Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.9 LAccepted-AOC 5TH FLOOR BUILDING NO B LAKSHMI DATTA APPARTMENTS LOHIA JAIN SQUARE BAWDHAN KHURD PUNE PUNE MAHARASHTRA 411021 | PUNE | MAHARASHTRA | 411021 | ₹19.9 L Quoted ₹25.8 L | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical Rejected |
Tender Value
Refer Docs
EMD Value
₹19,100
Closing Date
17 Jan 2017, 2:00 pmClosed
Chief Materials Manager
Chief Materials ManagerMaterials R and D Centre Faridabad
Supply Installation Commissioning and Training of Attrition Index Unit
2016_RND_45069_1
DRDM16F073
Open Tender
LAB / QC Equipment
Supply
90 days
R and D Centre Faridabad
Please refer Tender documents.
10 documents required · 10 mandatory
₹19,100
Yes
13 Jan 2024
28 Nov 2016
19 Jan 2017
28 Nov 2016
17 Jan 2017
28 Nov 2016
Amount
Supply Portion
Supply of Attrition Index Unit as per the scope defined in the tender specifications Annexure-3 - To be quoted in INR
Onsite Activities of Installation, Commissioning and Training Portion
Service charges for Installation, Commissioning & Training of Attrition Index Unit - including all expenses (to be borne by bidder) e.g. Air Fare, Local Transport, accommodation etc. (To be filled if provided Indian manufacturer ) - To be quoted in INR
The Total value of Schedule4
Description of Work / Item(s)
Supply Portion
Supply of Attrition Index Unit as per the scope defined in the tender specifications Annexure-03 (to be quoted in foreign currency) - Import Component
Supply of Indigenous Items for Attrition Index Unit to be supplied from within India (to be quoted in INR) - Indigenous Component
Onsite Activities of Installation, Commissioning and Training Portion
Service charges for Installation, Commissioning & Training of Attrition Index Unit including all expenses (to be borne by bidder) e.g. Air Fare, Local Transport, accommodation etc. (To be filled if provided directly by the manufacturer from abroad) - To be quoted in foreign currency
Service charges for Installation, Commissioning & Training of Attrition Index Unit - including all expenses (to be borne by bidder) e.g. Air Fare, Local Transport, accommodation etc. (To be filled if provided by Indian representative) - To be quoted in INR
US Dollar
European Euro
Australian Dollar
British Pound
Japanese yen
Egypt, Pounds
Swiss Franc
Singapore Dollar
Portion of Quoted Rate in Currency
US Dollar
European Euro
Australian Dollar
British Pound
Japanese yen
Egypt, Pounds
Swiss Franc
Singapore Dollar
Portion of Quoted Rate in Currency
US Dollar
European Euro
Australian Dollar
British Pound
Japanese yen
Egypt, Pounds
Swiss Franc
Singapore Dollar
Portion of Quoted Rate in Currency
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .