| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.9 Cr+₹15.9 L (9.20%)Admitted-Finance | ₹1.9 Cr+₹15.9 L (9.20%) | L2 | Admitted-Finance |
| 3 | L3₹2.0 Cr+₹31.4 L (18.2%)Admitted-Finance | ₹2.0 Cr+₹31.4 L (18.2%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S HAJI MOHAMMAD AFZAL KUCHAY AND SONS L3 | Ms Ghulam Nabi Magray L2 | MEHRAJUDIN BHAT L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by Manual means in foundation trenches, drains, pipes and cables (not exceeding 1.5m.in width or 10sqm. on plan) including dressing of sides and ramming of bottoms lift upto 1.5m. including getting out the excavated soil and disposal of surplus soil as directed within a lead of 50 meters. All kinds of soil. | 1,488.03 | Cum. | 300 ₹4,46,409 | 250 ₹3,72,007.5 | 140 ₹2,08,324.2 Lowest |
| 2.00 | Earth work in excavation by Mechanical means in foundation trenches, drains, pipes and cables (not exceeding 1.5m.in width or 10sqm. on plan) including dressing of sides and ramming of bottoms lift upto 1.5m. including getting out the excavated soil and disposal of surplus soil as directed within a lead of 50 meters. All kinds of soil. | 2,717.69 | Cum. | 150 ₹4,07,653.5 | 250 ₹6,79,422.5 | 45 ₹1,22,296.05 Lowest |
| 3.00 | Extra for every additional lift of 1.5 m or part thereof in excavation/banking
excavated or stacked material all kinds of soil : 1) 1.5 to 3 mtrs and 3 to 4.5 mtrs | 2,299.09 | Cum. | 10 ₹22,990.9 | 100 ₹2,29,909 | 5 ₹11,495.45 Lowest |
| 3.10 | Extra for every additional lift of 1.5 m or part thereof executed in muddy conditions | 1,400.91 | Cum. | 10 ₹14,009.1 | 100 ₹1,40,091 | 5 ₹7,004.55 Lowest |
| 4.00 | Close timbering in trenches including strutting, shoring and packing cavities (wherever
required) complete. (Measurements to be taken of the face area timbered). 1 . Depth 0 to 1.5 M | 4,454.52 | Sqm. | 15 ₹66,817.8 | 10 ₹44,545.2 Lowest | 45 ₹2,00,453.4 |
| 4.10 | 2. Depth not exceeding 1.5 m but not exceeding 3.00 m | 3,032.43 | Sqm. | 15 ₹45,486.45 | 10 ₹30,324.3 | 2 ₹6,064.86 Lowest |
| 4.20 | 3 . Depth not exceeding 3 m but not exceeding 4.5 m | 371.72 | Sqm. | 15 ₹5,575.8 | 10 ₹3,717.2 | 2 ₹743.44 Lowest |
| 5.00 | Providing and laying dry stone soling. | 346.65 | Cum. | 750 ₹2,59,987.5 | 400 ₹1,38,660 Lowest | 945 ₹3,27,584.25 |
| 6.00 | Providing & laying in position Cement concrete of specified grade excluding the cost of centering & shuttering All work upto Plinth level in:- 1:4:8 (1cement: 4 coarse sand: 8 graded stone aggregate 20mm nominal size) Crushed | 173.28 | Cum. | 3,000 ₹5,19,840 | 1,800 ₹3,11,904 | 1,440 ₹2,49,523.2 Lowest |
| 7.00 | Providing & laying in position specified grade of reinforced cement concrete excluding the cost of centring & shuttering (All work upto plinth level)All work upto Plinth level in cement concrete 1:1.5: 3 (1Cement: 1.5 coarse sand:3 graded stone aggregate 20mm nominal size) | 305.41 | Cum. | 7,000 ₹21,37,870 Lowest | 8,200 ₹25,04,362 | 8,100 ₹24,73,821 |
Tender Value
₹2.8 Cr
Closing Date
11 Oct 2021, 4:00 pmClosed
O/O Ex. Engineer SND II Srinagar
Daresh Kadal
Construction of RCC Pipe drain including Manholes and construction of Sump Cum Pump House for Drainage Scheme Momin-Abad at Tengpora, Batmaloo, Srimagar (Part A).
2021_HAUDD_140152_1
07/e-NIT SNDII of 2021-22
Open Tender
Civil Works
Item Rate
270 days
Tengpora Mominabd Batmaloo
Please refer Tender documents.
9 documents required · 9 mandatory
₹3,000
Ex. Engineer SND Divn. II SMC Srinagar
Exempted
Daresh Kadal
18 Oct 2021
18 Sept 2021
12 Oct 2021
20 Sept 2021
11 Oct 2021
20 Sept 2021
28 Sept 2021
Amount
Earth work in excavation by Manual means in foundation trenches, drains, pipes and cables (not exceeding 1.5m.in width or 10sqm. on plan) including dressing of sides and ramming of bottoms lift upto 1.5m. including getting out the excavated soil and disposal of surplus soil as directed within a lead of 50 meters. All kinds of soil.
Earth work in excavation by Mechanical means in foundation trenches, drains, pipes and cables (not exceeding 1.5m.in width or 10sqm. on plan) including dressing of sides and ramming of bottoms lift upto 1.5m. including getting out the excavated soil and disposal of surplus soil as directed within a lead of 50 meters. All kinds of soil.
Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material all kinds of soil : 1) 1.5 to 3 mtrs and 3 to 4.5 mtrs
Extra for every additional lift of 1.5 m or part thereof executed in muddy conditions
Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete. (Measurements to be taken of the face area timbered). 1 . Depth 0 to 1.5 M
2. Depth not exceeding 1.5 m but not exceeding 3.00 m
3 . Depth not exceeding 3 m but not exceeding 4.5 m
Providing and laying dry stone soling.
Providing & laying in position Cement concrete of specified grade excluding the cost of centering & shuttering All work upto Plinth level in:- 1:4:8 (1cement: 4 coarse sand: 8 graded stone aggregate 20mm nominal size) Crushed
Providing & laying in position specified grade of reinforced cement concrete excluding the cost of centring & shuttering (All work upto plinth level)All work upto Plinth level in cement concrete 1:1.5: 3 (1Cement: 1.5 coarse sand:3 graded stone aggregate 20mm nominal size)
Reinforcement for R.C.C. work including straightening cutting bending ,placing in position and binding all complete -Thermo mechanically treated Bars.
Centring& shuttering including strutting propping etc. & removal of form work for :-Walls (any thickness) incld. Attached pilasters buttresses plinth and string courses etc.
Suspended floors, roofs, landings, balconies and access plat form.
Edges of slabs above 20 cm wide.
Providing and eracting 1.20 mtrs high Temporary Baricating at site with CGI sheet fixed with angle iron of 50 x 50 x 5 mm eracted at regular spacing with caution boards.
Providing, laying and fitting Non Pressure NP3 Class (Light Duty) RCC pipes of 900mm dia with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement 2 fine sand) including testing of joints and all carriages upto the site of work (Complete Job)
Providing, laying and fitting Non Pressure NP3 Class (Light Duty) RCC pipes of 800mm dia with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement 2 fine sand) including testing of joints and all carriages upto the site of work (Complete Job)
Providing, laying and fitting Non Pressure NP3 Class (Light Duty) RCC pipes of 700mm dia with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement 2 fine sand) including testing of joints and all carriages upto the site of work (Complete Job)
Providing, laying and fitting Non Pressure NP3 Class (Light Duty) RCC pipes of 600mm dia with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement 2 fine sand) including testing of joints and all carriages upto the site of work (Complete Job)
Providing, laying and fitting Non Pressure NP3 Class (Light Duty) RCC pipes of 450mm dia with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement 2 fine sand) including testing of joints and all carriages upto the site of work (Complete Job)
Providing, laying and fitting of polycrete manhole covers including all safe carriages upto site of work (Complete Job)
Providing and fixing of C.I steps including all carriages upto site of work (Complete Job).
Filling available excavated earth (excluding rock) in trenches or embankment in layers (each layer should not exceed 15 cm), with intermediate layer of compacted earth (Soil density of 98%) after every four layers of compacted depth of fly ash, sides & top layer of filling shall be done with earth having total minimum compacted thickness 30 cm or as decided by Engineer -in-charge, including compacting each layer by rolling/ ramming and watering, all complete as per drawing and direction of Engineer -in - charge.
Cutting existing road and making good the same including supply of extra qtys of materials i.e crushed aggregates, moorum, screening, red bajri etc including labour required. 1) Bitumenous Road.
2) Water Bound Macadam
Carriage of materials by mechanical transport including loading, unloading & stacking from approved source to site of work :-Stone soling for 16 Kms.
40mm N.S. stone agg. For 16 Kms
20mm N.S. stone agg. –do-
Sand for 24 Kms.
Disposal of surplus earth for 05 Kms.
Construction of pump house and sump well for a design discharge of 45 cusec, with pump house machine floor level 1 Mtr above HFL complete in all respects. The successful bidder has to submit the detailed design of pump house and sump well duly wetted by Engineer Incharge / DIQC before execution.
Ms Ghulam Nabi Magray
M/S HAJI MOHAMMAD AFZAL KUCHAY AND SONS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_291496.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .