| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.7 LAccepted-AOC 1077 SECTOR 16 17 HISAR | HISAR | HISAR | HARYANA | L1 | Accepted-AOC Tender alloted to Agency | |
| 2 | Rejected-Technical | - | Rejected-Technical Technical Bid found Non Responsive |
Tender Value
₹11.4 L
EMD Value
₹23,000
Closing Date
2 Dec 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer Bhiwani/Superintending Engineer
PWD B and R office Bhiwani
Special Repair by pdg. 20mm thick PC, Re-laying C.C. Blocks on Khanak app. road to Dhani Khanak from Km. 0.00 to 0.350 in Bhiwani District. (Road ID No 2108) (SCSP Scheme) (Re-Invite)
2021_HRY_196654_1
BWN/Rs. 11.38 Lacs/ Khankh app. road (Re-invite)
Open Tender
Civil Works - Roads
Works
90 days
Bhiwani
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
₹23,000
5 Jan 2022
18 Nov 2021
3 Dec 2021
18 Nov 2021
2 Dec 2021
18 Nov 2021
120 days
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. (HSR 4.14.1)
Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) (HSR 7.20.1)
Brick on end in soil/edging in required pattern with bricks of class designation (HSR 10.36)
Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. (HSR 10.100.2)
12 mm cement plaster of mix 1 :4 (1 cement: 4 fine sand)(HSR 11.5.3)
Compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications (in case of link roads earthwork to be done by villagers) (HSR 17.5.3)
Construction of Embankment CBR 8% (for new road/ raising/ berms/ etc.) with approved material obtained from borrow pits, including compensation of earth with all lead and lift transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300- 2, as per technical clause 305 of MORT&H specifications.(HSR 17.6)
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300- 2.as per technical clause 305 of MORT&H specifications. (Use Excavated earth(HSR 17.7)
Excavation for roadwork in soil by mechanical means including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and disposal within all lead and lift as per technical clause 301 of MORT&H specifications(HSR 17.10.1)
Providing & laying 150mm Granular Sub-Base with Coarse Graded Material - Grading-I (Table:- 400-2) Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.of MORT&H specifications. Grading I material (Based on HSR 17.15.1) Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Providing, laying 150 mm WBM (G-II) 53 mm to 22.4 mm , spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications (Based on HSR 17.23.2) Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Providing and applying tack coat with penetration grade bitumen VG - 10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per technical clause 503 of MORT&H specifications (Based on HSR 17.26.2)
Providing and laying surface dressing as wearing course in single coat using crushed stone aggregates of specified size on a layer of bituminous binder VG - 10 laid on prepared surface and rolling with 8-10 tonne smooth wheeled steel roller complete as per technical clause 509 of MORT&H specifications:19 mm nominal chipping size, with bitumen (Based on HSR 17.32.1)
Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of crushed stone aggregates of specified grading premixed in a continuous type of hot mix plant of appropriate capacity not less not less than 75 tonne per hour, with bituminous binder VG - 10 @ 1.46 kg per sqm, laid with Paver Finisher Mechanical and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades complete as per technical clause 510 of MORT&H specifications. (Based on HSR 17.33.1)
Providing and laying of premix sand seal coat premixed in continuous type HMP of appropriate capacity not less than 75 tonnes/ hours using specified fine aggregates and penetration grade bitumen @0.68 kg/sqm laid to specified levels, grade and cross fall complete as per technical clause 511 of MORT&H specifications. (Based on HSR 17.36.3)
Milling on Bituminous Surface: Dismantling of existing damaged Bitumen surface by cold Milling Machine up to any depth and hauling the milled material up to any lead and stacking at nearest recycling Plant site ( Based on HSR 17.43.2)
Providing and Laying Reinforced cement concrete pipe NP3 /NP-4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets 1000 mm dia, as per clause 2900 of MORT&H specifications (HSR 17.61.1)
Providing and laying of cement concrete blocks of size 0.450 m x 0.300 m x 0.15 m of cement concrete (C.C) M30 grade and spreading 25 mm thick sand underneath filling joints with sand on existing W.B.M. base as per technical specification clause 1503 (HSR 17.66.1)
Removal of existing CC Block (HSR 17.67)
Relaying of available (removed and stacked) C.C. Block M-30 Size 450x300x150mm (HSR 17.68)
Demolishing dry brick on end edging pitching in floors, drains etc. including stacking of serviceable material and disposal of unserviceable material within any lead.(HSR 17.75)
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including Reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. (HSR 34.26) Note:- Before start of work the contractor shall give brand , batch no. , manufacturing date of the material to be used and get approved the same from Engineer-In-Charge before use
Recovery items: The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from dismantling of existing brick work, bituminous layer and granular layers have been calculated taking assumption that 80% of theoretical material will be retrieved. The dismantled material can used in any of the item for the work after modification (bringing it to required specifications) after approval from employer. In case it is not possible to use this material on the work, the agency can take away this material. This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed and mentioned as under :- (i) Bricks @ Rs. 5 /- Each
(ii) Brick Bats @ 500/- P.Cum
(iii) Bitumin @ Rs 1365/- P.cum
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .