| 1.00 | Picking BT Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 725 | Sqm | 23 ₹16,675 | 25 ₹18,125 |
| 2.00 | Shoulder Filling Using Gritty Gravel Collection and supply of Gritty Gravel from approved quarry an average 1KM Mixed with existing earth including cost and conveyance of all materials to site all labour charges etc | 104.4 | Cum | 368 ₹38,419.20 | 375 ₹39,150 |
| 3.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 276.79 | Cum | 2,564 ₹7.1 L | 2,650 ₹7.3 L |
| 4.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 2,214.38 | Sqm | 84 ₹1.9 L | 85 ₹1.9 L |
| 5.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 2,214.38 | Sqm | 20 ₹44,287.60 | 21 ₹46,501.98 |
| 6.00 | BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as
per specification using CMP as per clause 507 of MORTH Rev-5 | 55.36 | Cum | 11,053 ₹6.1 L | 11,250 ₹6.2 L |
| 7.00 | Provision for HM Stone | 3 | Nos | 574 ₹1,722 | 600 ₹1,800 |
| 8.00 | Provision for Sign Board | 2 | Nos | 4,999 ₹9,998 | 5,125 ₹10,250 |
| 9.00 | Provision for Name Board Cum Citizen Board | 1 | Nos | 4,500 ₹4,500 | 4,650 ₹4,650 |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 2,92,175 ₹2.9 L | 2,99,699 ₹3.0 L |
Updated dates
Tender Value
₹19.5 L
EMD Value
₹20,000
Closing Date
19 Dec 2025, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (VP) ALATHUR
BLOCK DEVELOPMENT OFFICE ALATHUR
Strengthening of the Road from Padalur-Ottathur to Uthangal Road at Padalur Panchayat in Alathur Block Perambalur District UNDER MINES AND MINARALS -2025-26
2025_RDTN_631152_1
Proc.No 3225/2025/B3 Date 28.11.2025
Open Tender
Civil Works
180 days
BLOCK DEVELOPMENT OFFICE ALATHUR
AS PER TENDER DOCUMENTS
4 documents required · 4 mandatory
₹0
₹20,000
21 Feb 2026
11 Dec 2025
19 Dec 2025
11 Dec 2025
19 Dec 2025
11 Dec 2025
Picking BT Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
Shoulder Filling Using Gritty Gravel Collection and supply of Gritty Gravel from approved quarry an average 1KM Mixed with existing earth including cost and conveyance of all materials to site all labour charges etc
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision for HM Stone
Provision for Sign Board
Provision for Name Board Cum Citizen Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.48 MB
PART2.pdf
Tender Documents • 0.66 MB
PART1.pdf
Tender Documents • 0.81 MB
EMD.pdf
Additional Documents • 0.14 MB
BOQ_754816.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid