Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.5 LAccepted-Finance KARAVALLI NADUCOMBAI PO NAMAKKAL 637404 | NAMAKKAL | TAMIL NADU | 637404 | ₹12.5 L | L1 | Accepted-Finance L1 |
| 2 | L2₹12.8 L+₹27,522 (2.20%)Rejected-Finance 1 65A KARAVALLI NADUKOMBAI NAMMAKKAL DISTRICT 637 404 | NAMAKKAL | TAMIL NADU | 637404 | ₹12.8 L+₹27,522 (2.20%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | SRM Constructions H2 | M/s.SRM INFRA H1 |
|---|---|---|---|---|---|
| 1.00Construction of Community Dug well and Supply & Fixing of Motor with Extention of Pipe line at Ariyurnadu H/O Ariyurnadu | |||||
| 2.00 | Earth work open well excavation complying with relevant clauses of T.N.D.S.S. Well sinking and with lead upto 10 metre in sand, silt or other loose soil, Wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil - First depth of 2 metre.First depth 0.00 - 2.00m | 31.79 | Cum | 123.34 ₹3,920.98 Lowest | 123.34 ₹3,920.98 Lowest |
| 3.00 | Earth work open well excavation complying with relevant clauses of T.N.D.S.S. Well sinking and with lead upto 10 metre in Hard stiff clay, stiff black coton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravely soil - First depth of 2 metre .Second depth 2.00 - 4.00m | 31.79 | Cum | 368.12 ₹11,702.53 Lowest | 368.12 ₹11,702.53 Lowest |
| 4.00 | Earth work open well excavation complying with relevant clauses of T.N.D.S.S. Well sinking and with lead upto 10 metre in soft disintegrated rock, laterite, soft rock or kankar not requiring blasting - First depth of 2 metre.Third depth 4.00 - 6.00m | 31.79 | Cum | 850.75 ₹27,045.34 Lowest | 850.75 ₹27,045.34 Lowest |
| 5.00 | Earth work open well excavation complying with relevant clauses of T.N.D.S.S. Well sinking and with lead upto 10 metre in soft disintegrated rock, laterite, soft rock or kankar not requiring blasting - First depth of 2 metre.Four depth 6.00 - 8.00m | 31.79 | Cum | 1,134.34 ₹36,060.67 Lowest | 1,134.34 ₹36,060.67 Lowest |
| 6.00 | Earth work open well excavation complying with relevant clauses of T.N.D.S.S. Well sinking and with lead upto 10 metre in soft disintegrated rock, laterite, soft rock or kankar not requiring blasting - First depth of 2 metre.Fifth depth 8.00 - 10.00m | 7.95 | Cum | 1,417.92 ₹11,272.46 Lowest | 1,417.92 ₹11,272.46 Lowest |
| 7.00 | Supplying and errecting shuttering including necessary support for plane surface etc., complete complying with standard specification and as directed | 229.35 | Sqm | 2,205 ₹5,05,716.75 Lowest | 2,325 ₹5,33,238.75 |
| 8.00 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works | 0.41 | MT | 1,06,535.96 ₹43,147.06 Lowest | 1,06,535.96 ₹43,147.06 Lowest |
| 9.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete | 17.2 | Cum | 11,603.69 ₹1,99,583.47 Lowest | 11,603.69 ₹1,99,583.47 Lowest |
| 10.00Sub Estimate | |||||
Tender Value
Refer Docs
EMD Value
₹15,000
Closing Date
12 Feb 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (VP)
Union office Kollihills
Construction of Community Dug well and Supply and Fixing of Motor with Extention of Pipe line at Ariyurnadu HO Ariyurnadu
2026_RDTN_651159_6
3116/2025/T3
Open Tender
Civil Works
Item Rate
120 days
Union office Kollihills
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹15,000
Union office Kollihills
22 Aug 2026
5 Feb 2026
12 Feb 2026
5 Feb 2026
12 Feb 2026
5 Feb 2026
5 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Community Dug well and Supply & Fixing of Motor with Extention of Pipe line at Ariyurnadu H/O Ariyurnadu | - | - | - | - |
| 2 | Earth work open well excavation complying with relevant clauses of T.N.D.S.S. Well sinking and with lead upto 10 metre in sand, silt or other loose soil, Wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil - First depth of 2 metre.First depth 0.00 - 2.00m | 31.79 | Cum | - | - |
| - | Earth work open well excavation complying with relevant clauses of T.N.D.S.S. Well sinking and with lead upto 10 metre in Hard stiff clay, stiff black coton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravely soil - First depth of 2 metre .Second depth 2.00 - 4.00m | 31.79 | Cum | - | - |
| - | Earth work open well excavation complying with relevant clauses of T.N.D.S.S. Well sinking and with lead upto 10 metre in soft disintegrated rock, laterite, soft rock or kankar not requiring blasting - First depth of 2 metre.Third depth 4.00 - 6.00m | 31.79 | Cum | - | - |
| - | Earth work open well excavation complying with relevant clauses of T.N.D.S.S. Well sinking and with lead upto 10 metre in soft disintegrated rock, laterite, soft rock or kankar not requiring blasting - First depth of 2 metre.Four depth 6.00 - 8.00m | 31.79 | Cum | - | - |
| - | Earth work open well excavation complying with relevant clauses of T.N.D.S.S. Well sinking and with lead upto 10 metre in soft disintegrated rock, laterite, soft rock or kankar not requiring blasting - First depth of 2 metre.Fifth depth 8.00 - 10.00m | 7.95 | Cum | - | - |
| - | Supplying and errecting shuttering including necessary support for plane surface etc., complete complying with standard specification and as directed | 229.35 | Sqm | - | - |
| - | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works | 0.41 | MT | - | - |
| - | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete | 17.2 | Cum | - | - |
| - | Sub Estimate | - | - | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
AriyurnaduopenwellBIT.pdf
Tender Documents • 2.23 MB
BOQ_781228.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .