Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹76 LAccepted-AOC DCB 119 120 121 1ST FLOOR DLF CYBERCITY IDCO INFOPARK CHANDAKA INDUSTRIAL ESTATE PATIA BHUBANESWAR KHORDHA ODISHA ODISHA 751024 | KHORDHA | ODISHA | 751024 | ₹76 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.1 Cr+₹30 L (39.5%)Rejected-Finance | ₹1.1 Cr+₹30 L (39.5%) | L2 | Rejected-Finance Not Lowest |
| 3 | L3₹2.9 Cr+₹2.1 Cr (280.3%)Rejected-Finance 147 SECON PRIVATE LIMITED 7 B ROAD EPIP ZONE WHITEFIELD BANGALORE KARNATAKA 560066 | BENGALURU URBAN | KARNATAKA | 560066 | ₹2.9 Cr+₹2.1 Cr (280.3%) | L3 | Rejected-Finance Not Lowest |
| 4 | L4₹4.1 Cr+₹3.3 Cr (436.8%)Rejected-Finance | ₹4.1 Cr+₹3.3 Cr (436.8%) | L4 | Rejected-Finance Not Lowest |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | SECON PRIVATE LIMITED L3 | Ecometrix Consultants Pvt Ltd L1 | Multi Media Consultants Pvt. Ltd L4 | TTI Consulting Engineers I Pvt Ltd L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Stage B: Preparation of topographic map using Total Station and DGPS-RTK survey for the entire project area, covering major urban drains and their tributary drains, adjoining roads, terrain features, existing utilities and proposed rehabilitation works, with GIS-compatible output for hydraulic and planning analysis. | 150 | Per Km | 50,000 ₹75,00,000 | 10,000 ₹15,00,000 Lowest | 36,000 ₹54,00,000 | 15,000 ₹22,50,000 |
| 2.00 | Stage C: Assessment and analysis of existing drainage systems, catchment areas, sewage inflows, interception and diversion requirements, hydraulic capacity checks using MIKE & EPA-SWMM/HEC-RAS (as per CPHEEO norms) and preparation of planning options for rehabilitation, interception and diversion. Includes environmental and social safeguard assessments, land requirement verification, statutory clearance support, stakeholder consultations and due diligence documentation - for Uppar canal. | 1 | Job | 58,50,000 ₹58,50,000 | 25,00,000 ₹25,00,000 Lowest | 88,50,000 ₹88,50,000 | 25,00,000 ₹25,00,000 Lowest |
| 3.00 | Stage D: Assessment and analysis of existing drainage systems, catchment areas, sewage inflows, interception and diversion requirements, hydraulic capacity checks using MIKE & EPA-SWMM/HEC-RAS (as per CPHEEO norms) and preparation of planning options for rehabilitation, interception and diversion. Includes environmental and social safeguard assessments, land requirement verification, statutory clearance support, stakeholder consultations and due diligence documentation - for Karuvadikuppam Drain. | 1 | Job | 58,50,000 ₹58,50,000 | 18,00,000 ₹18,00,000 Lowest | 88,50,000 ₹88,50,000 | 33,30,000 ₹33,30,000 |
| 4.00 | Stage E: Preparation of Detailed Project Report (DPR) including designs, hydraulic modelling results, rehabilitation proposals, BoQ, cost estimates, implementation strategy and bidding documents, fully complying with CPHEEO and ADB standards - for Uppar canal. | 1 | Job | 48,50,000 ₹48,50,000 | 10,00,000 ₹10,00,000 Lowest | 88,50,000 ₹88,50,000 | 12,60,000 ₹12,60,000 |
| 5.00 | Stage F: Preparation of Detailed Project Report (DPR) including designs, hydraulic modelling results, rehabilitation proposals, BoQ, cost estimates, implementation strategy and bidding documents, fully complying with CPHEEO and ADB standards - for Karuvadikuppam Drain. | 1 | Job | 48,50,000 ₹48,50,000 | 8,00,000 ₹8,00,000 Lowest | 88,50,000 ₹88,50,000 | 12,60,000 ₹12,60,000 |
Tender Value
Refer Docs
EMD Value
₹5 L
Closing Date
29 Oct 2025, 4:00 pmClosed
The Executive Engineer, ID., PWD., Puducherry.
The Executive Engineer, Irrigation Division, PWD., No.3, Eveche Street, Puducherry.
Consultancy Services for Preparation of Detailed Project Report (DPR) for Interception, Diversion and Rehabilitation of Major Urban Drains in Puducherry
2025_PWDC2_19838_1
TN.152/PW/IRRN/2025-2026/RFP
Open Tender
Civil Works
Item Rate
90 days
Puducherry
Please Refer Tender Documents
3 documents required · 3 mandatory
₹11,800
₹5 L
Conference Hall, Central Office, PWD., Pdy.
2 Jun 2026
16 Sept 2025
30 Oct 2025
16 Sept 2025
29 Oct 2025
22 Sept 2025
22 Sept 2025 - 6 Oct 2025
6 Oct 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Stage B: Preparation of topographic map using Total Station and DGPS-RTK survey for the entire project area, covering major urban drains and their tributary drains, adjoining roads, terrain features, existing utilities and proposed rehabilitation works, with GIS-compatible output for hydraulic and planning analysis. | 150 | Per Km | - | - |
| 2 | Stage C: Assessment and analysis of existing drainage systems, catchment areas, sewage inflows, interception and diversion requirements, hydraulic capacity checks using MIKE & EPA-SWMM/HEC-RAS (as per CPHEEO norms) and preparation of planning options for rehabilitation, interception and diversion. Includes environmental and social safeguard assessments, land requirement verification, statutory clearance support, stakeholder consultations and due diligence documentation - for Uppar canal. | 1 | Job | - | - |
| 3 | Stage D: Assessment and analysis of existing drainage systems, catchment areas, sewage inflows, interception and diversion requirements, hydraulic capacity checks using MIKE & EPA-SWMM/HEC-RAS (as per CPHEEO norms) and preparation of planning options for rehabilitation, interception and diversion. Includes environmental and social safeguard assessments, land requirement verification, statutory clearance support, stakeholder consultations and due diligence documentation - for Karuvadikuppam Drain. | 1 | Job | - | - |
| 4 | Stage E: Preparation of Detailed Project Report (DPR) including designs, hydraulic modelling results, rehabilitation proposals, BoQ, cost estimates, implementation strategy and bidding documents, fully complying with CPHEEO and ADB standards - for Uppar canal. | 1 | Job | - | - |
| 5 | Stage F: Preparation of Detailed Project Report (DPR) including designs, hydraulic modelling results, rehabilitation proposals, BoQ, cost estimates, implementation strategy and bidding documents, fully complying with CPHEEO and ADB standards - for Karuvadikuppam Drain. | 1 | Job | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.37 MB
Tendernotice_2.pdf
PDF • 0.48 MB
Tendernotice_3.pdf
PDF • 1.24 MB
BOQ_20219.xls
BOQ • 0.24 MB
TN152clearcopy.pdf
PDF • 3.94 MB
TN152prebid.pdf
PDF • 4.36 MB
152corrigendumRFP.pdf
PDF • 0.31 MB
152corrigendumRFP.pdf
PDF • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .