Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.3 LAdmitted-Finance | -22.35% | ₹2.3 L | L1 | Admitted-Finance |
| 2 | L2₹2.9 LAdmitted-Finance | +1.00% | ₹2.9 L | L2 | Admitted-Finance |
| 3 | L3₹3.0 LAdmitted-Finance | +2.00% | ₹3.0 L | L3 | Admitted-Finance |
Tender Value
₹2.9 L
EMD Value
₹5,840
Closing Date
8 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW JAMMU
EXECUTIVE ENGINEER REW JAMMU
Construction of Bathroom at Govt. High School Bhagani Pyt. Bhagani Block Mathwar Under scheme PRIs Component District Capex Budget For the Year 2026-27 (PYT LEVEL)
2026_RDPR_317830_2
e-NIT No. 245 REWJ of 2026-27 dated 25-07-2026
Open Tender
Civil Works
Percentage
30 days
EXECUTIVE ENGINEER REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹5,840
27 Aug 2026
25 Jul 2026
10 Aug 2026
25 Jul 2026
8 Aug 2026
25 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : | 15.14 | cum | 479.3 | ₹7,256.6 |
| 2 | Providing and laying in position cement concrete (1:5:10) 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level | 1.5 | cum | 4,826.5 | ₹7,239.75 |
| 3 | Providing and laying in position of cement concrete of specified grade excluding the cost of centring and shuttering - all work upto plinth level. 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregates 20mm nominal size) | 10.5 | cum | 5,733.6 | ₹60,202.8 |
| 4 | Supply and Dumping stone including cost of stones in Horizontal on level. | 2.7 | cum | 937 | ₹2,529.9 |
| 5 | Brick work with brick of class designation 75 in foundation and plinth in cement mortar 1:6 mix. | 7.9 | cum | 7,571.55 | ₹59,815.25 |
| 6 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 7.9 | cum | 1,455.65 | ₹11,499.64 |
| 7 | CAST-IN-SITU Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 5.1.2 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.35 | cum | 9,821.85 | ₹13,259.5 |
| 8 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete . | 135 | Kg | 123.2 | ₹16,632 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundation and footings etc | 24.26 | sqm | 286.35 | ₹6,946.85 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work for: Suspended floor , Roofs , Landing. etc. | 9.32 | sqm | 718.2 | ₹6,693.62 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BOQ_1043811.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].