| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.3 LAccepted-AOC CHENNAI | CHENNAI | TAMIL NADU | 600001 | ₹13.3 L | L1 | Accepted-AOC low quoted |
| 2 | Rejected-Technical | - | - | Rejected-Technical low quote bidder was accepted |
| 3 | Rejected-Technical | - | - | Rejected-Technical low quote bidder was accepted |
| 4 | Rejected-Technical | - | - | Rejected-Technical low quote bidder was accepted |
| Sl No | Description | Qty | Unit | selva L3 | SATHISVEL L2 | Y S R CONSTRUCTION L4 | R JAYARAMAN L1 |
|---|---|---|---|---|---|---|---|
| 1.00CONSTRUCTION OF ANGANWADI CENTER IN NAINARPETTAI VILLAGE IN KALIYANDUR NAINARPETTAI PANCHAYAT | |||||||
| 2.00 | Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete., | 25.57 | cum | 237.14 ₹6,063.67 | 200 ₹5,114 | 220 ₹5,625.40 | 207.08 ₹5,295.04 |
| 3.00 | Sand filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard speecifications | 2.28 | cum | 2,034.6 ₹4,638.89 | 4,500 ₹10,260 | 1,400 ₹3,192 | 1,553.18 ₹3,541.25 |
| 4.00 | Cement concrete 1:4:8 mix usin 40 mm HBG metal inculding cost and coveyance of all materials to site including labour for mixing laying,curing etc complete. | 9.3 | cum | 5,550.35 ₹51,618.26 | 4,500 ₹41,850 | 3,200 ₹29,760 | 4,646.59 ₹43,213.29 |
| 5.00 | Collection and supply of Gravel and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications | 17.72 | sqm | 601.24 ₹10,653.97 | 2,300 ₹40,756 | 3,200 ₹56,704 | 339.03 ₹6,007.61 |
| 6.00 | Brickwork in Cement mortar 1 : 5 mix using new II class bricks including cost and conveyance of all materials to site and labour charges etc complete. | 30.31 | sqm | 5,613.09 ₹1.7 L | 3,200 ₹96,992 | 3,980 ₹1.2 L | 5,045.31 ₹1.5 L |
| 7.00 | RCC 1:1.5:3 mix using 20mm HBG Metal including all labor charges etc complete | 22.54 | sqm | 8,820.48 ₹2.0 L | 4,500 ₹1.0 L | 5,205 ₹1.2 L | 7,832.34 ₹1.8 L |
| 8.00 | Supplying&fabrication of steel including all labor charges etc complete | 2,568 | sqm | 82.67 ₹2.1 L | 225 ₹5.8 L | 120 ₹3.1 L | 75.53 ₹1.9 L |
| 9.00Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., | |||||||
| 10.00 | Column post | 44.25 | sqm | 492.21 ₹21,780.29 | 400 ₹17,700 | 454 ₹20,089.50 | 867.72 ₹38,396.61 |
Tender Value
₹17.3 L
EMD Value
₹17,250
Closing Date
26 Feb 2026, 3:00 pmClosed
BDO BP
union office thiruppuvanam
construction of anganwadi center at nainarpettai in kaliyandhur nainarpettai village panchayat
2026_RDTN_656784_1
2025-26 anganwadi nainarpettai
Open Tender
Civil Works
180 days
union office thiruppuvanam
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹17,250
12 Mar 2026
14 Feb 2026
26 Feb 2026
14 Feb 2026
26 Feb 2026
14 Feb 2026
CONSTRUCTION OF ANGANWADI CENTER IN NAINARPETTAI VILLAGE IN KALIYANDUR NAINARPETTAI PANCHAYAT
Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,
Sand filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 mix usin 40 mm HBG metal inculding cost and coveyance of all materials to site including labour for mixing laying,curing etc complete.
Collection and supply of Gravel and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Brickwork in Cement mortar 1 : 5 mix using new II class bricks including cost and conveyance of all materials to site and labour charges etc complete.
RCC 1:1.5:3 mix using 20mm HBG Metal including all labor charges etc complete
Supplying&fabrication of steel including all labor charges etc complete
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Column post
GRADE beam
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Plastering with Cement putty finish inculding cost and conveyance of all materials to site and labour charges for curing etc
Weathering course with broken brick jelly for 20 mm size mixed with pure slacked lime (no sand to be used) in proposation of 32:12.5 cft to proper gradient,well beation with wooden beaters etc
Terrace flooring with one coarce of old &new machine pressed tiles of size 20x20x2 mmusing Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same
Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
Dadooing of walls with colour glazed tiles of size 300x200x6 mm of best quality including cost and conveyance of all materials to site and all labour charges etc complete.
Cement concrete 1:2:4 mix usin 20 mm HBG metal inculding cost and coveyance of all materials to site including labour for mixing laying,curing etc complete.
Fabrication and supply of mild steel Door including all labour charges etc complete.
Fabrication and supply of mild steel Door including all labour charges etc complete.
Fabrication and supply of mild steel Door including all labour charges etc complete.
window
ventilator
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior emulsion paint two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete ( outer wall )
Painting with Enamel paint two coat of new iron works such as steel Doors ,windows ,ventilators, etc., with best approved first quality of synthetic enamel paint of approved colour over the existing priming coats,ete.
Light point SD 25
Fan point SD 25
Fan SOR SD 107
Plug point SD 38
CFL lamp-BH fitting SD 80
DPIC swtich of 500 V SD 154
G I Pipe (40mm)
Service Wire SD 64
Exhaust fan SD 114
Bulk head fitting SD 83
pvc water tank 1000 lit
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_787621.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.35 MB
BOQ_787621.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid