Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.7 LAdmitted-Finance | ₹8.7 L | L1 | Admitted-Finance |
| 2 | L2₹8.8 LAdmitted-Finance | ₹8.8 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M M Engineers L2 | M/s AADRIKA ASSOCIATES L1 |
|---|---|---|---|---|---|
| 1.01 | Disconnecting of HT supply from main panel after switching off 11 KV VCB discharging the supply. Complete drain out of transformer oil from transformer into empty oil drum by oil machine, dismantling of conservator tank and all protection relays, cable end boxes, vent pipes and other items as required. | 1 | Job | 32,900 ₹38,822 | 31,700 ₹37,406 |
| 1.02 | Cleaning of transformer oil tank and removing of sludge settled in the bottom with the help of vacuum pressure cleaning machine thoroughly, cleaning of core and winding of transformer with hot oil and proper safety precaution to prevent the winding damage as required, cutting of old overheated insulation of winding and reinsulation of weak point with the help of HT insulation material and proper taping etc. | 1 | Job | 2,09,000 ₹2.5 L | 2,09,000 ₹2.5 L |
| 1.03 | Replacement of LV bushing with the help of skilled and trained labor with all tools and tackles etc as per site requirement. | 1 | Set | 89,500 ₹1.1 L | 89,500 ₹1.1 L |
| 1.04 | Replacement of silica gel. | 1 | Job | 9,500 ₹11,210 | 9,500 ₹11,210 |
| 1.05 | Checking & matching of control wiring of all protection relays and calibration of bucchalz relay and protection relays testing the same. | 1 | Job | 46,500 ₹54,870 | 45,500 ₹53,690 |
| 1.06 | Complete assembling of transformer cleaning of complete transformer tightening of all connection of incoming and outgoing side and testing & checking of IR test with megger of winding & cable of both sides HI pot machine. Replacement of oil seals missing hardware to stop the oil leakage. | 1 | Job | 75,500 ₹89,090 | 74,000 ₹87,320 |
| 1.07 | Replacement of Transformer oil up to top up level as required. Make - Transpower | 815 | Ltrs. | 1,56,480 ₹1.8 L | 1,56,480 ₹1.8 L |
| 1.08 | Repair of cooling fins for stopping the leakage. | 4 | Jobs | 40,600 ₹47,908 | 40,600 ₹47,908 |
| 1.09 | Providing and fixing of missing MS Plate covers for concealing the safety of Transformers at HV side, LV Side and bus duct by cutting, grinding and drilling according to proper fitment and tightening the same with the help of suitable nut, bolts and washers as per site requirement. | 1 | Job | 9,500 ₹11,210 | 8,500 ₹10,030 |
| 1.10 | Dehydration & filtration of complete transformer oil and checking the die electric strength up to 50 KV at site. | 1 | Job | 36,800 ₹43,424 | 36,000 ₹42,480 |
Tender Value
Refer Docs
EMD Value
₹17,400
Closing Date
1 Jun 2026, 3:00 pmClosed
Office of the Ex. Eng. (E and M) M-2
Pocket-A, Dilshad Garden, Delhi-110095
Renovation/Servicing of VOLTAMP make 1250 KVA Transformer no.2 at Usmanpur BPS in AC-65.
2026_DJB_291997_4
NIT No. 02 (26-27)
Open Tender
Miscellaneous Works
30 days
Usmanpur BPS
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Ac No. 50448339804
₹17,400
5 Jun 2026
25 May 2026
1 Jun 2026
25 May 2026
1 Jun 2026
25 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code | GST % |
|---|---|---|---|---|---|---|---|
| 1.01 | Disconnecting of HT supply from main panel after switching off 11 KV VCB discharging the supply. Complete drain out of transformer oil from transformer into empty oil drum by oil machine, dismantling of conservator tank and all protection relays, cable end boxes, vent pipes and other items as required. | 1 | Job | 80 | ₹80 | item1 | 18% |
| 1.02 | Cleaning of transformer oil tank and removing of sludge settled in the bottom with the help of vacuum pressure cleaning machine thoroughly, cleaning of core and winding of transformer with hot oil and proper safety precaution to prevent the winding damage as required, cutting of old overheated insulation of winding and reinsulation of weak point with the help of HT insulation material and proper taping etc. | 1 | Job | 80 | ₹80 | item2 | 18% |
| 1.03 | Replacement of LV bushing with the help of skilled and trained labor with all tools and tackles etc as per site requirement. | 1 | Set | 80 | ₹80 | item3 | 18% |
| 1.04 | Replacement of silica gel. | 1 | Job | 80 | ₹80 | item4 | 18% |
| 1.05 | Checking & matching of control wiring of all protection relays and calibration of bucchalz relay and protection relays testing the same. | 1 | Job | 80 | ₹80 | item5 | 18% |
| 1.06 | Complete assembling of transformer cleaning of complete transformer tightening of all connection of incoming and outgoing side and testing & checking of IR test with megger of winding & cable of both sides HI pot machine. Replacement of oil seals missing hardware to stop the oil leakage. | 1 | Job | 80 | ₹80 | item6 | 18% |
| 1.07 | Replacement of Transformer oil up to top up level as required. Make - Transpower | 815 | Ltrs. | 80 | ₹65,200 | item7 | 18% |
| 1.08 | Repair of cooling fins for stopping the leakage. | 4 | Jobs | 80 | ₹320 | item8 | 18% |
| 1.09 | Providing and fixing of missing MS Plate covers for concealing the safety of Transformers at HV side, LV Side and bus duct by cutting, grinding and drilling according to proper fitment and tightening the same with the help of suitable nut, bolts and washers as per site requirement. | 1 | Job | 80 | ₹80 | item9 | 18% |
| 1.1 | Dehydration & filtration of complete transformer oil and checking the die electric strength up to 50 KV at site. | 1 | Job | 80 | ₹80 | item10 | 18% |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
BOQ_387577.xls
BOQ • 0.25 MB
NIT.pdf
Tender Documents • 0.65 MB
Download all tender documents and submit your bid