Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.6 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.8 L+₹17,901.84 (6.93%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.8 L+₹19,304.80 (7.47%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | Rejected-Technical | - | Rejected-Technical OK |
Tender Value
₹2.8 L
EMD Value
₹28,060
Closing Date
28 Feb 2026, 12:00 pmClosed
CHIEF ENGINEER
NAGAR NIGAM AGRA
Installation of a signboard depicting the Buddha history at Buddha Park.
2026_DOLBU_1116085_1
14-02-2026/NAGAR NIGAM AGRA/28-02-2026/02
Open Tender
Construction Works
Percentage
30 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹236
NAGAR NIGAM
₹28,060
6 Mar 2026
14 Feb 2026
28 Feb 2026
14 Feb 2026
28 Feb 2026
14 Feb 2026
Providing and fixing engraved granite description tablet size 1.5 m × 1.5 m, 40–50 mm thick, tilt shape mounted on 1.5 m height structure, including letter engraving, polishing, decorative granite packing, MS support frame, anchoring, grouting and fixing complete.
Earth work in Excavation in foundation in ordinary soil (loam, clay or sand) including, lift up to 1.50 m and lead up to 30m and including filling watering and ramming of excavated the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge up to a distance of 30 M form the foundation trenches. (Rate including Royalty of earth also) (4-Chapter Si.No.1)
Class-150 (Non Modulao brick work in 1 :4 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for propercompletion of the work(Ch-6 SI No- 2)
RCC work Providing and laying in position specified grade of reinforced cement concrete,Slab including the cost of centering, shutterang, finishing and excluding reinforcement - Above plinth level upto fifth floor lable : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone
RCC work Providing and laying in position specified grade of reinforced cement concrete , including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth leuel:1:2:4 in raft foundation (1cement: 2 coarse sand :4 graded stone aggregate 20 mm nominal size)
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in and an overall rates) brought for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level. (b) 10mm to 12mm tor. (Chapter No. 10 S.I. No. 504(B))
Sub Total
Add/Deduction Rs. For Estimate Figure Amount Match
Grand Total
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.96 MB
BOQ_2071840.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .