Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹53.5 LAccepted-AOC 112 21 A 2 K N MUKHERJEE ROAD P O TALPUKUR BARRACKPORE 24 PGS N | 24 PARAGANAS NORTH | WEST BENGAL | 700028 | ₹53.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹54.1 L+₹59,248 (1.11%)Rejected-Finance | ₹54.1 L+₹59,248 (1.11%) | L2 | Rejected-Finance L2 |
| 3 | L3₹55.7 L+₹2.2 L (4.02%)Rejected-Finance 159 KAILASH GHOSHI ROAD KOLKATA WEST BENGAL 700008 | KOLKATA | KOLKATA | WEST BENGAL | 700008 | ₹55.7 L+₹2.2 L (4.02%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | POWER INDIA L3 | MIK ENTERPRISES L1 | PASS TREAT L2 |
|---|---|---|---|---|---|---|
| 1.00Round the clock operation & maintenance of Clear Water Pumping Station of capacity 46200 cum/day along with 6KV substation located within Padmapukur Water Works under Howrah Municipal Corporation with adequate nos. of personnel for each month as per direction of EIC. | ||||||
| 1.01 | For the period of first year | 6 | Month | 1,35,400 ₹8,12,400 | 1,34,650 ₹8,07,900 Lowest | 1,35,000 ₹8,10,000 |
| 1.02 | For the period of second year | 12 | Month | 1,39,250 ₹16,71,000 | 1,39,230 ₹16,70,760 Lowest | 1,40,000 ₹16,80,000 |
| 1.03 | For the period of third year | 12 | Month | 1,43,820 ₹17,25,840 Lowest | 1,43,950 ₹17,27,400 | 1,45,000 ₹17,40,000 |
| 2.00Checking of all the mechanical parts and preventive maintenance of all pump machinery incld lifting dismantling and installation the same after removing the foreign materials from clogged pump internals as per technical specification and scope of work and direction of EIC.(Twice in a week) | ||||||
| 2.01 | For the period of first year | 52 | day | 1,320 ₹68,640 | 1,115 ₹57,980 Lowest | 1,150 ₹59,800 |
| 2.02 | For the period of second year | 104 | day | 1,380 ₹1,43,520 | 1,150 ₹1,19,600 Lowest | 1,175 ₹1,22,200 |
| 2.03 | For the period of third year | 104 | day | 1,400 ₹1,45,600 | 1,190 ₹1,23,760 Lowest | 1,225 ₹1,27,400 |
| 3.00Checking of all the electrical parts including Battery Bank and preventive maintenance of all the electrical machinery as per technical specification and scope of work and direction of EIC.((Twice in a week) | ||||||
| 3.01 | For the period of first year | 52 | day | 1,250 ₹65,000 | 1,120 ₹58,240 Lowest | 1,150 ₹59,800 |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
31 Jul 2026, 1:00 pmClosed
Executive Engineer, GAP-II, EM, KMDA
OFFICE OF THE EXECUTIVE ENGINEER (E/ M)/GAP-II 1/425, Gariahat Road(s), Kol-68
Round the clock Operation and Maintenance of Clear Water Pumping Station of capacity 46200 cum/day and along with 6KV substation located within Padmapukur Water Works under Howrah Municipal Corporation (for a period of 30 Months ).
2026_KMDA_1032437_1
EE(E/M)/GAP-II /KMDA/2W-19/2025-26/18 Date -01.07.2026
Open Tender
ELECTRICAL WORKS M/R
Item Rate
910 days
Padmapukur
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1.1 L
Office of the Executive Engineer, GAP II, EM, KMDA
7 Sept 2026
15 Jul 2026
3 Aug 2026
15 Jul 2026
31 Jul 2026
15 Jul 2026
21 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Round the clock operation & maintenance of Clear Water Pumping Station of capacity 46200 cum/day along with 6KV substation located within Padmapukur Water Works under Howrah Municipal Corporation with adequate nos. of personnel for each month as per direction of EIC. | |||||
| 1.01 | For the period of first year | - | Month | - | - |
| 1.02 | For the period of second year | - | Month | - | - |
| 1.03 | For the period of third year | - | Month | - | - |
| 2Checking of all the mechanical parts and preventive maintenance of all pump machinery incld lifting dismantling and installation the same after removing the foreign materials from clogged pump internals as per technical specification and scope of work and direction of EIC.(Twice in a week) | |||||
| 2.01 | For the period of first year | - | day | - | - |
| 2.02 | For the period of second year | - | day | - | - |
| 2.03 | For the period of third year | - | day | - | - |
| 3Checking of all the electrical parts including Battery Bank and preventive maintenance of all the electrical machinery as per technical specification and scope of work and direction of EIC.((Twice in a week) | |||||
| 3.01 | For the period of first year | - | day | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
Docs7_GAP2.pdf
Tender Documents • 1.21 MB
BOQ_2535446.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .