Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC | L1 | Accepted-AOC 1st Lowest | |
| 2 | L2₹5.3 L+₹38,878.85 (7.85%)Rejected-Finance M NO 375 VIDYANAGAR HARTHALA SONAKPUR MORADABAD | MORADABAD | MORADABAD | UTTAR PRADESH | L2 | Rejected-Finance 2nd | |
| 3 | L3₹5.6 L+₹63,421.32 (12.8%)Rejected-Finance | L3 | Rejected-Finance 3rd | |
| 4 | L4₹5.8 L+₹85,059.20 (17.2%)Rejected-Finance | L4 | Rejected-Finance 4th | |
| 5 | Rejected-Technical 1 BHRAHMANINAGAR HIMMATNAGAR VIJAPUR HIGHWAY OPPOSITE GHODA FARM SABARKANTHA GUJARAT 383001 | SABAR KANTHA | GUJARAT | 383001 | - | Rejected-Technical Non Responsive |
| Sl No | Description | Qty | Unit | VISHALA CIVIL CONTRACTORS AND MAINTENANCE L4 | M/S KUNWAR PAL CONTRACTOR L3 | V K CONTRACTOR L1 | M/S MALIK CONSTRUCTION L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in filling for making diversion in all type of soil i/c all lead & lift, dressing compaction etc. complete | 308 | M3 | 200 ₹61,600 | 190 ₹58,520 | 150 ₹46,200 | 100 ₹30,800 Lowest |
| 2.00 | Providing & Laying Ist class brick on edge soling 110 mm thick i/c cost of all material, labour, T&P etc complete | 99 | M2 | 430 ₹42,570 | 400 ₹39,600 | 370 ₹36,630 Lowest | 420 ₹41,580 |
| 3.00 | Dismantling brick masonry in lime or cement i/c stacking within 60m etc. complete | 26.84 | M3 | 380 ₹10,197.3 | 300 ₹8,050.5 | 250 ₹6,708.75 Lowest | 332 ₹8,909.22 |
| 4.00 | Dismantling R.B or R.C.C work i/c stacking within 60m etc. complete | 7.2 | M3 | 600 ₹4,320 | 500 ₹3,600 | 400 ₹2,880 Lowest | 503 ₹3,621.6 |
| 5.00 | Earth work in excavation of foundation i/c initial lead & lift etc. complete | 88.5 | M3 | 130 ₹11,505 | 133 ₹11,770.5 | 105 ₹9,292.5 Lowest | 122 ₹10,797 |
| 6.00 | Certering & shuttering for C.C. work i/c all cost of labour, material and T&P etc. complete | 20.58 | M2 | 200 ₹4,116 Lowest | 254 ₹5,227.32 | 220 ₹4,527.6 | 294 ₹6,050.52 |
| 7.00 | Providing & laying P.C.C 1:3:6 in foundation i/c all cost of labour, material, T&P etc. complete | 9.6 | M3 | 5,000 ₹48,000 | 4,800 ₹46,080 | 4,300 ₹41,280 Lowest | 4,735 ₹45,456 |
| 8.00 | M-100.Brick work in 1:4 C:M i/c all cost of labour, material, T&P etc. complete | 36.55 | M3 | 4,900 ₹1,79,095 | 4,400 ₹1,60,820 | 4,010 ₹1,46,565.5 Lowest | 4,553 ₹1,66,412.15 |
| 9.00 | Certering & shuttering for R.C.C. work i/c all cost of labour, material and T&P etc. complete | 20.28 | M2 | 600 ₹12,168 Lowest | 822 ₹16,670.16 | 615 ₹12,472.2 | 700 ₹14,196 |
| 10.00 | Providing & laying R.C.C (M-20)1:1.5:3 i/c all cost of labour, material, T&P etc. complete | 4.91 | M3 | 6,500 ₹31,915 | 7,000 ₹34,370 | 6,100 ₹29,951 | 6,060 ₹29,754.6 Lowest |
Tender Value
₹6.7 L
EMD Value
₹13,000
Closing Date
6 Nov 2025, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Office of the EE ID Moradabad
Office of the EE ID Moradabad
Reconstruction of VRB at Km 6.132 of Narayanpur Minor
2025_UPIDC_1086963_10
3646/IDMBD/Etender/2025 Dt 16.10.2025
Open Tender
Civil Works - Canal
Item Rate
25 days
Moradabad
As per NIT
2 documents required · 2 mandatory
₹677
₹13,000
1 Dec 2025
30 Oct 2025
6 Nov 2025
30 Oct 2025
6 Nov 2025
30 Oct 2025
Amount
Earth work in filling for making diversion in all type of soil i/c all lead & lift, dressing compaction etc. complete
Providing & Laying Ist class brick on edge soling 110 mm thick i/c cost of all material, labour, T&P etc complete
Dismantling brick masonry in lime or cement i/c stacking within 60m etc. complete
Dismantling R.B or R.C.C work i/c stacking within 60m etc. complete
Earth work in excavation of foundation i/c initial lead & lift etc. complete
Certering & shuttering for C.C. work i/c all cost of labour, material and T&P etc. complete
Providing & laying P.C.C 1:3:6 in foundation i/c all cost of labour, material, T&P etc. complete
M-100.Brick work in 1:4 C:M i/c all cost of labour, material, T&P etc. complete
Certering & shuttering for R.C.C. work i/c all cost of labour, material and T&P etc. complete
Providing & laying R.C.C (M-20)1:1.5:3 i/c all cost of labour, material, T&P etc. complete
S/P steel reinforcement for R.C.C work i/c all cost of material,labour, cutting, bending, binding etc.. Complete
Providing & laying P.C.C 1:6:12 i/c all cost of labour, material, T&P etc. complete
P/L struk deep pointing in 1:2 C;M i/c all cost of labour, material, T&P etc. complete
S/F Drainage spout P.V.C 75 mm dia pipe i/c all cost of labour, material, T&P etc. complete
S/F 25 mm thick expension joints i/c all cost of labour, material, T&P etc. complete
S/Laying Tar felt in 3 layer for bearing slab i/c all cost of labour, material, T&P etc. complete
S/Laying wheel guard stone i/c all cost of labour, material, T&P etc. complete
Dismantling Ist class brick on edge soling 110 mm thick i/c all cost of labour, material, T&P etc. complete
Earth work in removing diversion with initial lead & lift i/c all cost of labour, material, T&P etc. complete
P/Laying C.C (M-20)1:1.5:3 in wearing coat i/c all cost of labour, material, T&P etc. complete
Ist class brick work in 1:3 i/c all cost of labour, material & T&P etc.
M/S MALIK CONSTRUCTION (BID ID -5657082)
M/S KUNWAR PAL CONTRACTOR (BID ID -5652590)
VISHALA CIVIL CONTRACTORS AND MAINTENANCE (BID ID -5657862)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.97 MB
BOQ_1993988.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .