| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹50.8 LAdmitted-Finance MALPADA BALANGIR BALANGIR ODISHA PIN 767001 | BALANGIR | ODISHA | 767001 | -0.10% | ₹50.8 L | L1 | Admitted-Finance |
| 2 | L1₹50.8 LAdmitted-Finance AT PO KANTABANJI TUREKLA PIN 767039 DISTRICT BALANGIR ODISHA | KANTABANJI | BALANGIR | ODISHA | 767039 | -0.10% | ₹50.8 L | L1 | Admitted-Finance |
| 3 | L2₹50.9 L+₹5,089.21 (0.10%)Admitted-Finance AT RAMPAS LAXMINAGAR PO FC PROJECT JAJPUR ROAD JAJPUR | JAJAPUR | ODISHA | 755019 | +0.00% | ₹50.9 L+₹5,089.21 (0.10%) | L2 | Admitted-Finance |
| 4 | Rejected-Technical WARD NO 09 PATNAGARH BALANGIR ODISHA PIN 767025 | BALANGIR | ODISHA | 767025 | - | - | - | Rejected-Technical Not fulfilled the criteria as per DTCN Clause No. 11 (a). |
| 5 | Rejected-Technical SAGAR COLONY STATION ROAD PO DISTRICT BALANGIR ODISHA | BALANGIR | BALANGIR | ODISHA | - | - | - | Rejected-Technical Not fulfilled the criteria as per DTCN Clause No. 11 (a). |
Tender Value
₹50.9 L
EMD Value
₹50,892
Closing Date
19 Jun 2026, 5:00 pmClosed
S.E. Electrical Circle (RandB) Bhubaneswar
S.E. Electrical Circle (RandB) Bhubaneswar, Nirman Soudha, Unkit-V, 751001.
Utility Shifting work for HT, LT Line and S s for Road widening at-Kamarlaga, Rengali, Dumalpada and Phapsi Village under ESO Saintala.
2026_EICCL_131098_1
Bid Identification No.S.E.E.C (RandB) 11/2026-27
National Competitive Bid
Electrical Works
Percentage
180 days
Kantabanji
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹50,892
24 Jul 2026
4 Jun 2026
20 Jun 2026
4 Jun 2026
19 Jun 2026
4 Jun 2026
4 Jun 2026 - 11 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cost of other materials for line and sub station
Cost of 55 mm2 AAAC for 11kV line | 7.69 | Km | 51,416 | ₹3,95,599.85 |
| 2 | Cost of common material for 11KV SP Pin point with 9 mtr long PSC Pole (Excluding pole & Civil work cost) | 28 | No | 4,237 | ₹1,18,636 |
| 3 | Cost of common material for 11KV SP Pin point with 11 mtr long RSJ Pole (GI) pole (Excluding pole & Civil work cost) | 18 | No | 4,365 | ₹78,570 |
| 4 | Cost of common material for 11KV DP with 9 mtr long PSC pole (Excluding pole & civil work cost) | 4 | No | 60,970 | ₹2,43,880 |
| 5 | Cost Analysis of Cradle Guard | 9 | No | 11,470 | ₹1,03,230 |
| 6 | Cost of D.P. Mounted. 11/.4KV S/S using 9 mtr X300 Kg Long PSC Pole with double disc arrangement for 63 KVA Transformer.(Excluding pole & Transformer) | 1 | No | 1,72,827 | ₹1,72,827 |
| 7 | Cost of 3 Ph 95 mm2 (2 wire)AB cable | 2.12 | Km | 4,16,470 | ₹8,82,916.4 |
| 8 | Cost of common materials for 3-Ph LT line (30 Mtr Span) Excluding Pole & Cable | 2 | Km | 2,07,970 | ₹4,15,940 |
| 9 | Cost of Transormer/Breaker/Joist Pole
Supports of 9 mtr. long 150 X 150 mm RSJ (GI) Pole 11 KV line +S/S+others) | 16 | No | 33,919 | ₹5,42,704 |
| 10 | Supports of 11 mtr. long 150x150mm RSJ (GI) Pole 11 KV line +S/S+others) | 18 | No | 46,875 | ₹8,43,750 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
DTCN.pdf
Tender Documents • 1.95 MB
BOQ_594600.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .