| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹87.4 LAccepted-AOC NO 5 R E NAGAR 1ST STREET PORUR CHENNAI 116 | CHENNAI | CHENNAI | TAMIL NADU | 600116 | ₹87.4 L Quoted ₹88.9 L | L1 | Accepted-AOC Agreement accepted by SE |
| 2 | L2₹91.0 LRejected-Finance NO 1A 41 SUB LANE 1 PARAMATHI ROAD NAMAKKAL 637 001 | NAMAKKAL | TAMIL NADU | 637001 | ₹91.0 L | L2 | Rejected-Finance Second lowest tenderer for L2 |
| 3 | L3₹92.0 LRejected-Finance | ₹92.0 L | L3 | Rejected-Finance Third lowest tenderer for L3 |
| Sl No | Description | Qty | Unit | P.Arun L1 | KSR ASSOCIATES L2 | Shri Jayam Construction L3 |
|---|---|---|---|---|---|---|
| 1.00 | Charges Supplying, fixing and removing of barricading arrangements using 10 to 13 cm Casurina Props of tying 60cm below ground level fixing and 2.10m above ground level fixing and 5 to 8 cm dia Casurina Props five rows horizontally 0.45m above ground level and tying with new coir rope and removing the all materials after the counting is over. | 2,306 | Rmt | 230 ₹5.3 L | 245 ₹5.6 L | 250 ₹5.8 L |
| 1.01 | Hire Charges of above materials for 3 days | 530 | Rmt | 70 ₹37,100 | 72 ₹38,160 | 72 ₹38,160 |
| 1.02 | Hire Charges of above materials for 16 Days | 1,776 | Rmt | 370 ₹6.6 L | 383 ₹6.8 L | 386 ₹6.9 L |
| 2.00 | Charges for Supplying, fixing and removing of barricading arrangements using 10 to 13 cm dia Casurina Props 3.60m height vertically @ 75cm c/c and tied horizontally with same casurina props 5 rows tying with new coir rope and removing the same after counting is over. | 186 | Rmt | 340 ₹63,240 | 352 ₹65,472 | 355 ₹66,030 |
| 2.01 | Hire Charges of above materials for 16 Days | 186 | Rmt | 530 ₹98,580 | 549 ₹1.0 L | 554 ₹1.0 L |
| 3.00 | Charges for Supplying, erection and removing for G.I Temporary Shed using Casurina props vertically and tied horizontally at top for purlins and fixing GI sheet above the purlins etc., complete complying with standard specifications. | 2,523 | Sq.m | 230 ₹5.8 L | 233 ₹5.9 L | 235 ₹5.9 L |
| 3.01 | Hire Charges of above materials for 3 Days | 1,500 | Sq.m | 45 ₹67,500 | 44 ₹66,000 | 44 ₹66,000 |
| 3.02 | Hire Charges of above materials for 16 Days | 1,023 | Sq.m | 230 ₹2.4 L | 233 ₹2.4 L | 235 ₹2.4 L |
| 4.00 | Charges for Supplying, erection and removing View Cutter arrangements using Temporary GI sheet and Casurina props vertically and tied Horizontally at top for Purlins and fixing GI sheet above the purlins etc., complete complying with standard specification. | 3,422.1 | Sq.m | 190 ₹6.5 L | 189 ₹6.5 L | 191 ₹6.5 L |
| 4.01 | Hire Charges of above materials for 16 Days | 3,422.1 | Sq.m | 140 ₹4.8 L | 141 ₹4.8 L | 143 ₹4.9 L |
Tender Value
₹88.2 L
EMD Value
₹54,100
Closing Date
8 Apr 2026, 3:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer, PWD., Building Construction and Maintenance Circle, Thanjavur-1
Providing Safety Barricading Arrangements to Strong Room sealing Room and Counting Hall for Gerneral Election to Tamil Nadu Legislative Assembly for 155 Cuddalore and 156 Kurinjipadi Assembly Constituency at Devanampattinam
2026_PWD_675504_2
98-2-2025-2026
Open Tender
Civil Works - Buildings
30 days
Devanampattinam
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹54,100
8 May 2026
4 Apr 2026
9 Apr 2026
4 Apr 2026
8 Apr 2026
4 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Charges Supplying, fixing and removing of barricading arrangements using 10 to 13 cm Casurina Props of tying 60cm below ground level fixing and 2.10m above ground level fixing and 5 to 8 cm dia Casurina Props five rows horizontally 0.45m above ground level and tying with new coir rope and removing the all materials after the counting is over. | |||||
| 1.01 | Hire Charges of above materials for 3 days | - | Rmt | - | - |
| 1.02 | Hire Charges of above materials for 16 Days | - | Rmt | - | - |
| 2Charges for Supplying, fixing and removing of barricading arrangements using 10 to 13 cm dia Casurina Props 3.60m height vertically @ 75cm c/c and tied horizontally with same casurina props 5 rows tying with new coir rope and removing the same after counting is over. | |||||
| 2.01 | Hire Charges of above materials for 16 Days | - | Rmt | - | - |
| 3Charges for Supplying, erection and removing for G.I Temporary Shed using Casurina props vertically and tied horizontally at top for purlins and fixing GI sheet above the purlins etc., complete complying with standard specifications. | |||||
| 3.01 | Hire Charges of above materials for 3 Days | - | Sq.m | - | - |
| 3.02 | Hire Charges of above materials for 16 Days | - | Sq.m | - | - |
| 4Charges for Supplying, erection and removing View Cutter arrangements using Temporary GI sheet and Casurina props vertically and tied Horizontally at top for Purlins and fixing GI sheet above the purlins etc., complete complying with standard specification. | |||||
| 4.01 | Hire Charges of above materials for 16 Days | - | Sq.m | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
BOQ_811869.xls
BOQ • 0.42 MB
DEVANAMPATTINAMCON.pdf
Tender Documents • 2.20 MB
Download all tender documents and submit your bid