Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC MILAN NAGAR GOALPARA 783121 ASSAM | GOALPARA | GOALPARA | ASSAM | 783121 | ₹1.2 Cr Quoted ₹1.1 Cr | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹1.1 Cr+₹7,500 (0.07%)Rejected-AOC | ₹1.1 Cr+₹7,500 (0.07%) | L2 | Rejected-AOC Not L1 biider |
| 3 | L3₹1.1 Cr+₹3.9 L (3.58%)Rejected-AOC | ₹1.1 Cr+₹3.9 L (3.58%) | L3 | Rejected-AOC Not L1 biider |
| 4 | L4₹1.2 Cr+₹12.3 L (11.4%)Rejected-AOC | ₹1.2 Cr+₹12.3 L (11.4%) | L4 | Rejected-AOC Not L1 biider |
| 5 | Rejected-Technical | - | - | Rejected-Technical Non-Responsive |
| Sl No | Description | Qty | Unit | M/s Success Impex Pvt Ltd L4 | NIBEDITA ENGINEERING L2 | NORTH EAST AGENCY PVT LTD L3 | POWER INDIA CONSTRUCTION L1 |
|---|---|---|---|---|---|---|---|
| 1.01 | Supply (1kWp-4kWp) | 109 | kWp | 45,000 ₹49,05,000 | 38,500 ₹41,96,500 | 35,300 ₹38,47,700 Lowest | 47,000 ₹51,23,000 |
| 2.01 | Installation (1kWp-4kWp) | 109 | kWp | 10,000 ₹10,90,000 | 10,000 ₹10,90,000 | 18,400 ₹20,05,600 | 4,000 ₹4,36,000 Lowest |
| 3.01 | CMC (1kWp-4kWp) | 109 | kWp | 5,000 ₹5,45,000 | 5,000 ₹5,45,000 | 646 ₹70,414 Lowest | 1,000 ₹1,09,000 |
| 5.01 | Supply (Above 4kWp) | 104 | kWp | 39,296.65 ₹40,86,851.6 | 36,000 ₹37,44,000 | 34,000 ₹35,36,000 Lowest | 44,000 ₹45,76,000 |
| 6.01 | Installation (Above 4kWp) | 104 | kWp | 7,859.33 ₹8,17,370.32 | 6,500 ₹6,76,000 | 15,600 ₹16,22,400 | 4,000 ₹4,16,000 Lowest |
| 7.01 | CMC (Above 4kWp) | 104 | kWp | 5,239.55 ₹5,44,913.2 | 5,000 ₹5,20,000 | 650 ₹67,600 Lowest | 1,000 ₹1,04,000 |
Tender Value
₹1.2 Cr
EMD Value
₹3.8 L
Closing Date
7 Jan 2026, 3:00 pmClosed
CGM NRE
O/o the CGM(NRE) Annex Building, Bijulee Bhawan, Paltanbazar, Ghy-781001
Implementation of On-Grid Solar Power Plants at different PM-SHRI Schools (Phase-III) Under Samagra Shiksha, Assam
2025_APDCL_49044_1
APDCL/CGM (NRE)/PMSHRI-III/Package-I
Open Tender
Electrical Works
Turn-key
Guwahati
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹3.8 L
Conference Room, O/o the CGM (NRE)
11 May 2026
5 Dec 2025
8 Jan 2026
5 Dec 2025
7 Jan 2026
17 Dec 2025
5 Dec 2025 - 11 Dec 2025
12 Dec 2025
Supply (1kWp-4kWp)
Installation (1kWp-4kWp)
CMC (1kWp-4kWp)
Supply (Above 4kWp)
Installation (Above 4kWp)
CMC (Above 4kWp)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
Bid_Documents_PM_SHRIPhase-III.pdf
Tender Documents • 5.17 MB
BOQ_77851.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .