Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
29 Aug 2022, 2:00 pmClosed
SE/GCC/Madurai
SE/GCC/MADURAI
Construction of fire protection wall in transformer yard of the existing Paramakudi 110 KV SS
2022_EB_248310_1
SE/GCC/MDU Specn.No.030/2022-23
Limited
Civil Works
Works
180 days
K. Pudur, Madurai-7
Please refer Tender documents.
2 documents required · 2 mandatory
₹250
Yes
The Superintending Engineer/GCC/Madurai
₹5,000
Yes
16 Sept 2022
23 Aug 2022
30 Aug 2022
23 Aug 2022
29 Aug 2022
23 Aug 2022
Amount
Earth work excavation for foundation in hard stiff clay, stiff black cotton hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders with an initial lead, lift, etc, complete.
Supplying and filling of M sand in foundation and basement with well water and consolidation as per specn.incliding cost of all materials labour, lead, lift, etc., complete.
PCC 1:3:6 mix using 40mm HBS machine crushed metal for foundation with out formwork including cost of all labour, materials, lead, lift, curing, etc., complete.
RCC M25 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement.For Column Footing concrete. & Raft
RCC M25 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For column concrete.
RCC M25 mix using 12mm to 20mm HBS metal (machine crushed) for Grade beam with form work including cost of cement all labour, materials, lead, lift etc. complete.
Brickwork in CM 1:5 mix using II class chamber brick of size 9"x 4 3/8" x 2 3/4" for bath, fol, brick on edge, partition wall, superstructure including cost of labour materials, curing, lead, lift, etc., complete.
Supplying and fabricating and placing in position of MS / RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete.
Plastering with CM. 1:3 mix 12mm thick for ceiling,fol, bath, rcc pillars, sunshade, loft, etc., including cost of materials, labour, lead, lift, watering, curing, etc., complete.
Colour washing two coats with exterior emulsion paint over one coat of white cement primer for outside wall including cost of all materials, labour, lead, lift etc complete.
SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .