Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Rejected-Technical R O WARD NO 03 KATHUA DISTRICT KATHUA | Rejected-Technical Due to less amount of Tender fee |
Tender Value
Refer Docs
Closing Date
10 Mar 2021, 4:00 pmClosed
Er.Rajesh Sumbria
Executive Engineer PWD R and B Division Basohli
Please refer in BOQ
2021_PWDJK_118912_4
e-NIT No.69 of 2020-21 dated 01-03-2021.
Open Tender
Civil Works
Item Rate
90 days
Basohli
Please refer in SBD
5 documents required · 5 mandatory
₹600
Yes
Executive Engineer PWD R and B Division Basohli
Exempted
Executive Engineer PWD R and B Division Basohli
15 Mar 2021
2 Mar 2021
12 Mar 2021
3 Mar 2021
10 Mar 2021
5 Mar 2021
4 Mar 2021
Amount
Demolishing RCC work manually / by mechanical means including stacking of steel bar and disposal of un-serviceable material as per direction of Engineer-in-charge including all leads and lift.
Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material as per direction of Engineer-in-charge including all leads and lift. a) In cement mortar.
Brick work with common burnt clay (non modular) bricks of class designation 7.5 in foundation and plinth including curing in cement mortar 1:6 (1 cement:6 coarse sand) (including all leads and lifts carriages of material by MT/HL).
Extra for brick work with common burnt clay bricks / cement concrete bricks in superstructure above plinth level upto floor five level (including all leads and lifts carriages of material by MT/HL).
Extra for brick work in: a) Square or rectangular pillars (including all leads and lifts carriages of material by MT/HL).
Half brick masonry with common burnt clay (non modular) bricks of class designation 7.5 in foundation and plinth including curing in cement mortar 1:4 (1 cement:4 coarse sand) (including all leads and lifts carriages of material by MT/HL).
Extra for half brick masonry in superstructure, above floor V level for every four floors or part thereof by mechanical means (including all leads and lifts carriages of material by MT/HL).
Repairs to plaster of thickness 12mm to 20mm in patches of area 2.5 sq. meters and under, including cutting the patch in proper shape raking out joints and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground, including all leads and lift. a) With cement mortar 1:4 (1 cement:4 fine sand) (including all leads and lifts carriages of material by MT/HL).
12mm cement plaster of mix. 1:4 (1 cement:4 coarse sand) (including all leads and lifts carriages of material by MT/HL).
Providing and laying in position of cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: a) 1:3:6 (1 cement:3 coarse sand:6 crushed stone aggregate 20mm nominal size) (including all leads and lifts carriages of material by MT/HL).
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level. a) 1:1.5:3 (1 cement:1.5 coarse sand:3 graded stone aggregate 20mm nominal size) (including all leads and lifts carriages of material by MT/HL).
Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. a) Cold twisted bars.
Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface.
Providing and applying white cement based putty of specified thickness, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. a) 1mm thick.
Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @ 3.84 kg/ 10sqm).
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete welded.
Dismantling old fixd grill and refixed in the same location after raising the compound wall.
Painting with black anti-corrosive bitumastic paint of approved brand and manufacture to give an even shade on new work Two or more coats.
Carriage of the following materials by Mechanical Transport from source to site of work incl. loading, unloading and stacking complete : a) Sand from Billawar crusher for an average lead of 5.00 Km. by M.T. b) Stone aggregate (Crusher bajree) below 20mm nominal size from Billawar crusher for an average lead of 5.00 Km. c) Bricks from Hiranagar for an av. lead of 65.00 km. by M.T.
Pritam Singh
Swarn Singh
Raman Kuma
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .