Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 CrAccepted-AOC UNIT NO 17 GROUND FLOOR RECTANGLE 1 DISTRICT CENTRE SAKET NEW DELHI 110017 | NEW DELHI | SOUTH DELHI | DELHI | 110017 | ₹7.6 Cr Quoted ₹7.7 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹7.9 Cr+₹22.1 L (2.86%)Rejected-AOC | ₹7.9 Cr+₹22.1 L (2.86%) | L2 | Rejected-AOC Rejected |
Tender Value
₹7.4 Cr
EMD Value
₹14.7 L
Closing Date
17 Mar 2022, 3:00 pmClosed
Executive Engineer
Behind PWD Rest House Jawahar Nagar Camp Palwal, Distt. Palwal (Haryana)
Providing, Designing, manufacturing of suitable type of liner CIPP liner and its installation, preparation of surface for 1200 mm id RCC pipe sewer line from Panchwati Chowk to existing manhole near STP Palwal and all other works contingent there
2022_HRY_211269_1
SE PWL No. 2544 dated 17.02.2022
Open Tender
Civil Works
Works
180 days
Palwal
Refer to Tender Documents
3 documents required · 3 mandatory
₹20,000
₹14.7 L
Yes
11 Apr 2022
9 Mar 2022
17 Mar 2022
9 Mar 2022
17 Mar 2022
9 Mar 2022
Amount
(A) Desilting of existing sewer by installation of adequate number of over – pumping system, prov. & laying temporary rising main from upstream sides of working length for the smooth flow/ bye-pass of the sewerage system to avoid flood in the adjoining area, desilting of sewer line with mechanical device like Super Sucker Machine, taking out rubbish debris, silt etc. including leak proof stacking arrangement as per technical specification and its safe disposal with in municipal limits as directed by the Engineer-in-Charge. Scope of work includes supply of all material, labour, tools and plants, temporary power connection with stand by generator set of sufficient capacity, Gas Detector, Forced Air Ventilators etc. and provision of safety equipments as guidelines laid in IS -11972 (1987)/ international standards, Traffic Control Arrangements and proper lighting at night, barricading, display of sign boards, insurance of work men, cleaning of site, disposal of surplus earth/ Malba as directed by Engineer-in-Charge, Removal of all hindrances/ obstructions and other unforeseen items. (B) Designing, manufacture of suitable type of liner (CIPP liner) and its installation, dewatering , washing with clear water/ suitable chemical, preparation of surface including dismantling of plaster wherever required, repair of brick work including stabilizations of earth near alignment of existing sewer where repairing work to be carried out as required as per site condition wherever necessary as per standard specification. Maintenance of proper gradient, grouting with adequate pressure including repair / raising / constructing Manholes alongwith PVC footrest as per relevant ISI Specification inclusive of supply of material, labour, tools and plants and after completion f repair/ strengthening of existing sewer line, the inspection should be carried out through CCTV ( Camera) by the agency to the satisfaction of Engineer-incharge. 1200 mm i/d circular RCC sewer from Panchwati Chowk to near 9 MLD STP Palwal
Onsite India Private Limited
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .