| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.7 CrAccepted-AOC NA | ₹2.7 Cr Quoted ₹2.0 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹2.0 Cr+₹3.1 L (1.55%)Rejected-AOC MANDIPORA TEHSIL DOORU DISTRICT ANANTNAG | MANDIPORA | ANANTNAG | JAMMU KASHMIR | ₹2.0 Cr+₹3.1 L (1.55%) | 2 | Rejected-AOC l 2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical The proposed programme of construction and Quality Management Plan proposed for all the works as per technical specifications is not Attached as per SBD Section 2 Clause X(VI) |
Tender Value
₹4.4 Cr
EMD Value
₹8.9 L
Closing Date
12 Jun 2026, 5:00 pmClosed
Superintending Engineer PMGSY Circle Batote
Office of the Superintending Engineer PMGSY Circle Batote at PW(RANDB) Department Store Near Fire Station Batote
Construction and Maintenance of Road L041-(Link Road) Badgam to KhouraPackage No. JK19-4024, PMGSY-IV, Batch-I of 2026-27, Block-Banihal, District Ramban Length 1.750 Kms Adv. Cost excluding maintenance but inclusive of GST-Rs. 409.96 Lacs
2026_JKRRD_147802_1
JK194024
Open Tender
Civil Works - Roads
Percentage
300 days
Superintending Engineer PMGSY Circle Batote
Please refer Tender documents.
8 documents required · 8 mandatory
₹10,000
₹8.9 L
Superintending Engineer PMGSY Circle Batote
23 Jul 2026
21 May 2026
15 Jun 2026
21 May 2026
12 Jun 2026
23 May 2026
22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in Hilly Roads:- Excavation in all kinds of soil, Soft Rock & Hard Rock, by mechanical means including cutting and trimming of side slopes & disposing of Excavated earth with all lift and leads as directed for safe disposal of un-serviceable/surplus excavated material without damaging private/public property As per Technical specification clause 1603.1. and 1603.2 . | 26,448.04 | Cum | 0.8 | ₹21,131.98 |
| 2 | Construction of embankment with approved material deposited at site from roadway cutting and excavation from from drain and foundation of other structures graded and compacted to meet requirement of tables 300.1 and 300.2 as per technical specification clause 301.5. | 3,906.97 | cum | - | - |
| 3 | Excavation for Structures:- Earthwork in excavation for structures in all kinds of soil, soft and hard rock as per drawings and Technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposing of surplus, un-serviceable Excavated earth as directed at site for safe disposal of same without damaging private/public property, dressing of sides and bottom and backfilling in trenches with excavated suitable material including de watering if required. | 1,707.48 | Cum | - | - |
| 4 | Providing and laying of plain cement concrete of Grade M-10 in open foundations complete as per drawings and Technical specifications. Clause 802, 803, 1202 & 1203. including all leads, lifts and carriages of materials by MT complete. | 236.61 | Cum | 1 | ₹236.37 |
| 5 | Providing and laying of plain cement concrete of Grade M-15 in Foundation complete as per drawings & Technical specification Clauses 802, 804, 805, 806, 807, 1202 & 1204. Including cost of curing and form work, all leads, lifts and carriages of materials by MT complete. | 148.94 | Cum | 1 | ₹148.79 |
| 6 | Providing and laying of plain cement concrete of Grade M-15 in substructure complete as per drawings & Technical specification Clauses 802, 804, 805, 806, 807, 1202 & 1204. Including cost of curing and form work, all leads, lifts and carriages of materials by MT complete. | 894.29 | Cum | 1 | ₹893.4 |
| 7 | Providing and laying reinforced cement concrete of Grade M-25 in super structure complete as per drawings & Technical specification Clauses 802, 804, 805, 806, 807, 1202, 1204, 1205.4 & 1205.5 . Including cost of curing ,and form work , all leads, lifts and carriages of materials by MT complete. | 1 | Cum | - | - |
| 8 | Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Super Structure including bending, binding complete as per drawings & Technical specification Clauses 1002, 1010 and 1202 including cost of binding wire and also including, all leads , lifts, handling & re-handling and carriage of materials by MT complete. | - | MT | - | - |
| 9 | Polygonal/Random Rubble Masonry laid Dry un coursed brought to course in sub structure including cost of bond/through stones, all leads, lifts, carriages,of materials by MT handling and re-handling complete. | 589.91 | Cum | 1 | ₹589.32 |
| 10 | Polygonal/Random Rubble Masonry un coursed brought to course in cement mortar 1:6 (1 cement :6 fine sand) in sub- structure including leveling up as specified level with M-5 including cost of through/bond stones , all leads, lifts, carriages of materials by MT handling, and re-handling complete. | 852.21 | Cum | 1 | ₹851.36 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.93 MB
BOQ_230664.xls
BOQ • 0.31 MB
04SBDBanihalBadgam.pdf
Tender Documents • 2.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .