UNDER GE (AF) CHANDIGARH.
2025_MES_731548_1
GE (AF)/CHD/T-47/2025-26
Open Tender
Civil Works
Item Rate
183 days
Chandigarh
Please refer Tender documents.
10 documents required · 10 mandatory
₹500
GE (AF) Chandigarh
₹60,000
Yes
11 Dec 2025
18 Sept 2025
24 Oct 2025
18 Sept 2025
17 Oct 2025
3 Oct 2025
18 Sept 2025 - 25 Sept 2025
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
0.48 MB
Tender Documents
Tender Documents • 1.55 MB
BOQ
BOQ • 3.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .