Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 CrAdmitted-Finance | ₹2.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.0 Cr+₹39.5 L (15.2%)Admitted-Finance PLOT NO 13 II ND CROSS STREET RAMESH NAGAR VALASARAVAKKAM CHENNAI 600 087 | CHENNAI | CHENNAI | TAMIL NADU | 600087 | ₹3.0 Cr+₹39.5 L (15.2%) | L2 | Admitted-Finance |
| 3 | L3₹3.2 Cr+₹58.2 L (22.3%)Admitted-Finance | ₹3.2 Cr+₹58.2 L (22.3%) | L3 | Admitted-Finance |
| 4 | L4₹3.7 Cr+₹1.1 Cr (40.6%)Admitted-Finance | ₹3.7 Cr+₹1.1 Cr (40.6%) | L4 | Admitted-Finance |
| 5 | L5₹3.7 Cr+₹1.1 Cr (41.2%)Admitted-Finance MIG 354 4TH CROSS STREET MOGAPPAIR ERI SCHEME CHENNAI 37 | CHENNAI | ₹3.7 Cr+₹1.1 Cr (41.2%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Dillibabu L1 | K S CONSTRUCTION L2 | A.H.CONSTRUCTIONS L3 | Ashok.S L4 | ULTRAPOWER BUILDERS L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Supplying and filling in low lying area with gravel including cost of gravel with JCB/other machineries, consolidation and with power roller including cost of all labour charges including initial lead lift, etc., complete | 5,994 | cum | - | - | - | - | - |
| 2.00 | Supplying and spreading of quarry dust for yard area including cost of quarry dust, labour for consolidation, lead, lift, etc. complete. | 2,997 | cum | - | - | - | - | - |
| 3.00 | Supplying and spreading of machine Broken 20mm HBG metal inclduing cost of all materials, labour, lead, lift etc., complete for yard levelling to a thickness of 250mm and as directed by the Dept. Engineer at site. | 2,997 | cum | - | - | - | - | - |
| 4.00 | Earth work excavation for foundation including all labour charges including initial lead, lift, etc. complete. | 2,122 | cum | - | - | - | - | - |
| 5.00 | Supply and filling river sand for foundation and basement including watering and consolidation in 15 cm layers including cost sand all labour lead lift etc complete. | 153 | cum | - | - | - | - | - |
| 6.00 | Plain cement concrete 1:3:6, using 20 mm HBG metal for foundation without formwork including cost of cement, all materials, labour, lead, lift, etc. complete. | 271 | cum | - | - | - | - | - |
| 7.00 | RCC 1:1.5:3 mix using 12-20mm graded hard machine broken granite stone, for columns including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. ( excluding cost of steel reinforcement. ) with form work for raft | 530 | cum | - | - | - | - | - |
| 8.00 | Plain cement concrete 1:2:4 using 12 to 20mm HBG machine crushed metal without form work including cost of all materials, cement, all labour, lead, lift, etc. complete. Without form work | 153 | cum | - | - | - | - | - |
| 9.00 | RCC 1:1.5:3 mix using 12-20mm graded hard machine broken granite stone, for columns including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. ( excluding cost of steel reinforcement. ) with form work RCC side wall and oil sump | 169 | cum | - | - | - | - | - |
| 10.00 | RCC 1:1.5:3 mix using 12-20mm graded hard machine broken granite stone, for columns including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. ( excluding cost of steel reinforcement. ) with form work Cover slab | 279.5 | cum | - | - | - | - | - |
Tender Value
₹3.0 Cr
EMD Value
₹3.0 L
Closing Date
19 Dec 2019, 2:30 pmClosed
CE/TP-I/CHN
A-10, Thiru-Vi-Ka Indl Estate, Guindy, Chennai-32
Supplying and filling with gravel, spreading of quarry dust, metal spreading and construction of cable duct for the proposed Vembakkam 230/110 KV SS in the premises of the existing Vembakkam 110 KV SS.
2019_EB_148877_1
TP1-074/2019-20
Open Tender
Civil Works
Works
120 days
Vembakkam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3.0 L
Yes
23 Jan 2020
25 Nov 2019
20 Dec 2019
25 Nov 2019
19 Dec 2019
25 Nov 2019
Amount
Supplying and filling in low lying area with gravel including cost of gravel with JCB/other machineries, consolidation and with power roller including cost of all labour charges including initial lead lift, etc., complete
Supplying and spreading of quarry dust for yard area including cost of quarry dust, labour for consolidation, lead, lift, etc. complete.
Supplying and spreading of machine Broken 20mm HBG metal inclduing cost of all materials, labour, lead, lift etc., complete for yard levelling to a thickness of 250mm and as directed by the Dept. Engineer at site.
Earth work excavation for foundation including all labour charges including initial lead, lift, etc. complete.
Supply and filling river sand for foundation and basement including watering and consolidation in 15 cm layers including cost sand all labour lead lift etc complete.
Plain cement concrete 1:3:6, using 20 mm HBG metal for foundation without formwork including cost of cement, all materials, labour, lead, lift, etc. complete.
RCC 1:1.5:3 mix using 12-20mm graded hard machine broken granite stone, for columns including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. ( excluding cost of steel reinforcement. ) with form work for raft
Plain cement concrete 1:2:4 using 12 to 20mm HBG machine crushed metal without form work including cost of all materials, cement, all labour, lead, lift, etc. complete. Without form work
RCC 1:1.5:3 mix using 12-20mm graded hard machine broken granite stone, for columns including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. ( excluding cost of steel reinforcement. ) with form work RCC side wall and oil sump
RCC 1:1.5:3 mix using 12-20mm graded hard machine broken granite stone, for columns including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. ( excluding cost of steel reinforcement. ) with form work Cover slab
Providing steel reinforcement for RCC works including cost of steel rod binding wire and placing in postion of the steel reinforcement all materials, lead and lift etc., complete.
Brick work in CM 1:5 using II class chamber burnt bricks for basement & superstructure including cost of all materials, all labour lead lift etc ., complete. super structure, including cost of all materials, all labour charges, lead, lift, etc. complete.
Supplying and fixing of 65x65x6mm GI angle for cable duct including cost of all materials, labour, lead, lift, etc., complete and as directed by the Department Engineer at site.
Plastering with cm 1:3, 12mm thick including cost of cement, all materials,curing, labour, lead and lift etc., complete.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
K S CONSTRUCTION
A.H.CONSTRUCTIONS
Ashok.S
ULTRAPOWER BUILDERS
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
BOQ_179316.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .