Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC KHOITADIH PROJECT BILPAHARI BARDHAMAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | ₹1.5 Cr | L1 | Accepted-AOC TC recommendation |
| 2 | L2₹1.5 Cr+₹4.6 L (3.11%)Rejected-Finance PANDANESWAR BARDHAMAN BARDHAMAN 713346 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713346 | ₹1.5 Cr+₹4.6 L (3.11%) | L2 | Rejected-Finance TC recommendation |
Tender Value
₹1.5 Cr
EMD Value
₹1.9 L
Closing Date
25 Sept 2023, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Installation and Commissioning of 1200mm x 800 Mtr, 1200mm x 700 Mtr, 1200mm x 400 Mtrs Belt Conveyor at Shyamsundarpur Colliery under Bankola Area.
2023_ECL_288057_1
ECL/GM/BA/E TENDER/23-24/EnM/61 Dt. 05.09.2023
Open Tender
Electrical and Maintenance Works
Item Rate
120 days
Shyamsundarpur Colliery
Please refer to NIT document
5 documents required · 5 mandatory
₹1.9 L
8 Dec 2023
6 Sept 2023
26 Sept 2023
6 Sept 2023
25 Sept 2023
6 Sept 2023
6 Sept 2023 - 11 Sept 2023
Amount
Item Description/ Heading
Transportation & installation of complete 1200 mm drive with gear motor& base frame 21MT + discharge unit 2.75 MT + loop take up with tenssion trolley drum 3.6MT + fixed unit with drum 1MT +load table 01 nos =1MT +tailend 1MT +1200 mm wide conveyor structure with top bottom roller & foot stool 800mtr 80kg /mtr =64MT + starter 1.5 MT+Tail end shifting 20Times-20MT+ load table shifting 20 times-20Mt, total weight =135.85MT
Making load table 02 nos
Making of tailend 02 nos
Fitting of tail end and discharge skapper
Belt laying including transportation of belt jointing tenssioning trail run etc
Providing bolts and nut for fitting of above structure 800mtr 1.5Kg /mtr =1200kg load table discharge & bend pulley loop take up 25 kg =1225kg
Foundation bolting for drive unit 38 nos + discharge unit 24 nos + loop take with fixed unit 36 + tail end (8x20)-nos total =258nos
Making vertical support from roof and floor for hanging the conveyor structure from drive head to discharge by welding gas cutting etc considering cost of consumbles
Cost of fastner 12pkts
Cleaning coal and unused materials & laveling the floor before installation of drive unit base discharge unit base loop take up tail end
Fencing of drive & tail end etc
Drive base frame, discharge base & loop take up cement concrete
Transportation & installation of complete 1200 mm drive with gear motor& base frame 21MT + discharge unit 2.75 MT + loop take up with tenssion trolley drum 3.6MT + fixed unit with drum 1MT +load table 01 nos =1MT +tailend 1MT +1200 mm wide conveyor structure with top bottom roller & foot stool 700mtr 80kg /mtr =56MT + starter 1.5 MT+Tail end shifting 16Times-16MT+ load table shifting 16 times-16Mt, total weight =119.85MT
Making load table 02 nos
Making of Discharge
Fitting of tail end and discharge skapper
Belt laying including transportation of belt jointing tenssioning trail run etc
Providing bolts and nut for fitting of above structure 700mtr 1.5Kg /mtr =1050kg load table discharge & bend pulley loop take up 25 kg =1075kg
Foundation bolting for drive unit 38 nos + discharge unit 24 nos + loop take with fixed unit 36 + tail end (8x16)-nos total =226 nos
Making vertical support from roof and floor for hanging the conveyor structure from drive head to discharge by welding gas cutting etc considering cost of consumbles
Cost of fastner 10pkts
Cleaning coal and unused materials & laveling the floor before installation of drive unit base discharge unit base loop take up tail end
Fencing of drive & tail end etc
Drive base frame, discharge base & loop take up cement concrete
Transportation & installation of complete 1200 mm drive with gear motor& base frame 21MT + discharge unit 2.75 MT + loop take up with tenssion trolley drum 3.6MT + fixed unit with drum 1MT +load table 01 nos =1MT +tailend 1MT +1200 mm wide conveyor structure with top bottom roller & foot stool 400mtr 80kg /mtr =32MT + starter 1.5 MT+Tail end shifting 5Times-5MT+ load table shifting 5 times-5Mt, total weight =73.85MT
Fitting of tail end and discharge skapper
Belt laying including transportation of belt jointing tenssioning trail run etc
Providing bolts and nut for fitting of above structure 400mtr 1.5Kg /mtr =600kg load table discharge & bend pulley loop take up 25 kg =625kg
Foundation bolting for drive unit 38 nos + discharge unit 24 nos + loop take with fixed unit 36 + tail end (8x5)-nos total =134 nos
Making vertical support from roof and floor for hanging the conveyor structure from drive head to discharge by welding gas cutting etc considering cost of consumbles
Cost of fastner 5pkts
Cleaning coal and unused materials & laveling the floor before installation of drive unit base discharge unit base loop take up tail end
Fencing of drive & tail end etc
Drive base frame, discharge base & loop take up cement concrete
Total impact of GST for the purpose of CTC
SWAPAN KUMAR AKHULI
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .