| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.9 CrAccepted-AOC PLOT NO 10 1ST FLOOR MARUTHI NAGAR HOSUR KRISHNAGIRI 635 109 | HOSUR | KRISHNAGIRI | TAMIL NADU | 635109 | L1 | Accepted-AOC Financially Qualified | |
| 2 | L2₹15.9 Cr+₹1.0 Cr (6.84%)Rejected-Finance KOODUTHURAIPATTI KONGARAPATTI PO HARUR TK DHARMAPURI DISTRICT | L2 | Rejected-Finance Financially Not
Qualified | |
| 3 | L3₹22.3 Cr+₹7.4 Cr (49.9%)Rejected-Finance | L3 | Rejected-Finance Financially Not
Qualified | |
| 4 | L4₹45.3 Cr+₹30.5 Cr (204.7%)Rejected-Finance R MUTHUSAMY BROTHERS INDUSTRIAL COMPLEX T S NO 6 2 PALLADAM ROAD TIRUPPUR 641 604 | TIRUPPUR | TIRUPPUR | TAMIL NADU | 641604 | L4 | Rejected-Finance Financially Not
Qualified |
| Sl No | Description | Qty | Unit | Siva Engineering Company | VEDIAPPAN | DWARAKA ENGINEERING CONSTRUCTION PRIVATE LIMITED | Pranaav Enterprises |
|---|---|---|---|---|---|---|---|
| 1.00Annexure Price Bid | |||||||
| 2.00 | Clearing Heavy Jungle in the proposed site and removal of the debris away from the site as shown by the ELCOT / PMC officials including necessary tools and plants wherever required complete in all respects as directed by ELCOT officials. | 1,52,162 | Sqm | 13,96,847.16 ₹13,96,847.16 | 13,69,458 ₹13,69,458 Lowest | 45,64,860 ₹45,64,860 | 16,73,782 ₹16,73,782 |
| 3.00Earth work excavation MR-&-DMR (Not Requiring Blasting) and depositing on bank with initial lead of 10 m & initial lift of 2m in medium rock and dense medium rock not requiring blasting and refilling the same includes cost of materials tools and plants, equipments, mobilizing, transfering from one place to another with all accessories and operating all the tools and plants for secondary braking, watering, excavating the rock portion including lifting, loading and using electricity power or diesel generator, conveyance and depositing the same away from the work site at a required distance from the excavated area and without obstruction to the work as specified by ELCOT officials. with an initial lead of 10m and initial lift of 2m including all incidental charges, fuel charges to all machines, hire charges, crew charges completely compiling with standard specifications and as directed by ELCOT officials. | |||||||
| 3.10 | Plot no.16 - 10.51 acres | 65,000 | cum | 1,85,25,000 ₹1,85,25,000 | 81,25,000 ₹81,25,000 Lowest | 87,75,000 ₹87,75,000 | 2,67,80,000 ₹2,67,80,000 |
| 3.20 | Plot no.7 - 10.01 acre | 45,000 | cum | 1,28,25,000 ₹1,28,25,000 | 56,25,000 ₹56,25,000 Lowest | 60,75,000 ₹60,75,000 | 1,85,17,500 ₹1,85,17,500 |
| 3.30 | Plot no.10 & 11 2nd phase
8.00 acre | 45,000 | cum | 1,28,25,000 ₹1,28,25,000 | 56,25,000 ₹56,25,000 Lowest | 60,75,000 ₹60,75,000 | 1,85,26,500 ₹1,85,26,500 |
| 3.40 | Plot no.7 2nd phase - 4.00
acre | 20,000 | cum | 57,00,000 ₹57,00,000 | 25,00,000 ₹25,00,000 Lowest | 27,00,000 ₹27,00,000 | 83,00,000 ₹83,00,000 |
| 3.50 | Plot no.12 & 13 - 5.00 acre | 25,000 | cum | 71,25,000 ₹71,25,000 | 31,25,000 ₹31,25,000 Lowest | 33,75,000 ₹33,75,000 | 1,03,12,500 ₹1,03,12,500 |
| 4.00Earth Work Excavation in hard rocks /boulders by controlled blasting as shown by the ELCOT / PMC officials The rate includes cost of materials tools and plants, equipments, mobilizing, transfering from one place to another with all accessories and operating all the tools and plants for secondary braking, watering, excavating the rock portion including lifting, loading and using electricity power or diesel generator, conveyance and depositing the same away from the work site at a required distance from the excavated area and without obstruction to the work as specified by ELCOT officials. with an initial lead of 10m and initial lift of 2m including all incidental charges, fuel charges to all machines, hire charges, crew charges completely compiling with standard specifications and as directed by ELCOT officials. | |||||||
| 4.10 | Plot no.16 - 10.51 acres | 54,720 | cum | 12,58,56,000 ₹12,58,56,000 | 4,21,34,400 ₹4,21,34,400 | 3,72,09,600 ₹3,72,09,600 Lowest | 4,40,82,432 ₹4,40,82,432 |
Tender Value
Refer Docs
EMD Value
₹8 L
Closing Date
6 Mar 2026, 3:00 pmClosed
Managing Director, ELCOT
9th Floor, Sigapi Achi Building, No.18/3, Rukmani Lakshmipathy Road, Egmore
Blasting of Rocks in ELCOT IT Park, Hosur
2026_ELCO_651699_1
ELCOT-ST-ITP-HSR-2026-0008
Open Tender
Civil Works
Lump-sum
Hosur
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹8 L
Egmore
14 Mar 2026
5 Feb 2026
6 Mar 2026
5 Feb 2026
6 Mar 2026
27 Feb 2026
17 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Annexure Price Bid | |||||
| 2 | Clearing Heavy Jungle in the proposed site and removal of the debris away from the site as shown by the ELCOT / PMC officials including necessary tools and plants wherever required complete in all respects as directed by ELCOT officials. | 1,52,162 | Sqm | 65 | ₹98,90,530 |
| 3Earth work excavation MR-&-DMR (Not Requiring Blasting) and depositing on bank with initial lead of 10 m & initial lift of 2m in medium rock and dense medium rock not requiring blasting and refilling the same includes cost of materials tools and plants, equipments, mobilizing, transfering from one place to another with all accessories and operating all the tools and plants for secondary braking, watering, excavating the rock portion including lifting, loading and using electricity power or diesel generator, conveyance and depositing the same away from the work site at a required distance from the excavated area and without obstruction to the work as specified by ELCOT officials. with an initial lead of 10m and initial lift of 2m including all incidental charges, fuel charges to all machines, hire charges, crew charges completely compiling with standard specifications and as directed by ELCOT officials. | |||||
| 3.1 | Plot no.16 - 10.51 acres | 65,000 | cum | 65 | ₹42,25,000 |
| 3.2 | Plot no.7 - 10.01 acre | 45,000 | cum | 65 | ₹29,25,000 |
| 3.3 | Plot no.10 & 11 2nd phase
8.00 acre | 45,000 | cum | 75 | ₹33,75,000 |
| 3.4 | Plot no.7 2nd phase - 4.00
acre | 20,000 | cum | 65 | ₹13,00,000 |
| 3.5 | Plot no.12 & 13 - 5.00 acre | 25,000 | cum | 75 | ₹18,75,000 |
| 4Earth Work Excavation in hard rocks /boulders by controlled blasting as shown by the ELCOT / PMC officials The rate includes cost of materials tools and plants, equipments, mobilizing, transfering from one place to another with all accessories and operating all the tools and plants for secondary braking, watering, excavating the rock portion including lifting, loading and using electricity power or diesel generator, conveyance and depositing the same away from the work site at a required distance from the excavated area and without obstruction to the work as specified by ELCOT officials. with an initial lead of 10m and initial lift of 2m including all incidental charges, fuel charges to all machines, hire charges, crew charges completely compiling with standard specifications and as directed by ELCOT officials. | |||||
| 4.1 | Plot no.16 - 10.51 acres | 54,720 | cum | 65 | ₹35,56,800 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
TenderDocument.pdf
Tender Documents • 0.97 MB
BOQ_781485.xls
BOQ • 0.42 MB
PrebidResponse1.pdf
PDF • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .