Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹87,250
Closing Date
19 Feb 2026, 12:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Single Packet
Normal Tender
No
Not Applicable
Itemwise/Consigneewise
Lowest to Highest
TPI Agency
Not Applicable
90 days
Expenditure
General
94
4 conditions · 1 needing a document upload
1.a) BULK ORDER: Bulk Order (Bulk Order is defined as minimum 80 % of net procurable quantity in a tender) shall be ordered on established sources having proven past supply performance as define below. For placement of bulk quantity order, the manufacturer firm must have successfully supplied minimum 20 % of the tendered quantity of the tendered item in a single purchase order or contract of Zonal Railways/ PUs/CORE/Govt. Department/PSUs during the period of three previous completed financial year and current financial year up to date of tender Closing. Successful supply shall mean acceptance of supply by consignee i.e. Consignee Receipt & Acceptance Certificate(CRAC) or Consignee Receipt Note (CRN) or R - N ote or Supply Performance issued by Gazetted Officer of consignee (Completion report) along with offer. 1(b)DEVELOPMENTAL ORDER ON THE BASIS OF PAST PERFORMANCE: If such past supply performance level is lower than as required for bulk order (i.e. minimum 20 %), then the offer may be considered for placement of developmental order not exceeding to 20% of the net procurable quantity. For establishing above past Supply Performance 1a & 1b above), firms should submit documentary evidence certifying proof of supply performance, which shall be scanned copies of receipt notes or inspection certificates along with self-declaration by the bidder that supply has been accepted by consignee, Furnishing of false declaration shall render termination of contract and further action as per terms and conditions of contract or Consignee Receipt & Acceptance Certificate(CRAC) or Consignee Receipt Note (CRN) or R-Note or Supply Performance issued by Gazetted Officer of consignee (Completion report) along with offer. 1(c) DEVELOPMENTAL ORDER ON THE BASIS OF OTHER CREDENTIALS: The tenderer who have no past performance as above may also be considered for such developmental order not exceeding 20 % of the net procurable quantity), but for consideration of such offers, Tenderers must be able to demonstrate their Capacity-cum-Capability to manufacture the tendered item. For this, tenderer must submit the details of M&P, testing facility, QAP and ISO 9000 /14000 / 18000 certificates if available, technical manpower available with them registration with other Government agencies or PSUs etc. or any other details as may be warranted as per the technical specification and drawing. Tenderers are to note that non submission of the documents to establish their eligibility for (1a) or (1b) or (1c) shall be taken as they are not having any such documents. Their offer shall be considered based on whatever documents are submitted by them with the offer and no back reference in this regard will be made to them.
Place of Inspection: - Tenderer should mention in their offer: - 1. Name of manufacture with complete address. 2. Place of inspection be indicated with complete address, option for inspections at go downs/outstation/multiple places be strictly avoided, and preferably be permitted only at manufacturers place.
ONUS OF SUBMISSION OF REQUISITE DOCUMENTS: The onus of submission of requisite documents as given above for establishing their eligibility for bulk or developmental order lies with the tenderer.Tenderers are to note that non submission of the documents as detailed above shall be taken as they are not having any such documents. In such case their offer shall be considered based on iMMS. No back reference in this regard will be made to them.
Tender Specific Authorization : OEM authorization Preferably manufacturers should participate. Participating traders/ agents must attach authorization letter issued by the original manufacturer or their authorized stockiest/ distributor/ importer along with their offer. Authorization letter should preferably be tender specific. In case of a general authorization letter, it must clearly indicate the validity period/ expiry date. Offers with general authorization letters silent on validity period/ expiry date will not be considered for placement of order. The tenderer must also attach documentary proof issued to the stockiest/ distributor/ importer by the original manufacturer. Else, offers will not be considered.
29 conditions
Code of Integrity, Misdemeanor and Penalties :- I/We have carefully gone through the IRS conditions of contract(included and uploaded along with the bid document) particularly Para 2500 pertaining to "Code of Integrity, Misdemeanor and Penalties". I/We hereby certify that none of our sister concern or affiliates (such as having common partner/director/promoter/owner/holding company decision control etc.) have participated in this tender which can give rise to a conflict of interest or fall under anti- competitive practices. We understand that the offers of all such sister concern or affiliates including ours are liable to be rejected as per relevant provisions of IRS terms and conditions. I/We, affirm that we shall abide by the Code on Integrity in general, with specific reference to conflict of interest [Para 2502(e)], anti competitive practices[Para 2502(c)], and obligation to proactive disclosures [Para 2503]. I/We understand that we are fully responsible for the above declaration and it shall not be the Railway's responsibility to verify the same. I/We are aware that we shall be liable for all consequences of violation Code of Integrity, if detected, at any stage. (Note :- May confirm as Yes, to certify all the above certification.)
In case your confirmation in commercial compliance regarding Code of Integrity , Misdemeanor and Penalties is "No", then provide/upload the names and addresses of your sister concerns or affiliates.
IN CASE BIDDER IS INDIAN FIRM OR FROM A COUNTRY THAT DOES NOT SHARE LAND BORDER WITH INDIA, SHALL CONFIRM AS UNDER:- I have read the clauses regarding restrictions on procurement from a bidder of a country which shares a land border with India as per Annexure F of WCRs e-TENDER DOCUMENT FOR SUPPLY CONTRACTS (Ver. 7.0, applicable w.e.f. 31.10.2022) with Ministry of Finance Order (Public Procurement No. 4), F. No. 7/10/2021-PPD(1) dated 23/02/2023 circulated vide OM No. F.7/10/2021-PPD dated 23.2.2023 (copy enclosed as enclosed document) ; I certify that this bidder (in whose behalf I am submitting this bid) is not from such a country which shares a land border with India (Note:- Indian firms and firms from countries not sharing border with India, may please confirm as YES).
IN CASE BIDDER FIRM IS FROM A FOREIGN COUNTRY THAT SHARES LAND BORDER WITH INDIA, SHALL SUBMIT CERTIFICATE AS UNDER:- I certify that this bidder (in whose behalf I am submitting this bid) is from such a country which shares a land border with India with regard to contents of Annexure F of WCRs e-TENDER DOCUMENT FOR SUPPLY CONTRACTS (Ver. 7.0, applicable w.e.f. 31.10.2022) with Ministry of Finance Order (Public Procurement No. 4), F. No. 7/10/2021- PPD(1) dated 23/02/2023 circulated vide OM No. F.7/10/2021-PPD dated 23.2.2023; and I further certify that this bidder has been registered with the Competent Authority. I hereby further certify that this bidder fulfills all requirements in this regard and is eligible to be considered. (Note 1; WHEREVER A BIDDER FROM SUCH A FOREIGN COUNTRY THAT SHARES BORDER WITH INDIA QUOTES, HE WILL NEED TO UPLOAD A COPY OF VALID REGISTRATION BY THE COMPETENT AUTHORITY (OR DOCUMENTARY EVIDENCE OF EXEMPTION AS PER NOTE 2 BELOW) WITHOUT WHICH THE OFFER SHALL BE SUMMARILY REJECTED.) (NOTE 2: Restrictions under this rule shall not apply to bids from such countries (even if sharing a land border in India) to which the government of India has extended lines of credit or in which the government of India is engaged in developmental projects. For updated lists of credit or in which line of credits have been extended or in which developmental projects are undertaken are given in the website of the Ministry of External affairs and in such firm will need to submit such documentary evidence.) The terms 'bidder' and 'bidder from a country which shares a land with India' shall be as defined in para II and III respectively of Annex III of Ministry of Finance Order (Public Procurement No. 4), F. No. 7/10/2021-PPD(1) dated 23/02/2023 circulated vide OM No. F.7/10/2021-PPD dated 23.2.2023.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
TPI.
1. It shall be the responsibility of the bidder to ensure that they quoted correct GST rate and HSN number. 2. Purchaser shall not be responsible for any misclassification of HSN code or incorrect GST rate.
1 condition
Code of Integrity, Misdemeanor and Penalties :- Bidders are reminded to carefully go through the IRS conditions of contract (included and uploaded with the bid document) particularly Para 2500 pertaining to "Code of Integrity, Misdemeanor and Penalties". Bidders shall certify that none of their sister concern or affiliates(such as having common partner/director/promoter/owner/holding company decision control etc.) have participated in this tender& which can give rise to a conflict of interest or fall under anti-competitive practices. The offers of such sister concern or affiliates if quoted are liable to be rejected as per relevant provisions of IRS terms and conditions. Bidders shall abide by the Code of Integrity in general, with specific reference to conflict of interest [Para25029(e)], anti competitive practices [Para 2502(c)] and obligations to proactive disclosures[Para 2503]. Bidders shall fully responsible for the declaration/certification regarding Code of Integrity, Misdemeanor and Penalties give in commercial compliance and it shall not be the Railways responsibility to verify the same. Bidders shall be liable for all consequences of violation of Code of Integrity (including termination of contract) as provisions in Para 2505 & 2506 of IRS conditions of contract, if detected, at any stage.
2 locations across Madhya Pradesh · 333 Numbers · 16 Set total
25 kV Earthing/Discharge Rod Assembly
94255247C
94255247C
Open - Indigenous
Goods
Katni, Madhya Pradesh
₹0
₹87,250
19 Feb 2026
20 Jan 2026
11 items · 333 Numbers · 16 Set total
25 kV Earthing/Discharge Rod Assembly For High Rise OHE with working Voltage 25 kV AC Tract ion with top clamp (suitable for 36 to 50 mm bus bar and also suitable for 10 to 20 mm dia. Conductor) . Pole made of cast resin or resin-bonded glass fibre, coated with three coats of poly- urethane, The discharge /earth ing pole assembly shall have an overall length of not less than 7.5 meters in five equal sections. Single core fl exible multi strand annealed copper cable should have double insulation, a cross section of 40 sq mm of size 248/0.45 mm and 14 meter long cable (Specification IS: 1554 (pt. I)- 1988 and IS 2071 (pt. 1 and III). With eart hing double Clamp Drg. No. ETI/OHE/SK/482 or latest (Each Discharge Rod is to be supplied with 02 nos. earti ng clamps), Insulated Tee Junction- Insulated Tee junction drg no. ETI/OHE/SK/481 and RE/33/P/530 or latest (t he cable should have an insulated tee junction and the tee clamp should be of brass covered in clamp casing o f ebonite material). And whole assembly to be supplied in rugged canvas bag and all shall be as per RDSO spe cification No. ETI/OHE/51 (9/87) with latest A and C slip no. 1 (10/92) or latest , and additional part required wi th each discharge rod to be supply. (1) 01 nos. insulated tee junction. (2) 01 nos. top clamp made of copper s uitable for 36 to 50 mm bus bar and also suitable 10 -20 mm dia conductor, (3) 01 nos. spare earthing clamp and. (4) special instruction- 1. Discharge rod cable lugs should be made of copper. 2. The cable should have d ouble insulation, a cross- section of 40 sq mm, and 248/0.45 mm strands. 3. The discharge rod should be stro ng enough to prevent swaying or breaking during maximum extension. Every nut and bolt used in the dischar ge rod must include a washer and spring washer to ensure secure fastening. 5. After the award of the P.O., th e firm must ensure approval of one sample of the discharge rod from the consignee before RITES Inspection. 6 . The length of cable from the earthing clamp to top clamp shall not be less than 12.5 mtr. In the cable an insu lated Tee junction shall be provided at a distance of about 3.5 mtr from the earthing clamp. From this insulate d tee junction another piece of cable not less than 1.50 m long shall be provided at the end of which other ear thing clamp shall be provided. 7. The galvanized steel tube (threaded) used for coupling of pieces of discharg e rod should be at least 20 cm or more as required to prevent swaying of pole assembly during erection at sit e. Also at every 5 cm apart two nos steel rivet is required to be provide on galvanized steel tube ( For preventi ng the galvanized steel tube from coming out from each discharge rod pole end). i.e. about 08 nos. or more st eel rivet as required per galvanized steel tube is to be provided for proper fastening of galvanized steel tube i nside the each pole of discharge rod. (Warranty period- 30 months after the date of delivery). [ Warranty Per iod: 30 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| SSE/TRD/KATNI MURWARA, WCR | Madhya Pradesh | 5.00 Numbers |
| Total | 5 Numbers | |
25 kV Earthing/Discharge Rod Assembly For High Rise OHE with working Voltage 25 kV AC Tract ion with top clamp (suitable for 36 to 50 mm bus bar and also suitable for 10 to 20 mm dia. Conductor) . Pole made of cast resin or resin-bonded glass fibre, coated with three coats of poly- urethane, The discharge /earth ing pole assembly shall have an overall length of not less than 7.5 meters in five equal sections. Single core fl exible multi strand annealed copper cable should have double insulation, a cross section of 40 sq mm of size 248/0.45 mm and 14 meter long cable (Specification IS: 1554 (pt. I)- 1988 and IS 2071 (pt. 1 and III). With eart hing double Clamp Drg. No. ETI/OHE/SK/482 or latest (Each Discharge Rod is to be supplied with 02 nos. earti ng clamps), Insulated Tee Junction- Insulated Tee junction drg no. ETI/OHE/SK/481 and RE/33/P/530 or latest (t he cable should have an insulated tee junction and the tee clamp should be of brass covered in clamp casing o f ebonite material). And whole assembly to be supplied in rugged canvas bag and all shall be as per RDSO spe cification No. ETI/OHE/51 (9/87) with latest A and C slip no. 1 (10/92) or latest , and additional part required wi th each discharge rod to be supply. (1) 01 nos. insulated tee junction. (2) 01 nos. top clamp made of copper s uitable for 36 to 50 mm bus bar and also suitable 10 -20 mm dia conductor, (3) 01 nos. spare earthing clamp and. (4) special instruction- 1. Discharge rod cable lugs should be made of copper. 2. The cable should have d ouble insulation, a cross- section of 40 sq mm, and 248/0.45 mm strands. 3. The discharge rod should be stro ng enough to prevent swaying or breaking during maximum extension. Every nut and bolt used in the dischar ge rod must include a washer and spring washer to ensure secure fastening. 5. After the award of the P.O., th e firm must ensure approval of one sample of the discharge rod from the consignee before RITES Inspection. 6 . The length of cable from the earthing clamp to top clamp shall not be less than 12.5 mtr. In the cable an insu lated Tee junction shall be provided at a distance of about 3.5 mtr from the earthing clamp. From this insulate d tee junction another piece of cable not less than 1.50 m long shall be provided at the end of which other ear thing clamp shall be provided. 7. The galvanized steel tube (threaded) used for coupling of pieces of discharg e rod should be at least 20 cm or more as required to prevent swaying of pole assembly during erection at sit e. Also at every 5 cm apart two nos steel rivet is required to be provide on galvanized steel tube ( For preventi ng the galvanized steel tube from coming out from each discharge rod pole end). i.e. about 08 nos. or more st eel rivet as required per galvanized steel tube is to be provided for proper fastening of galvanized steel tube i nside the each pole of discharge rod. (Warranty period- 30 months after the date of delivery). [ Warranty Per iod: 30 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| SSE/TRD/KATNI MURWARA, WCR | Madhya Pradesh | 61.00 Numbers |
| Total | 61 Numbers | |
25 kV Earthing/Discharge Rod Assembly For High Rise OHE with working Voltage 25 kV AC Tract ion with top clamp (suitable for 36 to 50 mm bus bar and also suitable for 10 to 20 mm dia. Conductor) . Pole made of cast resin or resin-bonded glass fibre, coated with three coats of poly- urethane, The discharge /earth ing pole assembly shall have an overall length of not less than 7.5 meters in five equal sections. Single core fl exible multi strand annealed copper cable should have double insulation, a cross section of 40 sq mm of size 248/0.45 mm and 14 meter long cable (Specification IS: 1554 (pt. I)- 1988 and IS 2071 (pt. 1 and III). With eart hing double Clamp Drg. No. ETI/OHE/SK/482 or latest (Each Discharge Rod is to be supplied with 02 nos. earti ng clamps), Insulated Tee Junction- Insulated Tee junction drg no. ETI/OHE/SK/481 and RE/33/P/530 or latest (t he cable should have an insulated tee junction and the tee clamp should be of brass covered in clamp casing o f ebonite material). And whole assembly to be supplied in rugged canvas bag and all shall be as per RDSO spe cification No. ETI/OHE/51 (9/87) with latest A and C slip no. 1 (10/92) or latest , and additional part required wi th each discharge rod to be supply. (1) 01 nos. insulated tee junction. (2) 01 nos. top clamp made of copper s uitable for 36 to 50 mm bus bar and also suitable 10 -20 mm dia conductor, (3) 01 nos. spare earthing clamp and. (4) special instruction- 1. Discharge rod cable lugs should be made of copper. 2. The cable should have d ouble insulation, a cross- section of 40 sq mm, and 248/0.45 mm strands. 3. The discharge rod should be stro ng enough to prevent swaying or breaking during maximum extension. Every nut and bolt used in the dischar ge rod must include a washer and spring washer to ensure secure fastening. 5. After the award of the P.O., th e firm must ensure approval of one sample of the discharge rod from the consignee before RITES Inspection. 6 . The length of cable from the earthing clamp to top clamp shall not be less than 12.5 mtr. In the cable an insu lated Tee junction shall be provided at a distance of about 3.5 mtr from the earthing clamp. From this insulate d tee junction another piece of cable not less than 1.50 m long shall be provided at the end of which other ear thing clamp shall be provided. 7. The galvanized steel tube (threaded) used for coupling of pieces of discharg e rod should be at least 20 cm or more as required to prevent swaying of pole assembly during erection at sit e. Also at every 5 cm apart two nos steel rivet is required to be provide on galvanized steel tube ( For preventi ng the galvanized steel tube from coming out from each discharge rod pole end). i.e. about 08 nos. or more st eel rivet as required per galvanized steel tube is to be provided for proper fastening of galvanized steel tube i nside the each pole of discharge rod. (Warranty period- 30 months after the date of delivery). [ Warranty Per iod: 30 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| SSE/TRD/KATNI MURWARA, WCR | Madhya Pradesh | 53.00 Numbers |
| Total | 53 Numbers | |
25 kV Earthing/Discharge Rod Assembly For High Rise OHE with working Voltage 25 kV AC Tract ion with top clamp (suitable for 36 to 50 mm bus bar and also suitable for 10 to 20 mm dia. Conductor) . Pole made of cast resin or resin-bonded glass fibre, coated with three coats of poly- urethane, The discharge /earth ing pole assembly shall have an overall length of not less than 7.5 meters in five equal sections. Single core fl exible multi strand annealed copper cable should have double insulation, a cross section of 40 sq mm of size 248/0.45 mm and 14 meter long cable (Specification IS: 1554 (pt. I)- 1988 and IS 2071 (pt. 1 and III). With eart hing double Clamp Drg. No. ETI/OHE/SK/482 or latest (Each Discharge Rod is to be supplied with 02 nos. earti ng clamps), Insulated Tee Junction- Insulated Tee junction drg no. ETI/OHE/SK/481 and RE/33/P/530 or latest (t he cable should have an insulated tee junction and the tee clamp should be of brass covered in clamp casing o f ebonite material). And whole assembly to be supplied in rugged canvas bag and all shall be as per RDSO spe cification No. ETI/OHE/51 (9/87) with latest A and C slip no. 1 (10/92) or latest , and additional part required wi th each discharge rod to be supply. (1) 01 nos. insulated tee junction. (2) 01 nos. top clamp made of copper s uitable for 36 to 50 mm bus bar and also suitable 10 -20 mm dia conductor, (3) 01 nos. spare earthing clamp and. (4) special instruction- 1. Discharge rod cable lugs should be made of copper. 2. The cable should have d ouble insulation, a cross- section of 40 sq mm, and 248/0.45 mm strands. 3. The discharge rod should be stro ng enough to prevent swaying or breaking during maximum extension. Every nut and bolt used in the dischar ge rod must include a washer and spring washer to ensure secure fastening. 5. After the award of the P.O., th e firm must ensure approval of one sample of the discharge rod from the consignee before RITES Inspection. 6 . The length of cable from the earthing clamp to top clamp shall not be less than 12.5 mtr. In the cable an insu lated Tee junction shall be provided at a distance of about 3.5 mtr from the earthing clamp. From this insulate d tee junction another piece of cable not less than 1.50 m long shall be provided at the end of which other ear thing clamp shall be provided. 7. The galvanized steel tube (threaded) used for coupling of pieces of discharg e rod should be at least 20 cm or more as required to prevent swaying of pole assembly during erection at sit e. Also at every 5 cm apart two nos steel rivet is required to be provide on galvanized steel tube ( For preventi ng the galvanized steel tube from coming out from each discharge rod pole end). i.e. about 08 nos. or more st eel rivet as required per galvanized steel tube is to be provided for proper fastening of galvanized steel tube i nside the each pole of discharge rod. (Warranty period- 30 months after the date of delivery). [ Warranty Per iod: 30 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| SSE/TRD/KATNI MURWARA, WCR | Madhya Pradesh | 14.00 Numbers |
| Total | 14 Numbers | |
25 kV Earthing/Discharge Rod Assembly For High Rise OHE with working Voltage 25 kV AC Tract ion with top clamp (suitable for 36 to 50 mm bus bar and also suitable for 10 to 20 mm dia. Conductor) . Pole made of cast resin or resin-bonded glass fibre, coated with three coats of poly- urethane, The discharge /earth ing pole assembly shall have an overall length of not less than 7.5 meters in five equal sections. Single core fl exible multi strand annealed copper cable should have double insulation, a cross section of 40 sq mm of size 248/0.45 mm and 14 meter long cable (Specification IS: 1554 (pt. I)- 1988 and IS 2071 (pt. 1 and III). With eart hing double Clamp Drg. No. ETI/OHE/SK/482 or latest (Each Discharge Rod is to be supplied with 02 nos. earti ng clamps), Insulated Tee Junction- Insulated Tee junction drg no. ETI/OHE/SK/481 and RE/33/P/530 or latest (t he cable should have an insulated tee junction and the tee clamp should be of brass covered in clamp casing o f ebonite material). And whole assembly to be supplied in rugged canvas bag and all shall be as per RDSO spe cification No. ETI/OHE/51 (9/87) with latest A and C slip no. 1 (10/92) or latest , and additional part required wi th each discharge rod to be supply. (1) 01 nos. insulated tee junction. (2) 01 nos. top clamp made of copper s uitable for 36 to 50 mm bus bar and also suitable 10 -20 mm dia conductor, (3) 01 nos. spare earthing clamp and. (4) special instruction- 1. Discharge rod cable lugs should be made of copper. 2. The cable should have d ouble insulation, a cross- section of 40 sq mm, and 248/0.45 mm strands. 3. The discharge rod should be stro ng enough to prevent swaying or breaking during maximum extension. Every nut and bolt used in the dischar ge rod must include a washer and spring washer to ensure secure fastening. 5. After the award of the P.O., th e firm must ensure approval of one sample of the discharge rod from the consignee before RITES Inspection. 6 . The length of cable from the earthing clamp to top clamp shall not be less than 12.5 mtr. In the cable an insu lated Tee junction shall be provided at a distance of about 3.5 mtr from the earthing clamp. From this insulate d tee junction another piece of cable not less than 1.50 m long shall be provided at the end of which other ear thing clamp shall be provided. 7. The galvanized steel tube (threaded) used for coupling of pieces of discharg e rod should be at least 20 cm or more as required to prevent swaying of pole assembly during erection at sit e. Also at every 5 cm apart two nos steel rivet is required to be provide on galvanized steel tube ( For preventi ng the galvanized steel tube from coming out from each discharge rod pole end). i.e. about 08 nos. or more st eel rivet as required per galvanized steel tube is to be provided for proper fastening of galvanized steel tube i nside the each pole of discharge rod. (Warranty period- 30 months after the date of delivery). [ Warranty Per iod: 30 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| SSE/TRD/KATNI MURWARA, WCR | Madhya Pradesh | 10.00 Set |
| Total | 10 Set | |
25 kV Earthing/Discharge Rod Assembly For High Rise OHE with working Voltage 25 kV AC Tract ion with top clamp (suitable for 36 to 50 mm bus bar and also suitable for 10 to 20 mm dia. Conductor) . Pole made of cast resin or resin-bonded glass fibre, coated with three coats of poly- urethane, The discharge /earth ing pole assembly shall have an overall length of not less than 7.5 meters in five equal sections. Single core fl exible multi strand annealed copper cable should have double insulation, a cross section of 40 sq mm of size 248/0.45 mm and 14 meter long cable (Specification IS: 1554 (pt. I)- 1988 and IS 2071 (pt. 1 and III). With eart hing double Clamp Drg. No. ETI/OHE/SK/482 or latest (Each Discharge Rod is to be supplied with 02 nos. earti ng clamps), Insulated Tee Junction- Insulated Tee junction drg no. ETI/OHE/SK/481 and RE/33/P/530 or latest (t he cable should have an insulated tee junction and the tee clamp should be of brass covered in clamp casing o f ebonite material). And whole assembly to be supplied in rugged canvas bag and all shall be as per RDSO spe cification No. ETI/OHE/51 (9/87) with latest A and C slip no. 1 (10/92) or latest , and additional part required wi th each discharge rod to be supply. (1) 01 nos. insulated tee junction. (2) 01 nos. top clamp made of copper s uitable for 36 to 50 mm bus bar and also suitable 10 -20 mm dia conductor, (3) 01 nos. spare earthing clamp and. (4) special instruction- 1. Discharge rod cable lugs should be made of copper. 2. The cable should have d ouble insulation, a cross- section of 40 sq mm, and 248/0.45 mm strands. 3. The discharge rod should be stro ng enough to prevent swaying or breaking during maximum extension. Every nut and bolt used in the dischar ge rod must include a washer and spring washer to ensure secure fastening. 5. After the award of the P.O., th e firm must ensure approval of one sample of the discharge rod from the consignee before RITES Inspection. 6 . The length of cable from the earthing clamp to top clamp shall not be less than 12.5 mtr. In the cable an insu lated Tee junction shall be provided at a distance of about 3.5 mtr from the earthing clamp. From this insulate d tee junction another piece of cable not less than 1.50 m long shall be provided at the end of which other ear thing clamp shall be provided. 7. The galvanized steel tube (threaded) used for coupling of pieces of discharg e rod should be at least 20 cm or more as required to prevent swaying of pole assembly during erection at sit e. Also at every 5 cm apart two nos steel rivet is required to be provide on galvanized steel tube ( For preventi ng the galvanized steel tube from coming out from each discharge rod pole end). i.e. about 08 nos. or more st eel rivet as required per galvanized steel tube is to be provided for proper fastening of galvanized steel tube i nside the each pole of discharge rod. (Warranty period- 30 months after the date of delivery). [ Warranty Per iod: 30 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| SSE/TRD/KATNI MURWARA, WCR | Madhya Pradesh | 6.00 Numbers |
| Total | 6 Numbers | |
25 kV Earthing/Discharge Rod Assembly For High Rise OHE with working Voltage 25 kV AC Tract ion with top clamp (suitable for 36 to 50 mm bus bar and also suitable for 10 to 20 mm dia. Conductor) . Pole made of cast resin or resin-bonded glass fibre, coated with three coats of poly- urethane, The discharge /earth ing pole assembly shall have an overall length of not less than 7.5 meters in five equal sections. Single core fl exible multi strand annealed copper cable should have double insulation, a cross section of 40 sq mm of size 248/0.45 mm and 14 meter long cable (Specification IS: 1554 (pt. I)- 1988 and IS 2071 (pt. 1 and III). With eart hing double Clamp Drg. No. ETI/OHE/SK/482 or latest (Each Discharge Rod is to be supplied with 02 nos. earti ng clamps), Insulated Tee Junction- Insulated Tee junction drg no. ETI/OHE/SK/481 and RE/33/P/530 or latest (t he cable should have an insulated tee junction and the tee clamp should be of brass covered in clamp casing o f ebonite material). And whole assembly to be supplied in rugged canvas bag and all shall be as per RDSO spe cification No. ETI/OHE/51 (9/87) with latest A and C slip no. 1 (10/92) or latest , and additional part required wi th each discharge rod to be supply. (1) 01 nos. insulated tee junction. (2) 01 nos. top clamp made of copper s uitable for 36 to 50 mm bus bar and also suitable 10 -20 mm dia conductor, (3) 01 nos. spare earthing clamp and. (4) special instruction- 1. Discharge rod cable lugs should be made of copper. 2. The cable should have d ouble insulation, a cross- section of 40 sq mm, and 248/0.45 mm strands. 3. The discharge rod should be stro ng enough to prevent swaying or breaking during maximum extension. Every nut and bolt used in the dischar ge rod must include a washer and spring washer to ensure secure fastening. 5. After the award of the P.O., th e firm must ensure approval of one sample of the discharge rod from the consignee before RITES Inspection. 6 . The length of cable from the earthing clamp to top clamp shall not be less than 12.5 mtr. In the cable an insu lated Tee junction shall be provided at a distance of about 3.5 mtr from the earthing clamp. From this insulate d tee junction another piece of cable not less than 1.50 m long shall be provided at the end of which other ear thing clamp shall be provided. 7. The galvanized steel tube (threaded) used for coupling of pieces of discharg e rod should be at least 20 cm or more as required to prevent swaying of pole assembly during erection at sit e. Also at every 5 cm apart two nos steel rivet is required to be provide on galvanized steel tube ( For preventi ng the galvanized steel tube from coming out from each discharge rod pole end). i.e. about 08 nos. or more st eel rivet as required per galvanized steel tube is to be provided for proper fastening of galvanized steel tube i nside the each pole of discharge rod. (Warranty period- 30 months after the date of delivery). [ Warranty Per iod: 30 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| SSE/TRD/KATNI MURWARA, WCR | Madhya Pradesh | 6.00 Set |
| Total | 6 Set | |
25 kV Earthing/Discharge Rod Assembly For High Rise OHE with working Voltage 25 kV AC Tract ion with top clamp (suitable for 36 to 50 mm bus bar and also suitable for 10 to 20 mm dia. Conductor) . Pole made of cast resin or resin-bonded glass fibre, coated with three coats of poly- urethane, The discharge /earth ing pole assembly shall have an overall length of not less than 7.5 meters in five equal sections. Single core fl exible multi strand annealed copper cable should have double insulation, a cross section of 40 sq mm of size 248/0.45 mm and 14 meter long cable (Specification IS: 1554 (pt. I)- 1988 and IS 2071 (pt. 1 and III). With eart hing double Clamp Drg. No. ETI/OHE/SK/482 or latest (Each Discharge Rod is to be supplied with 02 nos. earti ng clamps), Insulated Tee Junction- Insulated Tee junction drg no. ETI/OHE/SK/481 and RE/33/P/530 or latest (t he cable should have an insulated tee junction and the tee clamp should be of brass covered in clamp casing o f ebonite material). And whole assembly to be supplied in rugged canvas bag and all shall be as per RDSO spe cification No. ETI/OHE/51 (9/87) with latest A and C slip no. 1 (10/92) or latest , and additional part required wi th each discharge rod to be supply. (1) 01 nos. insulated tee junction. (2) 01 nos. top clamp made of copper s uitable for 36 to 50 mm bus bar and also suitable 10 -20 mm dia conductor, (3) 01 nos. spare earthing clamp and. (4) special instruction- 1. Discharge rod cable lugs should be made of copper. 2. The cable should have d ouble insulation, a cross- section of 40 sq mm, and 248/0.45 mm strands. 3. The discharge rod should be stro ng enough to prevent swaying or breaking during maximum extension. Every nut and bolt used in the dischar ge rod must include a washer and spring washer to ensure secure fastening. 5. After the award of the P.O., th e firm must ensure approval of one sample of the discharge rod from the consignee before RITES Inspection. 6 . The length of cable from the earthing clamp to top clamp shall not be less than 12.5 mtr. In the cable an insu lated Tee junction shall be provided at a distance of about 3.5 mtr from the earthing clamp. From this insulate d tee junction another piece of cable not less than 1.50 m long shall be provided at the end of which other ear thing clamp shall be provided. 7. The galvanized steel tube (threaded) used for coupling of pieces of discharg e rod should be at least 20 cm or more as required to prevent swaying of pole assembly during erection at sit e. Also at every 5 cm apart two nos steel rivet is required to be provide on galvanized steel tube ( For preventi ng the galvanized steel tube from coming out from each discharge rod pole end). i.e. about 08 nos. or more st eel rivet as required per galvanized steel tube is to be provided for proper fastening of galvanized steel tube i nside the each pole of discharge rod. (Warranty period- 30 months after the date of delivery). [ Warranty Per iod: 30 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| SSE/TRD/KATNI MURWARA, WCR | Madhya Pradesh | 28.00 Numbers |
| Total | 28 Numbers | |
25 kV Earthing/Discharge Rod Assembly For High Rise OHE with working Voltage 25 kV AC Tract ion with top clamp (suitable for 36 to 50 mm bus bar and also suitable for 10 to 20 mm dia. Conductor) . Pole made of cast resin or resin-bonded glass fibre, coated with three coats of poly- urethane, The discharge /earth ing pole assembly shall have an overall length of not less than 7.5 meters in five equal sections. Single core fl exible multi strand annealed copper cable should have double insulation, a cross section of 40 sq mm of size 248/0.45 mm and 14 meter long cable (Specification IS: 1554 (pt. I)- 1988 and IS 2071 (pt. 1 and III). With eart hing double Clamp Drg. No. ETI/OHE/SK/482 or latest (Each Discharge Rod is to be supplied with 02 nos. earti ng clamps), Insulated Tee Junction- Insulated Tee junction drg no. ETI/OHE/SK/481 and RE/33/P/530 or latest (t he cable should have an insulated tee junction and the tee clamp should be of brass covered in clamp casing o f ebonite material). And whole assembly to be supplied in rugged canvas bag and all shall be as per RDSO spe cification No. ETI/OHE/51 (9/87) with latest A and C slip no. 1 (10/92) or latest , and additional part required wi th each discharge rod to be supply. (1) 01 nos. insulated tee junction. (2) 01 nos. top clamp made of copper s uitable for 36 to 50 mm bus bar and also suitable 10 -20 mm dia conductor, (3) 01 nos. spare earthing clamp and. (4) special instruction- 1. Discharge rod cable lugs should be made of copper. 2. The cable should have d ouble insulation, a cross- section of 40 sq mm, and 248/0.45 mm strands. 3. The discharge rod should be stro ng enough to prevent swaying or breaking during maximum extension. Every nut and bolt used in the dischar ge rod must include a washer and spring washer to ensure secure fastening. 5. After the award of the P.O., th e firm must ensure approval of one sample of the discharge rod from the consignee before RITES Inspection. 6 . The length of cable from the earthing clamp to top clamp shall not be less than 12.5 mtr. In the cable an insu lated Tee junction shall be provided at a distance of about 3.5 mtr from the earthing clamp. From this insulate d tee junction another piece of cable not less than 1.50 m long shall be provided at the end of which other ear thing clamp shall be provided. 7. The galvanized steel tube (threaded) used for coupling of pieces of discharg e rod should be at least 20 cm or more as required to prevent swaying of pole assembly during erection at sit e. Also at every 5 cm apart two nos steel rivet is required to be provide on galvanized steel tube ( For preventi ng the galvanized steel tube from coming out from each discharge rod pole end). i.e. about 08 nos. or more st eel rivet as required per galvanized steel tube is to be provided for proper fastening of galvanized steel tube i nside the each pole of discharge rod. (Warranty period- 30 months after the date of delivery). [ Warranty Per iod: 30 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| SSE/TRD/KATNI MURWARA, WCR | Madhya Pradesh | 6.00 Numbers |
| Total | 6 Numbers | |
25 kV Earthing/Discharge Rod Assembly For High Rise OHE with working Voltage 25 kV AC Tract ion with top clamp (suitable for 36 to 50 mm bus bar and also suitable for 10 to 20 mm dia. Conductor) . Pole made of cast resin or resin-bonded glass fibre, coated with three coats of poly- urethane, The discharge /earth ing pole assembly shall have an overall length of not less than 7.5 meters in five equal sections. Single core fl exible multi strand annealed copper cable should have double insulation, a cross section of 40 sq mm of size 248/0.45 mm and 14 meter long cable (Specification IS: 1554 (pt. I)- 1988 and IS 2071 (pt. 1 and III). With eart hing double Clamp Drg. No. ETI/OHE/SK/482 or latest (Each Discharge Rod is to be supplied with 02 nos. earti ng clamps), Insulated Tee Junction- Insulated Tee junction drg no. ETI/OHE/SK/481 and RE/33/P/530 or latest (t he cable should have an insulated tee junction and the tee clamp should be of brass covered in clamp casing o f ebonite material). And whole assembly to be supplied in rugged canvas bag and all shall be as per RDSO spe cification No. ETI/OHE/51 (9/87) with latest A and C slip no. 1 (10/92) or latest , and additional part required wi th each discharge rod to be supply. (1) 01 nos. insulated tee junction. (2) 01 nos. top clamp made of copper s uitable for 36 to 50 mm bus bar and also suitable 10 -20 mm dia conductor, (3) 01 nos. spare earthing clamp and. (4) special instruction- 1. Discharge rod cable lugs should be made of copper. 2. The cable should have d ouble insulation, a cross- section of 40 sq mm, and 248/0.45 mm strands. 3. The discharge rod should be stro ng enough to prevent swaying or breaking during maximum extension. Every nut and bolt used in the dischar ge rod must include a washer and spring washer to ensure secure fastening. 5. After the award of the P.O., th e firm must ensure approval of one sample of the discharge rod from the consignee before RITES Inspection. 6 . The length of cable from the earthing clamp to top clamp shall not be less than 12.5 mtr. In the cable an insu lated Tee junction shall be provided at a distance of about 3.5 mtr from the earthing clamp. From this insulate d tee junction another piece of cable not less than 1.50 m long shall be provided at the end of which other ear thing clamp shall be provided. 7. The galvanized steel tube (threaded) used for coupling of pieces of discharg e rod should be at least 20 cm or more as required to prevent swaying of pole assembly during erection at sit e. Also at every 5 cm apart two nos steel rivet is required to be provide on galvanized steel tube ( For preventi ng the galvanized steel tube from coming out from each discharge rod pole end). i.e. about 08 nos. or more st eel rivet as required per galvanized steel tube is to be provided for proper fastening of galvanized steel tube i nside the each pole of discharge rod. (Warranty period- 30 months after the date of delivery). [ Warranty Per iod: 30 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| SSE/TRD/KATNI MURWARA, WCR | Madhya Pradesh | 70.00 Numbers |
| Total | 70 Numbers | |
25 kV Earthing/Discharge Rod Assembly For High Rise OHE with working Voltage 25 kV AC Tract ion with top clamp (suitable for 36 to 50 mm bus bar and also suitable for 10 to 20 mm dia. Conductor) . Pole made of cast resin or resin-bonded glass fibre, coated with three coats of poly- urethane, The discharge /earth ing pole assembly shall have an overall length of not less than 7.5 meters in five equal sections. Single core fl exible multi strand annealed copper cable should have double insulation, a cross section of 40 sq mm of size 248/0.45 mm and 14 meter long cable (Specification IS: 1554 (pt. I)- 1988 and IS 2071 (pt. 1 and III). With eart hing double Clamp Drg. No. ETI/OHE/SK/482 or latest (Each Discharge Rod is to be supplied with 02 nos. earti ng clamps), Insulated Tee Junction- Insulated Tee junction drg no. ETI/OHE/SK/481 and RE/33/P/530 or latest (t he cable should have an insulated tee junction and the tee clamp should be of brass covered in clamp casing o f ebonite material). And whole assembly to be supplied in rugged canvas bag and all shall be as per RDSO spe cification No. ETI/OHE/51 (9/87) with latest A and C slip no. 1 (10/92) or latest , and additional part required wi th each discharge rod to be supply. (1) 01 nos. insulated tee junction. (2) 01 nos. top clamp made of copper s uitable for 36 to 50 mm bus bar and also suitable 10 -20 mm dia conductor, (3) 01 nos. spare earthing clamp and. (4) special instruction- 1. Discharge rod cable lugs should be made of copper. 2. The cable should have d ouble insulation, a cross- section of 40 sq mm, and 248/0.45 mm strands. 3. The discharge rod should be stro ng enough to prevent swaying or breaking during maximum extension. Every nut and bolt used in the dischar ge rod must include a washer and spring washer to ensure secure fastening. 5. After the award of the P.O., th e firm must ensure approval of one sample of the discharge rod from the consignee before RITES Inspection. 6 . The length of cable from the earthing clamp to top clamp shall not be less than 12.5 mtr. In the cable an insu lated Tee junction shall be provided at a distance of about 3.5 mtr from the earthing clamp. From this insulate d tee junction another piece of cable not less than 1.50 m long shall be provided at the end of which other ear thing clamp shall be provided. 7. The galvanized steel tube (threaded) used for coupling of pieces of discharg e rod should be at least 20 cm or more as required to prevent swaying of pole assembly during erection at sit e. Also at every 5 cm apart two nos steel rivet is required to be provide on galvanized steel tube ( For preventi ng the galvanized steel tube from coming out from each discharge rod pole end). i.e. about 08 nos. or more st eel rivet as required per galvanized steel tube is to be provided for proper fastening of galvanized steel tube i nside the each pole of discharge rod. (Warranty period- 30 months after the date of delivery). [ Warranty Per iod: 30 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| SSE/TRD/KATNI MURWARA, WCR | Madhya Pradesh | 90.00 Numbers |
| Total | 90 Numbers | |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .