Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.1 LAccepted-AOC | ₹3.1 L Quoted ₹2.9 L | 1 | Accepted-AOC L1 |
| 2 | 2₹3.0 LRejected-AOC 3 140 H 1 PERIYAR STREET AMMAN NAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | ₹3.0 L | 2 | Rejected-AOC L2 |
| 3 | 3₹3.1 LRejected-AOC 2 222 B 10 PONMAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | ₹3.1 L | 3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | SS ENGINEERING CONTRACTOR L2 | SRINIVASA ENGINEERING CONTRACTORS L1 | PREETHI ENTERPRISES L3 |
|---|---|---|---|---|---|---|
| 1.00 | Charges for de-watering of clarifier, mixing the mud / fine sludge deposits with water while de-watering in clarifier of size 18 M radius x 6.5 M depth. | 1 | No | 15,850 ₹15,850 | 15,150 ₹15,150 Lowest | 15,860 ₹15,860 |
| 2.00 | Charges for removing sludge and other foreign particles from the clarifier of size 18 M x 6.5 M depth. | 1 | No | 23,750 ₹23,750 | 23,300 ₹23,300 Lowest | 23,800 ₹23,800 |
| 3.00 | Charges for cleaning the algae deposits on the side walls of both inner and outer rings of clarifier and bottom surface with coir/wire brush. Applying and cleaning with bleaching powder on both side walls of inner ring & outer rings and also at bottom surface in clarifier of size 18 M x 6.5M depth | 1 | No | 23,750 ₹23,750 | 23,300 ₹23,300 Lowest | 23,800 ₹23,800 |
| 4.00 | Charges for de-watering of sludge disposal pit, removal of sludge from sludge disposal pit, and also tunnel pipes from clarifier to sludge pit. Cleaning of algae deposits with coir / wire brush, and applying & cleaning with bleaching powder on inside walls of sludge pit, flash mixing chamber. | 1 | No | 10,550 ₹10,550 | 10,350 ₹10,350 Lowest | 10,600 ₹10,600 |
| 5.00 | Charges for removing the rust and old paint from the structure immersed in the water of clarifier and above the water level exposed to atmosphere , inlet and outlet valves exposed to atmosphere of clarifier-I. | 410 | M2 | 38 ₹15,580 | 37 ₹15,170 Lowest | 39 ₹15,990 |
| 6.00 | Charges for painting with one coat of rust convertor (Impodex / Impodor), one coat of epoxy red oxide primer and one coat of epoxy coal thar black paint one over the other with proper intervals for clarifier structures immersed in the water Clarifier inlet & outlet valves, one coat of epoxy red oxide primer and two coats of epoxy coal thar black paint on the surface of the flash mixer chamber and its hand rails & supports, one coat of epoxy red oxide primer and two coats of epoxy smoke grey one over the other with proper intervals for clarifier structures above the water level exposed to atmosphere, one coat of epoxy red oxide primer and two coats of epoxy sea green on the surface of the raw water line to clarifier, raw water common inlet line to clarifier I&II. | 436 | M2 | 238 ₹1,03,768 | 233 ₹1,01,588 Lowest | 240 ₹1,04,640 |
| 7.00 | Hire charges for heavy machineries (Poclain cum Bull dozer) to clean the bushes, accumulated dry leaves, tree branches & other cleanable things in and around the clarifier I & II area, cooling tower I & II area & other mentioned area as directed by site in charge and moving the cleaned bushes, dry leaves, tree branches & others in to an open area. | 12 | hours | 2,800 ₹33,600 | 2,600 ₹31,200 Lowest | 2,900 ₹34,800 |
| 8.00 | Cost of Rust Convertor for Sl.No.6 | 39 | kgs | 210 ₹8,190 | 200 ₹7,800 Lowest | 220 ₹8,580 |
| 9.00 | Cost of Epoxy red oxide Primer for Sl.No.6 | 48 | liters | 260 ₹12,480 | 250 ₹12,000 Lowest | 270 ₹12,960 |
| 10.00 | Cost of Coal Tar Black Paint for Sl.No.6 | 40 | liters | 260 ₹10,400 | 250 ₹10,000 Lowest | 270 ₹10,800 |
Tender Value
Refer Docs
EMD Value
₹3,000
Closing Date
3 Feb 2026, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I M I CA CWS I Dewatering complete cleaning and sludge removal Cleaning with bleaching powder painting the structure of Clarifier I during AOH 2026 27
2026_EB_644884_1
CE / MTPS-I / SE / M-I / CA /OT.453/ 2025 - 26
Open Tender
Power/Energy Projects/Products
Works
15 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹3,000
Yes
30 Jul 2026
20 Jan 2026
4 Feb 2026
20 Jan 2026
3 Feb 2026
20 Jan 2026
Charges for de-watering of clarifier, mixing the mud / fine sludge deposits with water while de-watering in clarifier of size 18 M radius x 6.5 M depth.
Charges for removing sludge and other foreign particles from the clarifier of size 18 M x 6.5 M depth.
Charges for cleaning the algae deposits on the side walls of both inner and outer rings of clarifier and bottom surface with coir/wire brush. Applying and cleaning with bleaching powder on both side walls of inner ring & outer rings and also at bottom surface in clarifier of size 18 M x 6.5M depth
Charges for de-watering of sludge disposal pit, removal of sludge from sludge disposal pit, and also tunnel pipes from clarifier to sludge pit. Cleaning of algae deposits with coir / wire brush, and applying & cleaning with bleaching powder on inside walls of sludge pit, flash mixing chamber.
Charges for removing the rust and old paint from the structure immersed in the water of clarifier and above the water level exposed to atmosphere , inlet and outlet valves exposed to atmosphere of clarifier-I.
Charges for painting with one coat of rust convertor (Impodex / Impodor), one coat of epoxy red oxide primer and one coat of epoxy coal thar black paint one over the other with proper intervals for clarifier structures immersed in the water Clarifier inlet & outlet valves, one coat of epoxy red oxide primer and two coats of epoxy coal thar black paint on the surface of the flash mixer chamber and its hand rails & supports, one coat of epoxy red oxide primer and two coats of epoxy smoke grey one over the other with proper intervals for clarifier structures above the water level exposed to atmosphere, one coat of epoxy red oxide primer and two coats of epoxy sea green on the surface of the raw water line to clarifier, raw water common inlet line to clarifier I&II.
Hire charges for heavy machineries (Poclain cum Bull dozer) to clean the bushes, accumulated dry leaves, tree branches & other cleanable things in and around the clarifier I & II area, cooling tower I & II area & other mentioned area as directed by site in charge and moving the cleaned bushes, dry leaves, tree branches & others in to an open area.
Cost of Rust Convertor for Sl.No.6
Cost of Epoxy red oxide Primer for Sl.No.6
Cost of Coal Tar Black Paint for Sl.No.6
Cost of Epoxy Thinner for Sl.No.6
Cost of Epoxy Sea Green paint for SL.No.6
Cost of Epoxy Smoke Grey paint for SL.No.6.
Cost of Stable Bleaching Powder for Sl.No.3&4
Cost of Consumable and T&P for Sl.No.1 to 6
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BOQ_772800.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].