Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 CrAccepted-Finance | ₹7.0 Cr | L1 | Accepted-Finance Being L1 |
| 2 | L2₹7.9 Cr+₹90.5 L (13.0%)Rejected-Finance 261 BHARAT NAGAR BATHINDA PB 151001 | BATHINDA | BATHINDA | PUNJAB | 151001 | ₹7.9 Cr+₹90.5 L (13.0%) | L2 | Rejected-Finance Being other than L1 |
| 3 | L3₹8.1 Cr+₹1.2 Cr (16.7%)Rejected-Finance 32 PANCHWATI NAGAR BATHINDA PUNJAB 151001 | BATHINDA | BATHINDA | PUNJAB | 151001 | ₹8.1 Cr+₹1.2 Cr (16.7%) | L3 | Rejected-Finance Being other than L1 |
| 4 | L4₹8.2 Cr+₹1.2 Cr (17.4%)Rejected-Finance I 910 JAHANGIR PURI NEAR BY ANAND MAYA HOSPITAL NORTH WEST DELHI DELHI 110033 UDYAM DL 06 0040830 | NORTH DELHI | DELHI | 110033 | ₹8.2 Cr+₹1.2 Cr (17.4%) | L4 | Rejected-Finance Being other than L1 |
| 5 | L5₹8.3 Cr+₹1.3 Cr (19.2%)Rejected-Finance 583 URBAN ESTATE II HISAR 125005 | HISAR | HISAR | HARYANA | 125005 | ₹8.3 Cr+₹1.3 Cr (19.2%) | L5 | Rejected-Finance Being other than L1 |
| Sl No | Description | Qty | Unit | Siya constructions L5 | SOM BUILDERS L1 | GEMINI PROMOTERS AND BUILDERS PVT. LTD. L3 | M/s DMR Builders Pvt Ltd L8 | SATISH AND CO L4 | Surindera Kumar Bansal L2 | Adhunik Builders L7 | SPAAN Infratech L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Surface excavation not exceeding 30 cm deep and averaging 15 cm deep and getting out in soft/ loose soil complete all as specified and as directed. | 4,950 | Sqm | 5 ₹24,750 Lowest | 25 ₹1,23,750 | 46 ₹2,27,700 | 40 ₹1,98,000 | 30 ₹1,48,500 | 15 ₹74,250 | 25 ₹1,23,750 | 46 ₹2,27,700 |
| 2.00 | Excavating in trenches not exceeding 1.5 m wide and not exceeding 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. or for cable laying or not exceeding 10 sqm on plan and not exceeding 1.5 m in depth and getting out in soft/ loose soil complete all as specified and as directed. | 710 | Cum | 125 ₹88,750 | 85 ₹60,350 Lowest | 138 ₹97,980 | 150 ₹1,06,500 | 250 ₹1,77,500 | 150 ₹1,06,500 | 250 ₹1,77,500 | 450 ₹3,19,500 |
| 3.00 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25 cm in soft/ loose/ hard/ dense soil complete all as specified and as directed. | 421.75 | Cum | 40 ₹16,870 Lowest | 45 ₹18,978.75 | 83 ₹35,005.25 | 90 ₹37,957.5 | 80 ₹33,740 | 60 ₹25,305 | 220 ₹92,785 | 250 ₹1,05,437.5 |
| 4.00 | Excavating in post holes (or similar holes) each not exceeding 0.5 cum, getting out in soft/ loose soil, returning, filling in and ramming earth or broken rubble mixed with earth around, in layers not exceeding 25 cm, watering and removing surplus soil to a distance not exceeding 50 m and making good surface complete all as specified and as directed. | 200 | Each | 120 ₹24,000 Lowest | 120 ₹24,000 Lowest | 138 ₹27,600 | 300 ₹60,000 | 150 ₹30,000 | 120 ₹24,000 Lowest | 450 ₹90,000 | 210 ₹42,000 |
| 5.00 | Surface dressing not exceeding 15 cm deep in soft/ loose soil complete all as specified and as directed. | 400 | Sqm | 12 ₹4,800 Lowest | 22 ₹8,800 | 46 ₹18,400 | 25 ₹10,000 | 25 ₹10,000 | 12 ₹4,800 Lowest | 50 ₹20,000 | 26 ₹10,400 |
| 6.00 | M & L for sand filling under floors or in foundations including watering and consolidation complete all as specified and as directed. | 38.25 | Cum | 240 ₹9,180 Lowest | 650 ₹24,862.5 | 1,380 ₹52,785 | 1,500 ₹57,375 | 850 ₹32,512.5 | 600 ₹22,950 | 650 ₹24,862.5 | 1,750 ₹66,937.5 |
| 7.00 | Supply & spreading in trenches dry river/ natural sand cushioning to underground cable in trenches including spreading, levelling, hand punning down complete all as specified and as directed. Note:- Depth of sand cushioning will be measured after punning down and levelling the sand properly. | 18 | Cum | 800 ₹14,400 | 650 ₹11,700 | 2,024 ₹36,432 | 2,200 ₹39,600 | 850 ₹15,300 | 500 ₹9,000 Lowest | 650 ₹11,700 | 1,750 ₹31,500 |
| 8.00 | Removing excavated material (soils) not exceeding 50 m and depositing where directed at a level n exc. 1.5 m above the starting point | 209 | Cum | 40 ₹8,360 Lowest | 75 ₹15,675 | 74 ₹15,466 | 80 ₹16,720 | 80 ₹16,720 | 60 ₹12,540 | 250 ₹52,250 | 350 ₹73,150 |
| 9.00 | Removing excavated material (soils) exceeding 250 m but not exceeding 500 m and depositing where directed at a level n exc. 1.5 m above the starting point complete all as specified and as directed. | 20 | Cum | 70 ₹1,400 Lowest | 95 ₹1,900 | 92 ₹1,840 | 100 ₹2,000 | 80 ₹1,600 | 90 ₹1,800 | 285 ₹5,700 | 520 ₹10,400 |
| 10.00 | M & L for hardcore (broken stone or boulders) of gauge not exceeding 63 mm, deposited, spread and levelled in layers not exceeding 15 cm thick, watered and rammed to a true surface complete all as specified and as directed. | 624 | Cum | 1,800 ₹11,23,200 | 1,450 ₹9,04,800 Lowest | 2,024 ₹12,62,976 | 2,900 ₹18,09,600 | 1,450 ₹9,04,800 Lowest | 1,600 ₹9,98,400 | 2,200 ₹13,72,800 | 3,500 ₹21,84,000 |
Tender Value
₹7.7 Cr
EMD Value
₹7.1 L
Closing Date
12 Jun 2026, 6:00 pmClosed
Chief Engineer
HQ CE Bathinda Zone, Bathinda Mil Stn-151004
SPECIAL REPAIR TO JCO/OR MD ACCN AT GURUNAM SINGH ENCLAVE AND CERTAIN SANCTIONED WORKS OF KV NO 1 AND KV NO 4 AT BATHINDA MILITARY STATION
2026_MES_766155_1
SPECIAL REPAIR TO JCO/OR MD ACCN AT GURUNAM SINGH ENCLAVE AND CERTAIN SANCTIONED WORKS OF KV NO 1 A
Open Tender
Civil Works - Others
Item Rate
180 days
GE (N and S) Bathinda
Please refer Tender documents.
8 documents required · 8 mandatory
₹3,000
GE (N) Bathinda
₹7.1 L
Yes
8 Jul 2026
18 May 2026
13 Jun 2026
18 May 2026
12 Jun 2026
30 May 2026
18 May 2026 - 2 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface excavation not exceeding 30 cm deep and averaging 15 cm deep and getting out in soft/ loose soil complete all as specified and as directed. | 4,950 | Sqm | - | - |
| 2 | Excavating in trenches not exceeding 1.5 m wide and not exceeding 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. or for cable laying or not exceeding 10 sqm on plan and not exceeding 1.5 m in depth and getting out in soft/ loose soil complete all as specified and as directed. | 710 | Cum | - | - |
| 3 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25 cm in soft/ loose/ hard/ dense soil complete all as specified and as directed. | 421.75 | Cum | - | - |
| 4 | Excavating in post holes (or similar holes) each not exceeding 0.5 cum, getting out in soft/ loose soil, returning, filling in and ramming earth or broken rubble mixed with earth around, in layers not exceeding 25 cm, watering and removing surplus soil to a distance not exceeding 50 m and making good surface complete all as specified and as directed. | 200 | Each | - | - |
| 5 | Surface dressing not exceeding 15 cm deep in soft/ loose soil complete all as specified and as directed. | 400 | Sqm | - | - |
| 6 | M & L for sand filling under floors or in foundations including watering and consolidation complete all as specified and as directed. | 38.25 | Cum | - | - |
| 7 | Supply & spreading in trenches dry river/ natural sand cushioning to underground cable in trenches including spreading, levelling, hand punning down complete all as specified and as directed. Note:- Depth of sand cushioning will be measured after punning down and levelling the sand properly. | 18 | Cum | - | - |
| 8 | Removing excavated material (soils) not exceeding 50 m and depositing where directed at a level n exc. 1.5 m above the starting point | 209 | Cum | - | - |
| 9 | Removing excavated material (soils) exceeding 250 m but not exceeding 500 m and depositing where directed at a level n exc. 1.5 m above the starting point complete all as specified and as directed. | 20 | Cum | - | - |
| 10 | M & L for hardcore (broken stone or boulders) of gauge not exceeding 63 mm, deposited, spread and levelled in layers not exceeding 15 cm thick, watered and rammed to a true surface complete all as specified and as directed. | 624 | Cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
BOQ_858054.xls
BOQ • 0.48 MB
TenderDocuments84580.pdf
Tender Documents • 1.37 MB
corrigendum03.pdf
PDF • 0.18 MB
corrigendum01.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .