Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-Finance | L1 | Accepted-Finance FIRST LOWEST | |
| 2 | L2₹1.9 L+₹1,803.54 (0.94%)Rejected-Finance | L2 | Rejected-Finance SECOND LOWEST | |
| 3 | L3₹1.9 L+₹1,890.24 (0.98%)Rejected-Finance | L3 | Rejected-Finance THIRD LOWEST |
Tender Value
₹1.9 L
EMD Value
₹2,000
Closing Date
3 Apr 2023, 12:00 pmClosed
SE EDC
AMAN SAHEED HAMIRPUR
INCREASING CAPACITY OF TRANSFORMER UNDER EDD HAMIRPUR
2023_DVVNL_789372_1
88/SE/EDCH/2022-23
Open Tender
Electrical Works
Item Wise
HAMIRPUR
PQC
2 documents required · 2 mandatory
₹1,180
SE EDC
₹2,000
Yes
13 Apr 2023
24 Mar 2023
3 Apr 2023
24 Mar 2023
3 Apr 2023
24 Mar 2023
24 Mar 2023 - 3 Apr 2023
Amount
Cartage of 8.5 Mtr Poles from Store Hamirpur or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including etc. and also including the cost of labor, T & P carrier etc. required for proper completion of work.
Cartage of line material viz. Stone Pad, Top Channel, Dropper Channel, Dise Insulator, and other line material from ESC/ASK Store, Hamirpur or any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends, including the work of its dragging etc. and also including the cost of labor, T&P and carrier etc. required for proper completion of work.
Erection of single support of 8.5 Mtr. (any Other Place)Follwing Poles including complete H.T./L.T. fittings as per RESSPO manual and as per direction of Engineer in charge the cost of labor, T&P and carrier etc. required for proper completion of word.
Grouting of Single Support 8.5Mtr. poles as per RESSPO manual and as per direction of engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement sand & bricks ballast/ stone ballast in ratio 1:4:8(0.285cu.mtr. Each) including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirment.
Erection of Double support of (any Other Place) Poles including complete H.T./L.T. fittings as per RESSPO manual and as per direction of Engineer in charge the cost of labor, T&P and carrier etc. required for proper completion of work.
Grouting of Double Pole 8.5 Mtr. poles as per RESSPO manual and as per direction of engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement sand & bricks ballast/ stone ballast in ratio 1:4:8(0.285cu.mtr. Each) including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirment.
Erection of stay set including the work of nuzzling etc. as per RESSPO manual.
Erection of Earthing complete as per direction of supervising engineer.It includes the cost of labour,T &P carrier etc. required for proper completion of work
Laying, sagging, stringing, binding and jump ring etc. of ACSR Wesel conductor new/old on the newly erected pole any other place. as per RESSPO manual and as per direction of supervising engineer.
Laying, sagging, stringing, binding and jump ring etc. of ABC cable 3x50+1x35+1x16mm new/old on the newly erected pole any other place. as per RESSPO manual and as per direction of supervising engineer.
Laying, sagging, stringing, binding and jump ring etc. of ABC cable 3x95+1x70+1x16mm new/old on the newly erected pole any other place. as per RESSPO manual and as per direction of supervising engineer.
Gouting of stay set as per RESSPO manual. And also including the cost of all grouting material, labour T&P etc. required for proper completion of work .
Tree Chopping of 11kv Line near by 11kv H.T. Line & L.T. Line any other place.
Febriction of 11kv V Type X-Arms(16mm Hole, 2no each V Type X-Arms) as per RESSPO Dragging.with Loading, Unloading & Cartage, all Complete Work.
Febriction of 11kv Sub-Station Base Angle (16mm Hole 4no each S/S Base Angle) as per RESSPO Dragging. with Loading, Unloading & Cartage, all Complete Work.
Febriction of 11kv Dropper Channel (16mm Hole, 7no each Dropper Channel) as per RESSPO Dragging.with Loading, Unloading & Cartage, all Complete Work.
Febriction of 11kv Top Channel (16mm & Hole 10 no each Top Channel) as per RESSPO Dragging. with Loading, Unloading & Cartage, all Complete Work.
Febriction of T-Off Channel100x50x1300 (16mm Hole 8no each T-off Channel) as per RESSPO Dragging. with Loading, Unloading & Cartage, all Complete Work
MS Nut , Bolt & Washers. Diffirent Size.
Fixing & Erection of 11kv V Type X-Arms as per RESSPO Dragging. All Complete Work
Fixing & Erection of 11kv Sub-Station Base Angle 75x75x6x2028mm as per RESSPO Dragging. All Complete Work
Fixing & Erection of 11kv Dropper Channel as per RESSPO Dragging. All Complete Work
Fixing & Erection of 11kv Top Channel as per RESSPO Dragging.All Complete Work
Erection of 11kv T-Off Channel100x50x1300 as per RESSPO Dragging. All Complete Work
Safely Cartage of 100kva new T/F From Store centre Hamirpur To Mohalla Khanka Maudaha, Nayak Purwa, Khandeh, Reevan & Near Nautanki Maidan Kurara of new/Repaired Thee phase T/F.
Unloading & Installation of 100kva new Transformer on the newly New Sub-Station in Mohalla Khanka Maudaha, Nayak Purwa, Khandeh, Reevan & Near Nautanki Maidan Kurara & proper alignment and as per direction of supervising engineer/RESSPO manual.
Erection of Allumunium Lug.
Erectionof LT PVC Allumunium cable .Diffirent Size
Erection & Installation of DO Fuse Set
Erection & Installation of TPMO Set
JMC Enterprises
M/S JAGMOHAN SINGH CONTRACTOR
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .