Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 LAdmitted-Fee/PreQual/Technical/Finance | ₹1.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.2 L+₹2,354 (2.06%)Admitted-Fee/PreQual/Technical/Finance | ₹1.2 L+₹2,354 (2.06%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.2 L+₹3,179.56 (2.78%)Admitted-Fee/PreQual/Technical/Finance | ₹1.2 L+₹3,179.56 (2.78%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹1.4 L+₹22,598.25 (19.7%)Admitted-Fee/PreQual/Technical/Finance | ₹1.4 L+₹22,598.25 (19.7%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance ARANI 632317 | TIRUVANNAMALAI | TAMIL NADU | 632317 | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Not uploaded Registration certificate |
| Sl No | Description | Qty | Unit | B Sabari Contractor L1 | Usharani L3 | Lokesh.S L4 | Sathyanarayanan K L2 |
|---|---|---|---|---|---|---|---|
| 1.01Providing Delivery pipeline 375 m in Vandipalayam street at Mozhugamboondi Panchayat in Arni Block under Panchayat General Fund 2026-2027 | |||||||
| 1.02 | Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches having bed width 1.25m & below for laying of pipes for water supply and sewerage works in the following type of soils as directed by Departmental officers SOR Voll II Page No : 215 | 236.25 | Cum | 146 ₹34,492.5 Lowest | 190 ₹44,887.5 | 195 ₹46,068.75 | 260 ₹61,425 |
| 1.03 | Towards cost and supply of 63 mm dia Pvc Pipes4 ksc , bend and specials including cost and conveyance etc complete. SOR Voll I Page No : 163 | 375 | Rm | 85 ₹31,875 | 93.75 ₹35,156.25 | 60 ₹22,500 Lowest | 60 ₹22,500 Lowest |
| 1.04 | Lowering PVC/ DWSC rigid pipes and specials to trench and laying to proper grade and alignment, jointing with PVC couplers with cement paste SOR Voll II Page No : 198 | 375 | Rm | 25 ₹9,375 | 23.53 ₹8,823.75 | 45 ₹16,875 | 15 ₹5,625 Lowest |
| 1.05 | Refilling with excavated earth other than sand including cost and conveyance of all charges,etc,complete SOR Voll I Page No : 37 | 236.25 | Cum | 90 ₹21,262.5 | 45.85 ₹10,832.06 | 130 ₹30,712.5 | 40 ₹9,450 Lowest |
| 1.06 | GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 17,461 ₹17,461 Lowest | 17,946 ₹17,946 | 20,908 ₹20,908 | 17,820 ₹17,820 |
Tender Value
₹1.6 L
EMD Value
₹1,600
Closing Date
21 Sept 2026, 3:00 pmClosed
Block Development Officer(VP)Arni
Block Development Office(VP)Arni
Providing Delivery pipeline 375 m in Vandipalayam street at Mozhugamboondi Panchayat in Arni Block under Panchayat General Fund 2026-2027
2026_RDTN_701328_1
Pro.No.2348/2025/A5/A.D.P and A.C.D Date 05.07.2026 ARNI01
Open Tender
Water Supply/Equipments/Meter/Drilling/Boring
Item Rate
30 days
Arni
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,600
22 Sept 2026
3 Sept 2026
21 Sept 2026
3 Sept 2026
21 Sept 2026
3 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Providing Delivery pipeline 375 m in Vandipalayam street at Mozhugamboondi Panchayat in Arni Block under Panchayat General Fund 2026-2027 | - | - | - | - |
| 1.02 | Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches having bed width 1.25m & below for laying of pipes for water supply and sewerage works in the following type of soils as directed by Departmental officers SOR Voll II Page No : 215 | 236.25 | Cum | 329.73 | ₹77,898.71 |
| 1.03 | Towards cost and supply of 63 mm dia Pvc Pipes4 ksc , bend and specials including cost and conveyance etc complete. SOR Voll I Page No : 163 | 375 | Rm | 93.75 | ₹35,156.25 |
| 1.04 | Lowering PVC/ DWSC rigid pipes and specials to trench and laying to proper grade and alignment, jointing with PVC couplers with cement paste SOR Voll II Page No : 198 | 375 | Rm | 23.53 | ₹8,823.75 |
| 1.05 | Refilling with excavated earth other than sand including cost and conveyance of all charges,etc,complete SOR Voll I Page No : 37 | 236.25 | Cum | 45.85 | ₹10,832.06 |
| 1.06 | GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | - | - |
stage.html
html • 0.02 MB
finance_843004.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
Tenderdocument.pdf
Tender Documents • 0.31 MB
BOQ_843004.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .