Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.1 CrAccepted-AOC | ₹1.1 Cr Quoted ₹2.1 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹93.7 L+₹3.3 L (1.58%)Accepted-AOC | ₹93.7 L+₹3.3 L (1.58%) Quoted ₹2.1 Cr | L-2 | Accepted-AOC Counter match L-1 |
| 3 | L-3₹2.7 Cr+₹64.1 L (30.8%)Rejected-AOC | ₹2.7 Cr+₹64.1 L (30.8%) | L-3 | Rejected-AOC L-3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical NOT MEETING WITH NIT PQC. |
| 5 | Rejected-Technical | - | - | Rejected-Technical NOT MEETING WITH NIT PQC. |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
22 Jul 2022, 3:00 pmClosed
Mr S.K. SINGH
SR. MANAGER MECHANICAL, TnC DEPARTMENT, SMELTER PLANT, NALCO, NALCONAGAR, ANGUL, ODISHA
Epoxy Coating of Duct pipes along Pot rooms A, B, E, F, G and H and connecting to FTP/GTCs inside Smelter plant.
2022_NALCO_696074_1
OMC-5529
Open Tender
Paint / Enamel Works
Item Rate
300 days
INSIDE SMELTER PLANT NALCO ANGUL
As per NIT Document
12 documents required · 12 mandatory
₹500
Yes
NATIONAL ALUMINIUM COMPANY LIMITED
₹1.3 L
Yes
10 Oct 2023
22 Jun 2022
27 Jul 2022
22 Jun 2022
22 Jul 2022
22 Jun 2022
Amount
Supplying and applying of solvent free, high volume solids (minimum solid content 75%), high build epoxy coating or equivalent materials with glass flake additives of total thickness 250 micron DFT by two part epoxy with priming coat applied by spray of minimum 100 micron and finished with another epoxy coat of minimum thickness 150 micron applied by spray, over line temperature up to 120 degree centigrade including preparation surface by power tools for removing all dust, rust & foreign materials including necessary scaffolding etc. up to the satisfaction of EIC all as per technical specifications & instruction of Manager-in-charge.
Supplying & aplying Two or more coat of High Gloss Alkyd based 1st Quality Synthetic Enamel Paint of approved brand & manufacturer of required colour/ shade meeting following specifications : - Volume of Solids - 41 % ( minimum) , Theoretical DFT/ Coat - 25 microns , Coverage 15 to 18 Sq M , Drying time at 30 Deg C - For Surface dry - 4 Hours and for hard dry - 12 Hours , shelf Life should be minimum 12 months form the date of manufacture packing . All other specifications shall be as per provisions of IS 2932 including all the required scaffolding, staging and all other enabling works complete and as indicated elsewhere in the Special conditions of contract and technical specifications etc.
Supplying and applying priming coat with ready mixed red oxide Zinc Phosphate primer of approved brand and manufacture on steel ,galvanised iron/ steel works confirming to specifications enumerated in IS 12744 including all the required scaffolding, staging and all other enabling works complete as per technical specifications , special conditions of contract etc
M/s. BINAYAK CONSTRUCTION
Demech Chemical Products Pvt. Ltd
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .