Loading…
Loading…
Tender Value
Refer Docs
Closing Date
31 Aug 2026, 11:00 am
Single Packet
Normal Tender
No
Not Applicable
Itemwise/Consigneewise
Lowest to Highest
CONSIGNEE
Not Applicable
90 days
Expenditure
General
81
2 conditions · 1 needing a document upload
Successful Firm to submit proof of purchase from OEM or their authorised dealer, along with the supply.
Firms to attach documentary evidence of their successful performance for tendered/similar item in Indian Railways within three years from the date of opening of this tender. This evidence must include: - Copies of CRN/CRAC in case of Gem/ Inspection Certicicate and submitted along with their offer. Failure to provide this documentary evidence of successful supply will result in summary rejection of the offer. Please note that submission of only a purchase order copy will not be considered as proof of past performance.
19 conditions
Pl check as above
LIQUIDATED DAMAGE (LD) ON DELAYED SUPPLY: For delayed supplies, Recovery of Liquidated Damage (LD) shall be levied @1/2% (half percent) of the price of the store per week or part of the week during which delivery is accepted and the upper limit for recovery of LD in supply contracts is 10%(ten percent) of the value of contract irrespective of delays, unless otherwise provided, specifically in the contract.
Firm to note that single use plastic should not be used in packing, if material to be supplied otherwise it will be rejected. Collection of non-bio-degradables old waste after successful delivery of the product/material from consignee place will be arranged by the supplier.
The bidder confirms that Rates and other financial terms quoted in relevant columns of financial bid will only be ruling terms for acceptance, and such terms quoted anywhere else should be ignored. (Denial of this condition not recommended).
PACKING : The tendered materials are to be packed firmly secured and for safe transit to ensure the receipt on supply in good condition at destination.
Collection of Bio Waste - Collect back scheme for packing waste under SWM: Collection of non - biodegradable solid waste after successful delivery of the product / material from consignee place will be arranged by the supplier.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
1 location across Maharashtra · 150 Numbers total
Thermo Shrink jointing kit
81265652A~WR
81265652A
Open - Indigenous
Goods
Mumbai, Maharashtra
₹0
Exempted
21 Aug 2026
21 Aug 2026
3 items · 150 Numbers total
Thermo Shrink jointing kit for underground PIJF cable of 20 pair 0.63 mm conductor TSF-1 as per RDSO Specification no RDSO/SPN/TC/57/2015 Rev.1 or latest. [ Warranty Period: 30 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| SR. SECTION ENGINEER ( T/STORE ) MUMBAI CENTRAL, WR | Maharashtra | 60.00 Numbers |
| Total | 60 Numbers | |
Thermo Shrink jointing kit for underground PIJF cable of 50 pair 0.5mm to 0.63 mm conductor dia TSF-2 as per RDSO Specification no RDSO/SPN/TC/57/2015 Rev.1 or latest. [ Warranty Period: 30 Mon ths after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| SR. SECTION ENGINEER ( T/STORE ) MUMBAI CENTRAL, WR | Maharashtra | 60.00 Numbers |
| Total | 60 Numbers | |
Thermo Shrink jointing kit for underground PIJF cable of 100 pair 0.5mm to 0.63 mm conduct or dia TSF-3 as per RDSO Specification no RDSO/SPN/TC/57/2015 Rev.1 or latest. [ Warranty Period: 30 M onths after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| SR. SECTION ENGINEER ( T/STORE ) MUMBAI CENTRAL, WR | Maharashtra | 30.00 Numbers |
| Total | 30 Numbers | |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].