Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC | ₹1.5 L | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹1.7 LRejected-Finance KORBA | KORBA | CHHATTISGARH | 495119 | ₹1.7 L | L2 | Rejected-Finance Not L1 Bidder |
| 3 | L3₹2.2 LRejected-Finance | ₹2.2 L | L3 | Rejected-Finance Not L1 Bidder |
| 4 | L4₹2.3 LRejected-Finance HOUSE NO A 31 POWER CITY JAMSHEDPUR KORBA CHHATTISGARH 495450 | KORBA | CHHATTISGARH | 495450 | ₹2.3 L | L4 | Rejected-Finance Not L1 Bidder |
| Sl No | Description | Qty | Unit | SHRI LAXMI CONSTRUCTION L3 | Vijay Chandra Jha L4 | S.B Construction L2 | SHANKAR LAL KALWANI L1 |
|---|---|---|---|---|---|---|---|
| 1.00Civil Works | |||||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 38 | Cum | 95 ₹3,610 | 98.09 ₹3,727.42 | 100 ₹3,800 | 10 ₹380 |
| 1.02 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 9.9 | Cum | 140 ₹1,386 | 144.25 ₹1,428.08 | 150 ₹1,485 | 20 ₹198 |
| 1.03 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1cement : 3coarse sand : 6graded stone aggregate 40 mm nominal size) | 9.45 | Cum | 3,900 ₹36,855 | 3,885.53 ₹36,718.26 | 3,300 ₹31,185 | 2,800 ₹26,460 |
| 1.04 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:1½:3 (1cement : 1½coarse sand : 3graded stone aggregate 20 mm nominal size) | 12.71 | Cum | 4,800 ₹61,008 | 4,744.7 ₹60,305.14 | 3,800 ₹48,298 | 3,650 ₹46,391.50 |
| 1.05 | Cement concrete flooring 1:2:4 (1cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 40 mm thick with 20 mm nominal size stone aggregate | 70 | Sqm | 300 ₹21,000 | 328.36 ₹22,985.20 | 300 ₹21,000 | 210 ₹14,700 |
| 1.06 | Brick work with clay flyash brick F.P.S. (non modular), class designation 7.5 in foundation and plinth in cement mortar 1:6 ( 1 cement : 6 coarse sand ) | 2.35 | cum | 3,700 ₹8,680.20 | 3,732.69 ₹8,756.89 | 3,100 ₹7,272.60 | 3,100 ₹7,272.60 |
| 1.07 | Brick work with clay flyash F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor five level in :
- Cement mortar 1:6 (1 cement : 6 coarse sand) | 3.86 | cum | 4,700 ₹18,160.80 | 4,649.56 ₹17,965.90 | 500 ₹1,932 | 3,300 ₹12,751.20 |
| 1.08 | 12 mm cement plaster of mix : 1:6 (1cement : 6fine sand) | 33.6 | Sqm | 170 ₹5,712 | 170.59 ₹5,731.82 | 110 ₹3,696 | 115 ₹3,864 |
| 1.09 | White washing with lime to give an even shade : New work (three or more coats) | 33.6 | Sqm | 19 ₹638.40 | 19.44 ₹653.18 | 10 ₹336 | 12 ₹403.20 |
Tender Value
₹3.0 L
EMD Value
₹3,700
Closing Date
3 Sept 2025, 5:00 pmClosed
STAFF OFFICER (CIVIL) KORBA AREA SECL
Office of the General Manager, South Eastern Coalfields Limited, CIVIL DEPARTMENT, KORBA AREA KORBA- 495 677(CG)
Construction of Pachri at Bargahana village near DSB sub area under CSR Head of Korba Area.
2025_SECL_341699_1
SECL/GM/KA/C/e-Tender/25-26/81 Dt. 18.08.2025
Open Tender
Civil Works - Others
60 days
Office of the General Manager, SECL, Korba Area
As per NIT
3 documents required · 3 mandatory
₹3,700
29 Jan 2026
19 Aug 2025
5 Sept 2025
20 Aug 2025
3 Sept 2025
20 Aug 2025
20 Aug 2025 - 23 Aug 2025
Amount
Civil Works
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1cement : 3coarse sand : 6graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:1½:3 (1cement : 1½coarse sand : 3graded stone aggregate 20 mm nominal size)
Cement concrete flooring 1:2:4 (1cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 40 mm thick with 20 mm nominal size stone aggregate
Brick work with clay flyash brick F.P.S. (non modular), class designation 7.5 in foundation and plinth in cement mortar 1:6 ( 1 cement : 6 coarse sand )
Brick work with clay flyash F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor five level in : - Cement mortar 1:6 (1 cement : 6 coarse sand)
12 mm cement plaster of mix : 1:6 (1cement : 6fine sand)
White washing with lime to give an even shade : New work (three or more coats)
12 mm cement plaster finished with a floating coat of neat cement of mix : 1:4 (1 cement: 4 fine sand)
filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift.
Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Total impact of GST for the purpose of CTC
S.B Construction (BID ID -1179562)
SHRI LAXMI CONSTRUCTION (BID ID -1180067)
Vijay Chandra Jha (BID ID -1180547)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_354220.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid