| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAccepted-Finance | ₹8.8 L | L1 | Accepted-Finance Accepted |
| 2 | L2₹9.5 LRejected-Finance | ₹9.5 L | L2 | Rejected-Finance Rejected |
| 3 | L3₹12.7 LRejected-Finance V P O PATTA BRAWARI TEHSIL DISTRICT SOLAN H P 173207 | SOLAN | SOLAN | HIMACHAL PRADESH | 173207 | ₹12.7 L | L3 | Rejected-Finance Rejected |
| 4 | L4₹13.4 LRejected-Finance VILL JADAINEE HATHNI KI DHATO P O BYCHARI VIA TOTU TEHSIL DISTT SHIMLA HP | SHIMLA | HIMACHAL PRADESH | 171001 | ₹13.4 L | L4 | Rejected-Finance Rejected |
| 5 | L5₹13.8 LRejected-Finance VILL KATHAYAR PO LARJI TEHSIL SAINJ DISTT KULLU H P | ₹13.8 L | L5 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | Parmod Kumar Thakur L4 | Hira singh manta L1 | Harish kumar L3 | Build Himachal Construction And Supply L2 | Rakesh Thakur L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation, trenches in each work, in all kinds of soil such as kankar, murram, conglomerate and decomposed or loose soil by pick, jumper work, blasting, in soft or haRD rock or by chiseling and including removal of black top in all leads and lifts and then stacking the excavated soil not more than 3 meters clear from the edge of excavation and then returning the stacked soil in 1.5 cm layers, when required in to plinths, sides of foundations etc. consolidating each deposited layers by ramming and watering and then disposing off all surplus excavated earth in all leads and lifts and as per directions of Engineer-in-Charge. (P & J work complete.) | 102.5 | Cum | 295 ₹30,237.50 | 290 ₹29,725 | 220 ₹22,550 | 300 ₹30,750 | 300 ₹30,750 |
| 2.00Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish. Including centring,shuttering strutting and propping etc. with wooden battens and ballies height of propping and centring below supporting floor to ceiling not exceeding 4mtrs and removal of the same for insitu reinforced concrete and plain concrete work in:- | ||||||||
| 2.01 | Vertical surfaces such as walls(any thickness) partitions and the pillasters, buttresses, plinth and string a) courses and the like | 384 | SQM | 275 ₹1.1 L | 180 ₹69,120 | 325 ₹1.2 L | 300 ₹1.2 L | 280 ₹1.1 L |
| 3.00 | Providing & laying cement concrete 1:5:10 (1 cement: 5 Sand :10 graded stone aggregate 20mm nominal size) and 3 curing complete excluding cost of form work in foundation & plinth including all lead & lifts complete in all respects | 190.59 | Cum | 6,300 ₹12.0 L | 4,099 ₹7.8 L | 5,870 ₹11.2 L | 4,200 ₹8.0 L | 6,500 ₹12.4 L |
Tender Value
₹15.9 L
EMD Value
₹31,705
Closing Date
16 Feb 2026, 3:00 pmClosed
Executive Engineer
Jal Shakti Division Dharampur Distt. Solan H.P.
RRD to WSS to various villages in Kasauli Constituency from Giri River Sub Head Construction of protection block at RD s 12600 13050 13700 to 13900 14100 to 14400 15100 to 15300 15600 to 16300 17100 to 17300 18400 to 18600 and 18950 to 19800
2026_HPIPH_127366_1
JSV-EE-DMP-CB-TA-NIT/2025- 20000-20099 dated 03.02.2026
Open Tender
Civil Works - Others
30 days
In Dharampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹31,705
28 Feb 2026
4 Feb 2026
17 Feb 2026
4 Feb 2026
16 Feb 2026
4 Feb 2026
4 Feb 2026 - 16 Feb 2026
Excavation in foundation, trenches in each work, in all kinds of soil such as kankar, murram, conglomerate and decomposed or loose soil by pick, jumper work, blasting, in soft or haRD rock or by chiseling and including removal of black top in all leads and lifts and then stacking the excavated soil not more than 3 meters clear from the edge of excavation and then returning the stacked soil in 1.5 cm layers, when required in to plinths, sides of foundations etc. consolidating each deposited layers by ramming and watering and then disposing off all surplus excavated earth in all leads and lifts and as per directions of Engineer-in-Charge. (P & J work complete.)
Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish. Including centring,shuttering strutting and propping etc. with wooden battens and ballies height of propping and centring below supporting floor to ceiling not exceeding 4mtrs and removal of the same for insitu reinforced concrete and plain concrete work in:-
Vertical surfaces such as walls(any thickness) partitions and the pillasters, buttresses, plinth and string a) courses and the like
Providing & laying cement concrete 1:5:10 (1 cement: 5 Sand :10 graded stone aggregate 20mm nominal size) and 3 curing complete excluding cost of form work in foundation & plinth including all lead & lifts complete in all respects
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.77 MB
BOQ_188046.xls
BOQ • 0.30 MB
Form_8.pdf
Tender Documents • 0.81 MB
Terms_Conditions.pdf
Tender Documents • 0.16 MB
Form_6.pdf
Tender Documents • 0.40 MB
Download all tender documents and submit your bid