| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.7 LAccepted-AOC | ₹16.7 L | L1 | Accepted-AOC AOC |
| 2 | L2₹17.6 LRejected-Finance | ₹17.6 L | L2 | Rejected-Finance Rejected Being Higher Rates |
| 3 | L3₹17.9 LRejected-Finance | ₹17.9 L | L3 | Rejected-Finance Rejected Being Higher Rates |
| 4 | L4₹18.2 LRejected-Finance S 10 2 1 L RAM SINGH KATRA HUKULGANJ VARANASI | VARANASI | UTTAR PRADESH | ₹18.2 L | L4 | Rejected-Finance Rejected Being Higher Rates |
| 5 | L5₹18.3 LRejected-Finance 4 4 VIKAS NAGAR LUCKNOW U P | LUCKNOW | LUCKNOW | UTTAR PRADESH | ₹18.3 L | L5 | Rejected-Finance Rejected Being Higher Rates |
Tender Value
₹22 L
EMD Value
₹2.2 L
Closing Date
13 Mar 2026, 12:00 pmClosed
Executive Engineer PD PWD Lucknow
Office of the Executive Engineer PD PWD Lucknow
Maintenance work of office building of Superintending Engineer - National Highway and Executive Engineer Construction Division-1 and 2 Lucknow
2026_CEUCZ_1122615_1
1179/E-Tender/2025-26 Dt 16.02.2026
Open Tender
Civil Works - Buildings
90 days
Lucknow
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹2.2 L
Office of the Executive Engineer PD PWD Lucknow
6 May 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
7 Mar 2026
Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : Of area 3 sq. metres and below
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar
Dismantling expanded metal or I.R.C. fabrics with necessary battens and beading including stacking the serviceable material within 50 metres lead.
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chanas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1: 1.5:3 (1 cement : 1.5 coarse sand(zone-111) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in: Cement mortar 1 :4 (1 cement : 4 coarse sand)
Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
CEMENT PLASTER (IN COARSE SAND) 15 mm cement plaster on rough side of single or half brick wall of mix: 13.5.1 1:4 (1 cement: 4 coarse sand)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-5000 or more.
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Providing and laying flamed finish Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1 :4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement sluny admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge : Flamed finish granite stone slab Jet Black, Cheny Red, Elite Brown, Cat Eye or equivalent.
Providing edge moulding to 18 mm thick granite stone counters, vanities etc., including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-Charge. Granite work.
Extra for marble stone flooring in treads of steps and risers using single length up to 2.00 metre.
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.
Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm)
Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding.
Providing and fixing Scaffolding net of required width made of high density Polyethylene UV stabilized knitted on warp knitting machines having density 100 gram / sqm and shading coefficient minimum 75%around the construction site/ for vertical extension as per requirement including fastening/tying with building/scaffolding pipes or with any other fixtures etc. complete as per direction of Engineer-in-Charge. (One time payment shall be made for providing Scaffolding net from start of work till completion of work including shifting if any. The Scaffolding net shall be the property of the contractor on completion of the work)
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.45 MB
T1.pdf
Tender Documents • 2.09 MB
BOQ_2090646.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid