Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 2 | Not Admitted-Fee/PreQual/Technical 41 B I BAZAR NEW CANTT ALLAHABAD PRAYAGRAJ 211001 UTTAR MBL 9415216113 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 3 | Not Admitted-Fee/PreQual/Technical AZAD NAGAR COLONY OPP GOLDEN TENTILE KHEMANI ROAD ULHASNAGAR 3 DIST THANE 421003 | ULHASNAGAR | THANE | MAHARASHTRA | 421003 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical AARYA H NO 84 A PRITISUDHAJI NAGAR MANTHA ROAD JALNA 431 203 | JALNA | JALNA | MAHARASHTRA | 431203 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹20.2 Cr
EMD Value
₹10.1 L
Closing Date
7 Apr 2026, 6:00 pmClosed
Executive Engineer P.W.D. Beed
Executive Engineer P.W.D. Beed
Construction of 400 M Synthetic Athletic Track and Natural turf Football ground along with Outdoor Sports Field and Refurbishment and Extension of Indoor Hall at Beed District Sports Complex, Beed
2026_PWR_1291401_2
PWD_Beed/4e/2025-26
Open Tender
Civil Works
Item Rate
545 days
Beed
Please refer tender document
2 documents required · 2 mandatory
₹5,900
₹10.1 L
Chief Engineer, P.W. Region Chh. Sambhajinagar
17 Jun 2026
31 Mar 2026
8 Apr 2026
31 Mar 2026
7 Apr 2026
31 Mar 2026
1 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 Metre including removal and disposal of top organic soil not exceeding 150 mili metre in thickness. | 1 | One Square Metre | - | - |
| - | Dismantling brick masonry in lime or cement mortar and stacking the materils as directed with all leads, lifts etcetera | - | One Cubic metre | - | - |
| - | Dismantling stone masonry in lime or cement mortar including stacking the materils as directed with all leads, lifts etcetera | - | One Cubic metre | - | - |
| - | Dismantling the Reinforced Cement Concrete Work 1:2:4 and sorting out the materials such as steel etcetera as directed and stacking them within the specified lead as directed etcetera complete. | 1 | One Cubic metre | - | - |
| - | Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading for embankment or stacking as directed. | 1 | One Cubic Metre | - | - |
| - | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etcetera complete. (Lift upto 1.5 metre) By Mechanical Means | 1 | One Cubic Metre | - | - |
| - | Excavation for foundation in earth, soils of all types, sand,gravel and soft murum, including removing the excavated material upto a distance of 50 Metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etcetera complete. (Lift from 1.50 metre to 3.0 metre) By Manual Means | - | One Cubic Metre | - | - |
| - | Transportation of excavated material with lead & lifts away from site 3.00 km. etcetera complete as directed by Engineer in Charge. | 1 | One Cubic metre | - | - |
| - | Watering and compacting of embankment formed of materials obtained from the road cutting within a lead of 50 metre, not less than 97 % of standard Proctor density after laying them in layers of 20 centi metre to 30 centi metre with vibratory roller. | - | One Cubic Metre | - | - |
| - | Providing earth work in embankment with approved materials obtained from departmental land upto lead of 50 metre including all lifts, laying in layers of 20 centi metre to 30 centi metre thickness breaking clods, dressing to the required lines, curves, grades & section, watering and compaction with vibratory roller to achieve not less than 97 % of standard proctor density etcetera complete. (Material obtained from departmental Land) | - | One Cubic Metre | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
cancelled_1.pdf
pdf • 3.69 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
1_Krida_Sankul_Beed_Phase_I_II_Corr.pdf
Tender Documents • 2.70 MB
BOQ_2220039.xls
BOQ • 0.63 MB
Kridasankul_CSD.pdf
PDF • 3.82 MB
Corrigendum_kridaSankul7pdf_260508_164335.pdf
PDF • 0.37 MB
Corrigendum_kridaSankul6_1_05_2026.pdf
PDF • 0.37 MB
Corrigendum_kridaSankul_5pdf24_04_2026_260424_134135.pdf
PDF • 0.36 MB
Corrigendum_kridaSankul4_17_04_2026.pdf
PDF • 0.36 MB
Corrigendum_kridaSankul3_260410_154941.pdf
PDF • 0.37 MB
Corrigendum2_4e.pdf
PDF • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .